Printable · GCSE Higher · ages 14-16
Gradients and areas under graphs worksheet — GCSE Higher
Fifteen questions on "gradients and areas under graphs" — DfE statement A15. Print it, or print three versions so neighbours cannot copy by letter; the key gives the letter for each version.
Higher only
Answer key: Gradients and areas under graphs worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) 235 litres — The flow rate at t = 10 is the gradient of the tangent: change in volume ÷ change in time = (190 − 130) ÷ (12 − 8) = 60 ÷ 4 = 15 litres per minute. Treating this rate as roughly constant for a short interval, the volume 5 minutes after t = 10 is estimated as 160 + 5 × 15 = 235 litres. Using the tangent's own point spacing — 2 minutes, from t = 10 to t = 12 — instead of the 5 minutes actually asked for gives 160 + 2 × 15 = 190, which is just the volume already given at one of the tangent's own points, not an answer to the question asked. Multiplying the gradient by the time WITHOUT adding the starting volume, 5 × 15 = 75, forgets that a rate estimates a CHANGE, which must be added to the starting volume, not given as the answer on its own. Subtracting instead of adding, 160 − 5 × 15 = 85, extrapolates backward in time rather than forward.
- (b) The total volume of water, in litres, that has flowed in. — On a rate-time graph, the y-axis is in litres per minute and the x-axis is in minutes; multiplying a rate by a time gives litres per minute × minutes = litres, a total volume. So the area under the graph represents the total volume of water that has flowed in. Thinking the area itself represents the rate, rather than what the rate accumulates to, gives the wrong claim about the average rate of flow. Confusing the area with the gradient of the graph — which measures how the rate is changing — gives the wrong claim about litres per minute squared. Ignoring the flow-rate axis and focusing only on the time axis gives the wrong claim that the area is simply the total time.
- (a) 25 — Gradient = change in y ÷ change in x = (100 − 0) ÷ (4 − 0) = 100 ÷ 4 = 25. Dividing time by distance instead of distance by time gives 0.04; multiplying the two values instead of dividing gives 400; stopping at the change in distance, 100, forgets to divide by the change in time.
- (b) 19 — A line through (x₁, y₁) with gradient m has equation y − y₁ = m(x − x₁). Substituting (6, 1) and m = −3: y − 1 = −3(x − 6), so y = −3x + 18 + 1, which simplifies to y = −3x + 19; at x = 0 this gives 19. Making a sign error when distributing, writing −3(x − 6) as −3x − 18 instead of −3x + 18, gives the wrong line y = −3x − 17, so −17 at x = 0. Forgetting to add the y₁ = 1 at the end, using y = −3(x − 6) alone, gives 18 at x = 0. Substituting the y-coordinate into the gradient term instead of using x, working out 1 + (−3 × 1), gives −2.
- (d) 680 m — First find how long the acceleration takes: acceleration = change in speed ÷ time, so 2.5 = 20 ÷ t, giving t = 20 ÷ 2.5 = 8 seconds. The distance during this phase is the area of a triangle with base 8 and height 20: 1/2 × 8 × 20 = 80 m. The distance during the constant-speed phase is 20 × 30 = 600 m, since distance = speed × time at a constant speed. The total distance is 80 + 600 = 680 m. Using the given 30 seconds for the acceleration phase as well, 1/2 × 30 × 20 = 300, plus the correct 600, gives 900 m — but 30 seconds is only stated for the constant-speed phase. Leaving out the 1/2 and using the full rectangle for the acceleration phase, 8 × 20 = 160, plus the correct 600, gives 760 m — the speed is not constant during acceleration, so this area is a triangle, not a rectangle. Swapping the two times round, and using 8 seconds for the constant-speed distance instead of 30, 20 × 8 = 160, plus the correct triangle area of 80, gives 240 m.
- (c) 81 m — Split the velocity-time graph into its three phases. The accelerating phase (0 to 4 s) is a triangle: 1/2 × 4 × 6 = 12. The constant phase (4 s at 6 m/s, for 10 s) is a rectangle: 10 × 6 = 60. The decelerating phase (3 s) is a triangle: 1/2 × 3 × 6 = 9. Total distance: 12 + 60 + 9 = 81 m. Forgetting the final decelerating phase entirely and adding only the first two areas gives 12 + 60 = 72 m. Treating all three phases as rectangles, forgetting to halve either triangular phase, gives 4 × 6 + 10 × 6 + 3 × 6 = 102 m. Halving only the deceleration triangle correctly but treating the acceleration phase as a rectangle too gives 4 × 6 + 60 + 9 = 93 m.
- (d) 40 m — Each trapezium has width 2. Its area is width × the average of its two heights. Strip 1: average of 0 and 5 is 2.5, so area = 2 × 2.5 = 5. Strip 2: average of 5 and 9 is 7, so area = 2 × 7 = 14. Strip 3: average of 9 and 12 is 10.5, so area = 2 × 10.5 = 21. Total distance = 5 + 14 + 21 = 40 m. Leaving out the division by 2 in the averaging step doubles every strip, giving 80 m instead of 40 m. Using only the LEFT height of each strip as a rectangle, 0 × 2 + 5 × 2 + 9 × 2 = 28, or only the RIGHT height, 5 × 2 + 9 × 2 + 12 × 2 = 52, both ignore that the graph curves between the two ends of each strip — always average the two heights of a trapezium, never use just one of them.
- (d) Overestimate — the curve bends upward (convex). — The first differences of the speeds are 3, 5, 7 and 9, so the second differences are 2, 2 and 2 — constant and positive, which means the speed-time graph curves upwards (is convex). On a convex curve, each straight chord used by the trapezium rule lies above the curve, so the trapezium rule overestimates the true distance. 'Underestimate — the curve bends upward' states the same correct geometry but gets the conclusion backwards — a chord above the curve means too much area is counted, not too little. 'Overestimate — the speed values are increasing' uses the wrong evidence: increasing speed alone doesn't tell you whether the curve bends up or down, only the second differences do. 'Underestimate — second differences are constant' confuses a constant second difference with a steady rate of change in speed, which isn't what the second difference of a speed-time table measures.
- (a) 120 m — The gradient of the second line is (0 − V)/(9 − 6) = −V/3, and this equals −8, so V = 24. The distance from t = 0 to t = 6 is the area of a trapezium with parallel sides 4 and 24 and width 6: 1/2 × (4 + 24) × 6 = 84. The distance from t = 6 to t = 9 is the area of a triangle with base 3 and height 24: 1/2 × 3 × 24 = 36. The total distance is 84 + 36 = 120 m. Using V = 8, treating the gradient's number as the missing velocity itself rather than solving −V/3 = −8 for V, gives a trapezium area of 1/2 × (4 + 8) × 6 = 36 and a triangle area of 1/2 × 3 × 8 = 12, a total of 48 m. Leaving out the 1/2 in the trapezium formula, (4 + 24) × 6 = 168, plus the correct triangle of 36, gives 204 m. Using the full 6 seconds as the triangle's base instead of the 3 seconds the second line actually lasts, 1/2 × 6 × 24 = 72, plus the correct trapezium of 84, gives 156 m.
- (d) 300 m — For a constant speed, the speed-time graph is a horizontal line, and the area underneath is a rectangle: distance = speed × time = 15 × 20 = 300 m. Adding the two numbers instead of multiplying gives 35 m; dividing instead of multiplying gives 1.33 m; halving the product, as you would for a triangle, gives 7.5 m — but this section of the graph is a rectangle, not a triangle, so there is no halving to do.
- (a) 4 — The gradient of a straight line through two points is the change in y divided by the change in x. Change in y = 21 − 5 = 16. Change in x = 6 − 2 = 4. Gradient = 16 ÷ 4 = 4. Dividing x by y instead of y by x gives 0.25; forgetting to divide by the change in x at all leaves 16; dividing by only one of the two x-coordinates, 16 ÷ 2 = 8, uses the wrong denominator.
- (c) Fastest at t = 2 min — steepest gradient. — The rate of cooling is given by the size (magnitude) of the gradient, ignoring its sign — the steeper the tangent, the faster the temperature is changing. Of −8, −3 and −0.5, the gradient −8 has the greatest magnitude, so the tea is cooling fastest at t = 2 minutes. 'Fastest at t = 20 min — largest gradient' confuses the signed value with the size of the rate: −0.5 is the largest NUMBER of the three, but it's the smallest in magnitude, meaning the tea is barely cooling at all by then. 'Cools at the same rate throughout' ignores that the three gradients are different sizes, not just all negative. 'Fastest at t = 10 min — the middle reading' isn't a mathematical reason at all — the gradients themselves have to be compared, not their position in the list.
- (c) The object was stationary (not moving) — On a distance-time graph, the gradient at any point represents the speed at that point. A gradient of 0 means distance is not changing over time, so the object is stationary. A straight, sloped line (not flat) shows constant nonzero speed; a curve bending one way shows acceleration or deceleration; a flat section is not a maximum speed — it is no speed at all. Read the shape of the graph, not just how steep it looks.
- (d) 44 m — The trapezium rule between t = 2 and t = 5 uses only the speeds at t = 2, 3, 4 and 5 — 12, 15, 16 and 14 — with three strips of width 1: adding the first and last readings and twice the sum of the middle readings gives 12 + 14 + 2 × (15 + 16) = 88, and half of that is 44 m. Writing 68.5 m comes from applying the trapezium rule to the whole table, from t = 0 to t = 6, instead of restricting it to the interval t = 2 to t = 5 that the question asks for. Writing 28.5 m comes from forgetting to double the two middle readings, 15 and 16, in the trapezium rule formula. Writing 39 m comes from averaging only the first and last speeds in the interval, 12 and 14, and multiplying by the 3-second interval, ignoring the readings at t = 3 and t = 4 in between.
- (d) 2 — The gradient between two points on a line is the change in y divided by the change in x. Using (5, 2) and (0, −8): (2 − (−8)) ÷ (5 − 0) = 10 ÷ 5 = 2. Inverting the fraction, dividing the change in x by the change in y instead, gives 5 ÷ 10 = 0.5. Reversing the order of the x-values in the denominator, giving (2 − (−8)) ÷ (0 − 5) = 10 ÷ (−5), gives −2. Misreading the y-intercept as 8 instead of −8, giving (2 − 8) ÷ 5 = −6 ÷ 5, gives −1.2.
Build your own mix at the worksheet builder.