Printable · GCSE Higher · ages 14-16
Gradients and areas under graphs worksheet — GCSE Higher
Fifteen questions on "gradients and areas under graphs" — DfE statement A15. Print it, or print three versions so neighbours cannot copy by letter; the key gives the letter for each version.
Higher only
Answer key: Gradients and areas under graphs worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) 300 m — For a constant speed, the speed-time graph is a horizontal line, and the area underneath is a rectangle: distance = speed × time = 15 × 20 = 300 m. Adding the two numbers instead of multiplying gives 35 m; dividing instead of multiplying gives 1.33 m; halving the product, as you would for a triangle, gives 7.5 m — but this section of the graph is a rectangle, not a triangle, so there is no halving to do.
- (c) 64 m — The distance travelled is the area under the speed-time graph. From t = 0 to t = 4, the shape is a triangle with base 4 and height 8, area 1/2 × 4 × 8 = 16. From t = 4 to t = 10, the shape is a rectangle with base 6 and height 8, area 6 × 8 = 48. Total distance: 16 + 48 = 64 m. Treating the whole 10 seconds as a single trapezium with parallel sides 0 and 8 and width 10, instead of splitting it into the triangle and rectangle, gives 40 m. Ignoring the acceleration phase completely and assuming the car travels at a constant 8 m/s for all 10 seconds gives 8 × 10 = 80 m. Misreading the second interval as running from t = 4 to t = 8 instead of t = 4 to t = 10 gives a rectangle area of 4 × 8 = 32, plus the correct triangle of 16, totalling 48 m.
- (d) The cost increases by about £10 per extra item — Gradient = change in cost ÷ change in items = (800 − 400) ÷ (70 − 30) = 400 ÷ 40 = 10. The units of the gradient are £ per item, so the cost is increasing by about £10 for every extra item produced, near x = 50. Subtracting in the wrong order, (400 − 800) ÷ (70 − 30) = −10, gives the right size but the wrong sign — check which point comes first each time. Leaving out the division by 40 gives £400 per item; dividing the wrong way round, 40 ÷ 400 = 0.1, gives £0.10 per item.
- (a) 271 m — The reading at t = 12 isn't in the table, so it must be interpolated between t = 10 (35 m/s) and t = 14 (27 m/s): the velocity falls by 8 m/s over the 4-second gap, so over 2 seconds it falls by 4 m/s, giving 35 − 4 = 31 m/s. The trapezium rule then uses three strips of unequal width, 4, 6 and 2 seconds, with areas of 40, 165 and 66: 40 + 165 + 66 = 271 m. Writing 267 m comes from skipping the interpolation and using the table's t = 14 reading, 27, directly as the height at t = 12. Writing 282 m comes from treating all three strips as though they were 4 seconds wide, instead of using the true gaps of 4, 6 and 2 seconds between the readings. Writing 275 m comes from using the t = 10 reading, 35, at both ends of the final strip, instead of interpolating a new value at t = 12.
- (d) 168 m — Split the area under the graph into two parts. The rising section (0 to 8 s) is a triangle: area = 0.5 × 8 × 12 = 48. The constant section, from 8 s to 18 s (10 s), is a rectangle: area = 12 × 10 = 120. Total distance = 48 + 120 = 168 m. Leaving out the 0.5 doubles the triangle, giving 8 × 12 + 120 = 216 m; ignoring the triangle section altogether gives only 120 m; averaging the start and final speeds over the whole 18 seconds, (0 + 12) ÷ 2 = 6, then 6 × 18 = 108 m, wrongly treats the tram as accelerating the whole time, when the graph is flat for the last 10 seconds.
- (b) The total volume of water, in litres, that has flowed in. — On a rate-time graph, the y-axis is in litres per minute and the x-axis is in minutes; multiplying a rate by a time gives litres per minute × minutes = litres, a total volume. So the area under the graph represents the total volume of water that has flowed in. Thinking the area itself represents the rate, rather than what the rate accumulates to, gives the wrong claim about the average rate of flow. Confusing the area with the gradient of the graph — which measures how the rate is changing — gives the wrong claim about litres per minute squared. Ignoring the flow-rate axis and focusing only on the time axis gives the wrong claim that the area is simply the total time.
- (c) Fastest at t = 2 min — steepest gradient. — The rate of cooling is given by the size (magnitude) of the gradient, ignoring its sign — the steeper the tangent, the faster the temperature is changing. Of −8, −3 and −0.5, the gradient −8 has the greatest magnitude, so the tea is cooling fastest at t = 2 minutes. 'Fastest at t = 20 min — largest gradient' confuses the signed value with the size of the rate: −0.5 is the largest NUMBER of the three, but it's the smallest in magnitude, meaning the tea is barely cooling at all by then. 'Cools at the same rate throughout' ignores that the three gradients are different sizes, not just all negative. 'Fastest at t = 10 min — the middle reading' isn't a mathematical reason at all — the gradients themselves have to be compared, not their position in the list.
- (d) 40 m — Each trapezium has width 2. Its area is width × the average of its two heights. Strip 1: average of 0 and 5 is 2.5, so area = 2 × 2.5 = 5. Strip 2: average of 5 and 9 is 7, so area = 2 × 7 = 14. Strip 3: average of 9 and 12 is 10.5, so area = 2 × 10.5 = 21. Total distance = 5 + 14 + 21 = 40 m. Leaving out the division by 2 in the averaging step doubles every strip, giving 80 m instead of 40 m. Using only the LEFT height of each strip as a rectangle, 0 × 2 + 5 × 2 + 9 × 2 = 28, or only the RIGHT height, 5 × 2 + 9 × 2 + 12 × 2 = 52, both ignore that the graph curves between the two ends of each strip — always average the two heights of a trapezium, never use just one of them.
- (a) Underestimate: the chord lies below the curve — For a curve that is concave down (bending downward), the straight line joining any two points on the curve lies BELOW the curve. The trapezium's top edge is this straight line, so the trapezium's area is smaller than the true area under the curve — the trapezium rule UNDERESTIMATES the distance in this case. This is because a curve whose gradient keeps decreasing bends away from any chord joining two of its points, dropping the chord below every point of the curve in between. The reverse, a chord lying above the curve, is the rule for a concave-up curve, not this one — check which way the curve bends before deciding. The trapezium rule does not always overestimate or underestimate, and it is not exact except when the graph really is a straight line.
- (d) Overestimate — the curve bends upward (convex). — The first differences of the speeds are 3, 5, 7 and 9, so the second differences are 2, 2 and 2 — constant and positive, which means the speed-time graph curves upwards (is convex). On a convex curve, each straight chord used by the trapezium rule lies above the curve, so the trapezium rule overestimates the true distance. 'Underestimate — the curve bends upward' states the same correct geometry but gets the conclusion backwards — a chord above the curve means too much area is counted, not too little. 'Overestimate — the speed values are increasing' uses the wrong evidence: increasing speed alone doesn't tell you whether the curve bends up or down, only the second differences do. 'Underestimate — second differences are constant' confuses a constant second difference with a steady rate of change in speed, which isn't what the second difference of a speed-time table measures.
- (c) 2 — At x = 1, y = 1² − 3(1) = 1 − 3 = −2. At x = 4, y = 4² − 3(4) = 16 − 12 = 4. Gradient of the chord = change in y ÷ change in x = (4 − (−2)) ÷ (4 − 1) = 6 ÷ 3 = 2. Writing down the change in y, 6, and stopping there without dividing by the change in x gives 6. Losing the negative sign on y = −2 at x = 1 and treating it as +2 gives (4 − 2) ÷ (4 − 1) = 2 ÷ 3 = 2/3. Dividing the wrong way round, change in x ÷ change in y, gives (4 − 1) ÷ (4 − (−2)) = 3 ÷ 6 = 1/2.
- (b) 19 — A line through (x₁, y₁) with gradient m has equation y − y₁ = m(x − x₁). Substituting (6, 1) and m = −3: y − 1 = −3(x − 6), so y = −3x + 18 + 1, which simplifies to y = −3x + 19; at x = 0 this gives 19. Making a sign error when distributing, writing −3(x − 6) as −3x − 18 instead of −3x + 18, gives the wrong line y = −3x − 17, so −17 at x = 0. Forgetting to add the y₁ = 1 at the end, using y = −3(x − 6) alone, gives 18 at x = 0. Substituting the y-coordinate into the gradient term instead of using x, working out 1 + (−3 × 1), gives −2.
- (d) 2 — The gradient between two points on a line is the change in y divided by the change in x. Using (5, 2) and (0, −8): (2 − (−8)) ÷ (5 − 0) = 10 ÷ 5 = 2. Inverting the fraction, dividing the change in x by the change in y instead, gives 5 ÷ 10 = 0.5. Reversing the order of the x-values in the denominator, giving (2 − (−8)) ÷ (0 − 5) = 10 ÷ (−5), gives −2. Misreading the y-intercept as 8 instead of −8, giving (2 − 8) ÷ 5 = −6 ÷ 5, gives −1.2.
- (b) 235 litres — The flow rate at t = 10 is the gradient of the tangent: change in volume ÷ change in time = (190 − 130) ÷ (12 − 8) = 60 ÷ 4 = 15 litres per minute. Treating this rate as roughly constant for a short interval, the volume 5 minutes after t = 10 is estimated as 160 + 5 × 15 = 235 litres. Using the tangent's own point spacing — 2 minutes, from t = 10 to t = 12 — instead of the 5 minutes actually asked for gives 160 + 2 × 15 = 190, which is just the volume already given at one of the tangent's own points, not an answer to the question asked. Multiplying the gradient by the time WITHOUT adding the starting volume, 5 × 15 = 75, forgets that a rate estimates a CHANGE, which must be added to the starting volume, not given as the answer on its own. Subtracting instead of adding, 160 − 5 × 15 = 85, extrapolates backward in time rather than forward.
- (b) 14 m/s — Average speed for a whole journey is total distance divided by total time: 350 ÷ 25 = 14 m/s. Multiplying the distance and time instead of dividing gives 350 × 25 = 8750 m/s. Adding the distance and time instead of dividing gives 350 + 25 = 375 m/s. Inverting the division, working out time divided by distance, gives 25 ÷ 350, which rounds to 0.07 m/s.
Build your own mix at the worksheet builder.