Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.At a fun run, a raffle stall charges £1.50 per ticket. The probability that any one ticket wins a prize worth £8 is 0.12, and a losing ticket wins nothing. Nadia buys 25 tickets. Work out how much money Nadia should expect to lose in total.
- 2.A game has two independent stages. P(win stage 1) = 0.4, and P(win stage 2) = 0.25. Work out the probability that Ffion wins at least one of the two stages.
- 3.A weather station records whether it rains each day for 40 days: it rains on 9 of the days and does not rain on the rest. A local forecaster claims that the probability of rain on any day is 0.3. Work out the relative frequency of rain from the recorded data.
- 4.A market stall sells umbrellas. Over the last 250 days, it rained on 70 of them. Using this as an estimate of the probability of rain, work out how many rainy days would be expected in the next 365 days.
- 5.An ordinary six-sided dice, numbered 1 to 6, is rolled 30 times and lands on a 6 seven times. Ravi says the theoretical probability of rolling a 6 and the relative frequency of rolling a 6 in this trial are the same number. Is Ravi right?
- 6.A council surveyed 140 households about recycling. 85 of the households are in Zone A. 52 of the Zone A households recycle glass. 21 of the Zone B households do not recycle glass. Work out the probability that a household, chosen at random from the 140, recycles glass. Give your answer as a fraction in its simplest form.
- 7.A factory tests components from a large batch in which 6% are defective. Two components are selected at random, and the batch is large enough that the selections can be treated as independent. Given that at least one of the two components is defective, work out the probability that both are defective.
- 8.At a sports centre, 45% of the members are aged under 18. 60% of the members aged under 18 swim each week. 20% of the members aged 18 or over swim each week. Work out the percentage of all the members who swim each week.
- 9.At a fun run, each runner finishes, retires or is disqualified, and cannot do more than one of these. The probability that a runner finishes is 68.5% and the probability that a runner retires is 24.75%. Work out the probability, as a percentage, that a runner is disqualified.
- 10.A Venn diagram shows two sets, P and Q, inside a universal set. n(P) = 34, n(Q) = 27, n(P ∩ Q) = 11, and n(ξ) = 90, where ξ is the universal set. Work out n((P ∪ Q)′), the number of elements in neither P nor Q.
- 11.An archer hits the bullseye with probability 0.24 on any one shot. She wants to know how many shots she must take to expect to hit the bullseye 12 times. Work out how many shots this is.
- 12.In a class experiment a fair six-sided dice is rolled 60 times and lands on a six 14 times. The whole school then rolls the same fair dice 3000 times. Work out the best estimate of the number of sixes the school should expect.
- 13.A ferry company finds that on 20% of days the sea is rough. If the sea is rough, the probability that a crossing is delayed is 0.75. If the sea is calm, the probability that a crossing is delayed is 0.1. Given that a crossing was delayed, work out the probability that the sea was rough that day.
- 14.Dice A is a fair six-sided dice. Dice B is biased so that P(6) = 0.3. Dice A is rolled 150 times and Dice B is rolled 150 times. Work out how many more sixes you would expect from Dice B than from Dice A.
- 15.A train company runs 25 trains a day, every day. The probability that any one train is late is 0.08. Work out how many late trains the company should expect over a period of 4 weeks.
Answer key
- (b) £13.50 — The total cost of Nadia's 25 tickets is 25 × £1.50 = £37.50. The expected number of winning tickets is 25 × 0.12 = 3, so the expected prize money is 3 × £8 = £24.00. Nadia's expected loss is the cost minus the expected prize money: £37.50 − £24.00 = £13.50. A candidate who answers £24.00 has given the expected prize money and mistaken it for the loss. A candidate who answers £37.50 has given the total cost of the tickets, forgetting to subtract the expected prize money. A candidate who answers £34.50 has subtracted the expected number of wins, 3, from the cost instead of first converting it to prize money by multiplying by £8.
- (b) 0.55 — Method: it is easier to find the probability that Ffion wins NEITHER stage, then subtract that from 1. Working: P(lose stage 1) = 1 − 0.4 = 0.6, and P(lose stage 2) = 1 − 0.25 = 0.75. P(neither) = 0.6 × 0.75 = 0.45. P(at least one) = 1 − 0.45 = 0.55. Answer: 0.55. Watch out: adding the two win probabilities, 0.4 + 0.25 = 0.65, treats winning both as impossible and overcounts — that is not how independent probabilities combine. Multiplying the two win probabilities, 0.4 × 0.25 = 0.1, gives the probability of winning BOTH stages, not at least one. And stopping at 0.45, the probability of winning neither stage, forgets the final step of subtracting from 1.
- (b) 0.225 — The relative frequency of rain is the number of rainy days out of all days recorded: 9 ÷ 40 = 0.225, which is noticeably less than the forecaster's claimed 0.3. Using the number of dry days, 40 − 9 = 31, as the denominator instead of the total of 40 gives 9 ÷ 31 = 0.29 (2 d.p.). Simply reporting the forecaster's claimed value, 0.3, without calculating anything from the data at all, ignores the recorded results completely. Misplacing the decimal point, treating 9 out of 40 as 9%, gives 0.09 instead of 0.225.
- (c) 102 — Method: turn the past record into a relative frequency, then use it as an estimate of the probability of rain and multiply by the number of days being predicted for. Working: relative frequency of rain = 70 ÷ 250 = 0.28. Expected rainy days in 365 days = 365 × 0.28 = 102.2, which rounds to about 102 days. Answer: about 102 days. Watch out: writing down 48 swaps which number is the sample and which is the target, working out 70 ÷ 365 × 250 instead of 70 ÷ 250 × 365. Writing down 70 just repeats the original count of rainy days without scaling it up to the new, longer period at all. And writing down 110 comes from rounding the relative frequency to 0.3 before multiplying, 365 × 0.3 = 109.5, when 70 ÷ 250 is exactly 0.28 and needs no rounding at all.
- (c) No — 7/30 is the relative frequency; theory stays 1/6. — The theoretical probability of rolling a 6 on an ordinary dice is fixed at 1/6, worked out from the number of equally likely outcomes, and does not change however the dice is actually rolled. The relative frequency from this trial is 7/30, found from what happened in these particular 30 rolls. Since 7/30 and 1/6 are different numbers, the correct statement is 'No — 7/30 is the relative frequency; theory stays 1/6.' Assuming the two values must always match because they describe the same event gives 'Yes — relative frequency always equals theory.' Believing that an observed result redefines the theoretical probability gives 'Yes — the theoretical probability has now become 7/30.' Refusing to work out either value at all gives 'Neither can be found — 30 rolls is too few to tell', which ignores that both numbers CAN be calculated from the information given.
- (a) 43/70 — There are 140 − 85 = 55 Zone B households, and 55 − 21 = 34 of them recycle glass. In total, 52 + 34 = 86 households recycle glass, out of 140: 86/140 = 43/70. Writing 13/35 is wrong because 52/140 simplifies to 13/35, and 52 only counts Zone A, leaving out the 34 Zone B recyclers. Writing 17/70 is wrong because 34/140 simplifies to 17/70, and 34 only counts Zone B, leaving out the 52 Zone A recyclers. Writing 73/140 is wrong because it adds the 52 Zone A recyclers to the 21 Zone B households that do NOT recycle, mixing up two different groups instead of adding the two recycling groups. The probability is 43/70.
- (b) 0.0309 — Method: P(both defective | at least one defective) = P(both defective) ÷ P(at least one defective). Find each using independence: P(both) = 0.06², P(at least one) = 1 − P(neither) = 1 − 0.94². Working: P(both) = 0.06² = 0.0036. P(neither) = 0.94² = 0.8836, so P(at least one) = 1 − 0.8836 = 0.1164. P(both | at least one) = 0.0036 ÷ 0.1164 = 0.0309 (3 s.f.). Answer: 0.0309. Watch out: leaving the answer as 0.0036 gives P(both defective) itself, not the probability once you already know at least one is defective — you still need to divide by P(at least one defective). Giving 0.0600 answers with the single-component defect rate, ignoring the condition altogether. And 0.5000 assumes that 'at least one' makes the outcomes 'exactly one defective' and 'both defective' equally likely, which is not how these probabilities combine.
- (b) 38% — Method: the two swimming percentages are quoted inside different age groups, so weight each one by the size of its group and add the two results. Working: the under 18s are 45% of the members and 60% of them swim, giving 0.45 × 60 = 27% of all the members. The members aged 18 or over are 55% of the members and 20% of them swim, giving 0.55 × 20 = 11% of all the members. Adding these gives 38%. Answer: 38% of the members swim each week. The distractors: 80% comes from adding 60% and 20% straight off, treating two rates quoted inside different groups as though they could be added; 40% is the mean of 60% and 20%, which would be right only if the two age groups were the same size, and they are not; 42% comes from pairing each swimming rate with the wrong age group, working out 0.45 × 20 added to 0.55 × 60.
- (a) 6.75% — Finishing, retiring and being disqualified are exhaustive, so the three percentages sum to 100%: 100% − 68.5% − 24.75% = 6.75%. Adding the two given percentages instead of subtracting them from 100% gives 68.5% + 24.75% = 93.25%, the combined probability of finishing or retiring, not of being disqualified. Subtracting only the retiring percentage from 100% and forgetting the finishing percentage gives 100% − 24.75% = 75.25%. Subtracting only the finishing percentage and forgetting the retiring percentage gives 100% − 68.5% = 31.50%.
- (b) 40 — n(P ∪ Q) = n(P) + n(Q) − n(P ∩ Q) = 34 + 27 − 11 = 50. The complement is everyone outside both sets: n((P ∪ Q)′) = 90 − 50 = 40. Adding P and Q without subtracting the overlap gives 34 + 27 = 61, so 90 − 61 = 29 double-subtracts the 11 who are in both. Reporting n(P ∪ Q) itself, 50, forgets to take the complement at all. Subtracting only n(P) from the universal set, 90 − 34 = 56, ignores set Q altogether.
- (a) 50 — To find the number of shots needed for an expected 12 hits, divide the number of hits wanted by the probability of a hit: 12 ÷ 0.24 = 50. Multiplying the number of hits by the probability instead of dividing gives 12 × 0.24 = 2.88, which rounds to 3 shots. Rounding 0.24 to 0.25 before dividing gives 12 ÷ 0.25 = 48. Using the probability of missing, 1 − 0.24 = 0.76, instead of the probability of hitting, gives 12 ÷ 0.76 = 15.79, which rounds to 16.
- (b) 500 — Method: when a dice is known to be fair, the theoretical probability is the best thing to work from, and the more trials there are the closer the results tend to it. Working: for a fair dice the probability of a six is 1/6, so the expected number of sixes in 3000 rolls is 3000 × 1 ÷ 6 = 500. The class experiment gave a relative frequency of 14/60, but 60 trials is far too few to overturn a known theoretical value, and the school's 3000 rolls will tend towards 1/6 in any case. Answer: about 500 sixes. The distractors: 700 comes from using the class relative frequency instead of the theory, 3000 × 14 ÷ 60 = 700; 600 comes from splitting the difference between the two, since 1/6 is about 0.167 and 14/60 is about 0.233, whose mean is 0.2, and 3000 × 0.2 = 600; 2500 uses 5/6 instead of 1/6 and counts the rolls expected not to be a six.
- (c) 15/23 — Method: find P(rough and delayed) and the overall P(delayed) using the tree, then divide. Working: P(rough and delayed) = 0.2 × 0.75 = 0.15. P(calm and delayed) = 0.8 × 0.1 = 0.08. P(delayed) = 0.15 + 0.08 = 0.23. P(rough | delayed) = 0.15 ÷ 0.23 = 15/23. Answer: 15/23. Watch out: leaving the answer as 0.15 (3/20) gives P(rough and delayed) itself, without dividing by the overall probability that a crossing is delayed. Giving 0.75 (3/4) is the probability you were told to start with — that a crossing is delayed GIVEN the sea is rough — which is the reverse of what's being asked. And 0.2 (1/5) is just the original probability that the sea is rough, before you take the fact that the crossing was delayed into account.
- (a) 20 — Dice A is fair, so its expected number of sixes is 150 × 1/6 = 25. Dice B has P(6) = 0.3, so its expected number of sixes is 150 × 0.3 = 45. The difference is 45 − 25 = 20. Adding the two expected values instead of subtracting them gives 25 + 45 = 70. Reporting Dice B's expected sixes on their own, without comparing to Dice A, gives 45. Using the fair probability 1/6 for Dice B as well as Dice A ignores the bias altogether, giving 150 × 1/6 = 25 for both dice and a difference of 0.
- (d) 56 — Method: count the trials over the whole period first, then multiply the number of trials by the probability. Working: 4 weeks is 4 × 7 = 28 days, and at 25 trains a day that is 25 × 28 = 700 trains. The expected number of late trains is 700 × 0.08 = 56. Answer: about 56 late trains over the 4 weeks. The distractors: 2 is the expected number for a single day, 25 × 0.08 = 2, with the 28 days never brought in; 14 uses one week instead of four, 25 × 7 × 0.08 = 14; 644 is 700 − 56 and counts the trains expected to be on time.
Build your own mix at the worksheet builder.