- 1.A box contains 9 red balls and 11 green balls. Two balls are taken out at random, one after the other, without being replaced. Given that both balls taken out are the same colour, work out the probability that both balls are red.
- 2.Dice A is a fair six-sided dice. Dice B is biased so that P(6) = 0.3. Dice A is rolled 150 times and Dice B is rolled 150 times. Work out how many more sixes you would expect from Dice B than from Dice A.
- 3.Two ordinary fair dice are rolled and the two scores are multiplied together. Work out the probability that the product is odd.
- 4.A game uses a fair spinner with 5 equal sections numbered 1 to 5. A player wins £12 if the spinner lands on 5, and wins nothing otherwise. It costs £2 to play. The game is played 250 times. Work out the expected profit for the players, in total, over the 250 games.
- 5.A drawing pin is dropped many times and lands either point up or point down. The relative frequency of landing point up is recorded as the experiment goes on: after 50 drops it is 0.720, after 200 drops it is 0.665, and after 1000 drops it is 0.638. The pin is to be dropped a further 2000 times. Work out the best estimate of the number of times it will land point up.
- 6.A café offers 3 types of sandwich, cheese, ham and egg, and 4 types of drink, tea, coffee, juice and water. A customer chooses one sandwich and one drink at random. Work out the probability that the customer chooses egg and water.
- 7.A market stall sells umbrellas. Over the last 250 days, it rained on 70 of them. Using this as an estimate of the probability of rain, work out how many rainy days would be expected in the next 365 days.
- 8.A phone network sends automatic text alerts to customers. On average, 1,500 alerts are sent each day, and the probability that a customer replies 'STOP' to an alert is 0.18. Work out how many replies of 'STOP' the network should expect over a 30-day month.
- 9.A factory finds that the probability a randomly chosen light bulb is defective is 0.035. In a batch of 4,000 bulbs, work out how many bulbs you would expect to work correctly.
- 10.The probability that Leo wakes up before his alarm is 0.35. The probability that his younger sister wakes up before her alarm, independently of Leo, is 0.28. Work out the probability that neither of them wakes up before their alarm.
- 11.A factory checked 400 items. A frequency tree splits them into 250 items made by machine A and 150 items made by machine B. On machine A's branch, 15 of the items were faulty. On machine B's branch, 5 of the items were faulty. One of the 400 items is picked at random. Work out the probability that it is faulty. Give your answer as a fraction in its simplest form.
- 12.A four-colour spinner (red, blue, green, yellow) is spun repeatedly, and the relative frequency of landing on green is recorded as the number of spins increases: after 20 spins it is 0.350; after 200 spins it is 0.290; after 2000 spins it is 0.251. Using the result from 2000 spins as the best estimate of the probability, work out the number of times the spinner would be expected to land on green in a further 3000 spins.
- 13.A call centre finds that 40% of its calls are about billing. 35% of the calls about billing are dealt with in under five minutes. The centre takes 500 calls on Monday. Work out how many of Monday's calls you would expect to be about billing and dealt with in under five minutes.
- 14.At a fun run, a raffle stall charges £1.50 per ticket. The probability that any one ticket wins a prize worth £8 is 0.12, and a losing ticket wins nothing. Nadia buys 25 tickets. Work out how much money Nadia should expect to lose in total.
- 15.A ferry company finds that on 20% of days the sea is rough. If the sea is rough, the probability that a crossing is delayed is 0.75. If the sea is calm, the probability that a crossing is delayed is 0.1. Given that a crossing was delayed, work out the probability that the sea was rough that day.
Answer key
- (d) 36/91 — Method: P(both red | same colour) = P(both red) ÷ P(same colour), where P(same colour) = P(both red) + P(both green). Working: P(both red) = 9/20 × 8/19 = 72/380 = 18/95. P(both green) = 11/20 × 10/19 = 110/380 = 11/38. P(same colour) = 18/95 + 11/38 = 36/190 + 55/190 = 91/190. P(both red | same colour) = (36/190) ÷ (91/190) = 36/91. Answer: 36/91. Watch out: stopping at 18/95 gives P(both red) itself, without dividing by the probability that the colours matched at all. Working out 55/91 finds the same-colour probability for green instead of red — check which colour's count you are putting on top. And 9/20 is just the chance the first ball drawn is red, which ignores the second draw and the without-replacement condition completely.
- (a) 20 — Dice A is fair, so its expected number of sixes is 150 × 1/6 = 25. Dice B has P(6) = 0.3, so its expected number of sixes is 150 × 0.3 = 45. The difference is 45 − 25 = 20. Adding the two expected values instead of subtracting them gives 25 + 45 = 70. Reporting Dice B's expected sixes on their own, without comparing to Dice A, gives 45. Using the fair probability 1/6 for Dice B as well as Dice A ignores the bias altogether, giving 150 × 1/6 = 25 for both dice and a difference of 0.
- (d) 1/4 — Method: a product is odd only when BOTH factors are odd, so list the ordered pairs where both scores are odd and divide by 36. Working: the odd scores on a dice are 1, 3 and 5, so there are 3 × 3 = 9 ordered pairs where both scores are odd, out of the 36 equally likely pairs, cancelling down to 1/4. Answer: 1/4. Watch out: writing down 3/4 finds the probability that AT LEAST ONE score is odd, 1 minus the probability both are even, which is a different, easier condition to meet than both being odd. Considering only the first dice's score and ignoring the second gives 1/2, since 3 of the first dice's 6 scores are odd — but the product also depends on what the second dice shows. And writing down 1/12 comes from counting only the pairs where the SAME odd number appears twice, (1, 1), (3, 3) and (5, 5), missing pairs like (1, 3) and (5, 1) where the two odd scores differ.
- (b) £100 — Over 250 games, the expected total winnings are 250 × (1/5) × £12 = £600, since a player wins on 1 of the 5 equally likely sections. The total cost of playing is 250 × £2 = £500. The players' expected profit is the winnings minus the cost: £600 − £500 = £100. Writing £500 is wrong because that is only the total cost of playing, without any winnings included. Writing £600 is wrong because that is only the total expected winnings, without subtracting what was paid to play. Writing £2,500 is wrong because it assumes a win on every single game (250 × £12 = £3,000) instead of using the 1-in-5 probability, then subtracts the cost: £3,000 − £500 = £2,500. The players' expected profit over the 250 games is £100.
- (a) 1276 — Method: an unbiased relative frequency tends towards the theoretical probability as the number of trials increases, so use the record resting on the most trials, then multiply by the number of new trials. Working: the three records rest on 50, 200 and 1000 drops, so the most reliable is the one after 1000 drops, namely 0.638, and the run is indeed settling as the trials increase. The expected number of point up landings in 2000 further drops is 2000 × 0.638 = 1276. Answer: about 1276 times. The distractors: 1440 uses the earliest record, which rests on only 50 drops, giving 2000 × 0.720 = 1440; 1330 uses the middle record, treating 200 drops as a safe compromise when 1000 drops is better still, giving 2000 × 0.665 = 1330; 1348 comes from averaging the three records, since 0.720 + 0.665 + 0.638 = 2.023 and 2.023 ÷ 3 = 0.674, then 2000 × 0.674 = 1348, which gives the 50 drop record the same weight as the 1000 drop record.
- (d) 1/12 — Method: list the full possibility space of sandwich-and-drink pairs, then divide the one matching pair by the size of the whole space. Working: there are 3 × 4 = 12 equally likely sandwich-and-drink pairs, and exactly one of them is egg and water. Answer: 1/12. Watch out: writing down 1/7 comes from adding the two counts, 3 + 4 = 7, instead of multiplying them to build the possibility space. Writing down 1/3 uses only the chance of choosing egg out of 3 sandwiches and ignores the drink altogether. And writing down 1/4 uses only the chance of choosing water out of 4 drinks and ignores the sandwich altogether.
- (c) 102 — Method: turn the past record into a relative frequency, then use it as an estimate of the probability of rain and multiply by the number of days being predicted for. Working: relative frequency of rain = 70 ÷ 250 = 0.28. Expected rainy days in 365 days = 365 × 0.28 = 102.2, which rounds to about 102 days. Answer: about 102 days. Watch out: writing down 48 swaps which number is the sample and which is the target, working out 70 ÷ 365 × 250 instead of 70 ÷ 250 × 365. Writing down 70 just repeats the original count of rainy days without scaling it up to the new, longer period at all. And writing down 110 comes from rounding the relative frequency to 0.3 before multiplying, 365 × 0.3 = 109.5, when 70 ÷ 250 is exactly 0.28 and needs no rounding at all.
- (b) 8,100 — First find the total number of alerts sent in the month: 1,500 × 30 = 45,000. Then apply the probability of a 'STOP' reply: 45,000 × 0.18 = 8,100. Stopping after finding only one day's expected replies, 1,500 × 0.18 = 270, forgets to scale up to the whole month. Multiplying the number of days by the probability instead of by the daily total of alerts gives 30 × 0.18 = 5.4, which rounds to 5. Shifting the decimal point in the probability, using 0.018 instead of 0.18, gives 45,000 × 0.018 = 810.
- (a) 3,860 — The probability a bulb works correctly is the complement of being defective: 1 − 0.035 = 0.965. Expected number working correctly = 0.965 × 4,000 = 3,860. Using the probability of being defective instead of its complement gives 4,000 × 0.035 = 140, the expected number of DEFECTIVE bulbs, not working ones. Shifting the decimal point in the complement, using 0.0965 instead of 0.965, gives 4,000 × 0.0965 = 386. Assuming every bulb works, ignoring the 0.035 probability altogether, gives the full batch of 4,000.
- (d) 0.468 — The probability that Leo does not wake up before his alarm is 1 − 0.35 = 0.65, and the probability that his sister does not is 1 − 0.28 = 0.72. Since the two events are independent, multiply the complements: 0.65 × 0.72 = 0.468. A candidate who answers 0.63 has added the two given probabilities, 0.35 + 0.28, instead of finding and multiplying the complements. A candidate who answers 0.098 has multiplied the two given probabilities directly, 0.35 × 0.28, without taking complements first. A candidate who answers 0.532 has correctly reached 0.468 but then subtracted it from 1 again by mistake.
- (d) 1/20 — Method: add the counts on the faulty end branches, divide by the total number of items in the experiment, then cancel. Working: the faulty items number 15 + 5 = 20, and 400 items were checked, so the probability is 20/400. Dividing the top and the bottom by 20 gives 1/20. Answer: the probability is 1/20. The distractors: 3/50 is 15/250 and comes from dividing machine A's faults by machine A's output, which is that machine's own fault rate rather than the probability for the whole batch; 1/30 is 5/150 and does the same on machine B's branch; 19/20 is 380/400 and gives the probability that the item picked is not faulty.
- (a) 753 — The estimate from 2000 spins is the most reliable, since it comes from the largest sample size, so the best estimate of the probability is 0.251. Over a further 3000 spins, the expected number landing on green is 3000 × 0.251 = 753. Writing 1050 is wrong because 3000 × 0.350 = 1050 uses the estimate from only 20 spins, the LEAST reliable of the three. Writing 870 is wrong because 3000 × 0.290 = 870 uses the estimate from 200 spins rather than the more reliable 2000-spin estimate. Writing 750 is wrong because 3000 × 0.25 = 750 ignores the recorded data completely and simply assumes each of the 4 colours is equally likely. The best estimate is 753 expected green spins.
- (a) 70 — Method: two linked steps. Find the expected number of billing calls first, then take the 35% of those, because the 35% is quoted for billing calls only. Working: 40% of 500 is 200 billing calls. 35% of 200 is 70 calls. Answer: you would expect 70 calls. The distractors: 200 stops after the first step and gives the billing calls, forgetting that only some of them are dealt with quickly; 175 is 35% of 500, applying the quick response rate to every call the centre takes rather than to the billing calls only; 375 comes from adding 40% and 35% to get 75% and taking 75% of 500, which treats two stages of one journey as separate outcomes to be added.
- (b) £13.50 — The total cost of Nadia's 25 tickets is 25 × £1.50 = £37.50. The expected number of winning tickets is 25 × 0.12 = 3, so the expected prize money is 3 × £8 = £24.00. Nadia's expected loss is the cost minus the expected prize money: £37.50 − £24.00 = £13.50. A candidate who answers £24.00 has given the expected prize money and mistaken it for the loss. A candidate who answers £37.50 has given the total cost of the tickets, forgetting to subtract the expected prize money. A candidate who answers £34.50 has subtracted the expected number of wins, 3, from the cost instead of first converting it to prize money by multiplying by £8.
- (c) 15/23 — Method: find P(rough and delayed) and the overall P(delayed) using the tree, then divide. Working: P(rough and delayed) = 0.2 × 0.75 = 0.15. P(calm and delayed) = 0.8 × 0.1 = 0.08. P(delayed) = 0.15 + 0.08 = 0.23. P(rough | delayed) = 0.15 ÷ 0.23 = 15/23. Answer: 15/23. Watch out: leaving the answer as 0.15 (3/20) gives P(rough and delayed) itself, without dividing by the overall probability that a crossing is delayed. Giving 0.75 (3/4) is the probability you were told to start with — that a crossing is delayed GIVEN the sea is rough — which is the reverse of what's being asked. And 0.2 (1/5) is just the original probability that the sea is rough, before you take the fact that the crossing was delayed into account.