Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.Kwame flips a fair coin three times and writes down what it lands on each time. Work out the probability that it lands on heads all three times.
- 2.A survey of 160 employees at a company recorded whether they cycle to work, using a frequency tree. The first branch splits them into 90 who work full-time and 70 who work part-time. Of the full-time employees, 27 cycle to work. Of the part-time employees, 14 cycle to work. Work out the probability that an employee, chosen at random from the 160, cycles to work. Give your answer as a fraction in its simplest form.
- 3.A fair spinner has 8 equal sections: 5 are red and 3 are blue. Freya spins it twice, and each spin is independent of the other. Work out the probability that she gets one red and one blue in the two spins, in either order.
- 4.The probability that a pupil chosen at random has a nut allergy is 1/10. There are 30 pupils in a class. Work out how many of the 30 pupils would be expected to have a nut allergy.
- 5.Spinner E has 4 equal sections, numbered 1 to 4. Spinner F has 6 equal sections, numbered 1 to 6. Both spinners are spun once. Work out the probability of getting at least one 3.
- 6.A drawing pin is dropped many times and lands either point up or point down. The relative frequency of landing point up is recorded as the experiment goes on: after 50 drops it is 0.720, after 200 drops it is 0.665, and after 1000 drops it is 0.638. The pin is to be dropped a further 2000 times. Work out the best estimate of the number of times it will land point up.
- 7.A factory makes bolts on two machines. Machine A makes 60% of the bolts and machine B makes the other 40%. 5% of the bolts made by machine A are faulty and 10% of the bolts made by machine B are faulty. A bolt is picked at random from one day's production. Work out the probability that it was made by machine B and is faulty. Give your answer as a decimal.
- 8.Two cards are dealt one after the other from an ordinary pack of 52 playing cards. The first card is not put back before the second is dealt. The pack contains 4 aces. Work out the probability that neither card is an ace. Give your answer as a product of two fractions.
- 9.A market stall sells umbrellas. Over the last 250 days, it rained on 70 of them. Using this as an estimate of the probability of rain, work out how many rainy days would be expected in the next 365 days.
- 10.A library recorded loans for 250 books over a week, using a frequency tree. The first branch splits the books into 160 fiction and 90 non-fiction. Of the fiction books, 112 were returned on time and the rest were returned late. All the non-fiction books were returned on time. Work out the probability that a book, chosen at random from the 250, was returned late. Give your answer as a fraction in its simplest form.
- 11.A bag contains 5 red counters and 5 green counters. Three counters are taken out one at a time and are not put back. Work out the probability that all three counters are red.
- 12.At a garden centre, 3/5 of the plants for sale are perennials. 1/4 of the perennials are in flower. Work out the probability that a plant picked at random from the garden centre is a perennial and is in flower.
- 13.In Manchester the probability of rain on any day in November is taken to be 0.3, and whether it rains on one day is independent of whether it rains on the next. Work out the probability that it rains on both the 10th and the 11th of November.
- 14.An archer hits the bullseye with probability 0.24 on any one shot. She wants to know how many shots she must take to expect to hit the bullseye 12 times. Work out how many shots this is.
- 15.A train company runs 25 trains a day, every day. The probability that any one train is late is 0.08. Work out how many late trains the company should expect over a period of 4 weeks.
Answer key
- (d) 1/8 — Method: a run of flips of a fair coin gives equally likely sequences of heads and tails, so count the sequences that match and divide by how many sequences there are. Working: each flip lands two ways and no flip affects another, so three flips give 2 × 2 × 2 = 8 equally likely sequences: HHH, HHT, HTH, HTT, THH, THT, TTH and TTT. Only HHH has a head at every flip, so 1 sequence of the 8 matches. Answer: the probability is 1/8. The distractors: 1/4 comes from treating 'three heads', 'two heads', 'one head' and 'no heads' as four equally likely results, which they are not, since one sequence gives three heads and three sequences give two; 1/6 comes from taking the number of sequences to be 2 + 2 + 2 = 6, adding the two ways each flip can land instead of multiplying them; 1/2 comes from reading the first flip only and giving the probability of a head on one flip, without combining it with the other two.
- (b) 41/160 — In total, 27 + 14 = 41 of the 160 employees cycle to work, so the probability is 41/160 (41 and 160 share no common factor, so this is already in its simplest form). Writing 27/160 is wrong because it only counts the full-time cyclists and leaves out the 14 part-time cyclists. Writing 41/90 is wrong because it uses the full-time total (90) as the denominator instead of the whole survey (160). Writing 1/5 is wrong because it only uses the part-time branch, simplifying 14/70 to 1/5 and ignoring the full-time cyclists completely. The probability is 41/160.
- (b) 15/32 — Method: there are two ways to get one of each colour, red then blue and blue then red. Work out the probability of each path by multiplying, then add the two paths. Working: red then blue is 5/8 × 3/8 = 15/64, and blue then red is 3/8 × 5/8 = 15/64. Adding the two paths gives 30/64. Answer: the probability is 15/32. The distractors: 15/64 comes from working out red then blue only and forgetting that blue then red also gives one of each; 15/28 comes from doubling correctly but reducing the total to 7 for the second spin, which is what happens to a bag when an item is kept out, not to a spinner; 39/64 comes from working from the opposite event and subtracting only the two-red case, 1 − 25/64, leaving the two-blue case inside the answer.
- (b) 3 pupils — Method: an expected frequency is the probability multiplied by the number of trials, so multiply the probability by the number of pupils. Working: 30 × 1/10 means finding one tenth of 30, and 30 ÷ 10 = 3. Answer: 3 pupils would be expected to have a nut allergy. The distractors: 27 pupils comes from working out how many are expected NOT to have the allergy, 30 − 3, instead of how many are; 10 pupils comes from reading the 10 in the fraction 1/10 as the number of pupils; 1 pupil comes from reading the numerator of the fraction as the expected number.
- (a) 3/8 — There are 4 × 6 = 24 equally likely outcomes. The outcomes with no 3 at all have Spinner E showing 1, 2 or 4 and Spinner F showing 1, 2, 4, 5 or 6, giving 3 × 5 = 15 outcomes. So the outcomes with at least one 3 are 24 − 15 = 9, and the probability is 9/24 = 3/8. Choosing 5/12 comes from adding the two individual probabilities of a 3, 1/4 + 1/6, which counts the outcome where both spinners show 3 twice over. Choosing 1/4 comes from only counting the case where Spinner E shows 3, and forgetting the outcomes where Spinner F shows 3 instead. Choosing 5/8 comes from working out the probability of getting no 3 at all, 15/24 = 5/8, and giving that as the final answer instead of subtracting it from 1.
- (a) 1276 — Method: an unbiased relative frequency tends towards the theoretical probability as the number of trials increases, so use the record resting on the most trials, then multiply by the number of new trials. Working: the three records rest on 50, 200 and 1000 drops, so the most reliable is the one after 1000 drops, namely 0.638, and the run is indeed settling as the trials increase. The expected number of point up landings in 2000 further drops is 2000 × 0.638 = 1276. Answer: about 1276 times. The distractors: 1440 uses the earliest record, which rests on only 50 drops, giving 2000 × 0.720 = 1440; 1330 uses the middle record, treating 200 drops as a safe compromise when 1000 drops is better still, giving 2000 × 0.665 = 1330; 1348 comes from averaging the three records, since 0.720 + 0.665 + 0.638 = 2.023 and 2.023 ÷ 3 = 0.674, then 2000 × 0.674 = 1348, which gives the 50 drop record the same weight as the 1000 drop record.
- (c) 0.04 — Method: 'made by machine B and faulty' is the second branch of a tree followed after the first, so multiply the probability of machine B by the probability of a fault given machine B. Working: machine B makes 0.4 of the bolts, and 0.1 of those bolts are faulty, so the probability is 0.4 × 0.1 = 0.04. Answer: the probability is 0.04. The distractors: 0.5 comes from adding 0.4 and 0.1 instead of multiplying, treating two stages of one journey as two separate outcomes; 0.1 gives the fault rate for machine B on its own, as though every bolt in the factory came from machine B, so the 40% share is never used; 0.07 is 0.6 × 0.05 added to 0.4 × 0.1, the probability that a bolt is faulty whichever machine made it, which answers a question about all the production rather than about machine B.
- (b) (48/52) × (47/51) — Method: for two deals one after the other with nothing put back, multiply the probability of the first by the probability of the second worked out from the cards that are left. Working: 52 − 4 = 48 cards are not aces, so the first card is not an ace with probability 48/52. One card has now gone and it was not an ace, so 51 cards remain and 47 of them are not aces, giving 47/51. Answer: the probability is (48/52) × (47/51). The distractors: (48/52) × (48/52) comes from leaving the pack at 52 cards for the second deal, which is only true if the first card is replaced; (4/52) × (3/51) comes from working out the probability that both cards ARE aces instead of neither; (4/52) × (4/51) comes from the same misreading with the ace count left at 4 while the total is reduced, adjusting only half of the second fraction.
- (c) 102 — Method: turn the past record into a relative frequency, then use it as an estimate of the probability of rain and multiply by the number of days being predicted for. Working: relative frequency of rain = 70 ÷ 250 = 0.28. Expected rainy days in 365 days = 365 × 0.28 = 102.2, which rounds to about 102 days. Answer: about 102 days. Watch out: writing down 48 swaps which number is the sample and which is the target, working out 70 ÷ 365 × 250 instead of 70 ÷ 250 × 365. Writing down 70 just repeats the original count of rainy days without scaling it up to the new, longer period at all. And writing down 110 comes from rounding the relative frequency to 0.3 before multiplying, 365 × 0.3 = 109.5, when 70 ÷ 250 is exactly 0.28 and needs no rounding at all.
- (b) 24/125 — On the fiction branch, 160 − 112 = 48 books were returned late. None of the non-fiction books were late, so the total number of late books is 48, out of 250 books altogether: 48/250 = 24/125. Writing 3/10 is wrong because it divides the 48 late fiction books by the fiction total (160) instead of the whole library total (250). Writing 56/125 is wrong because 112/250 simplifies to 56/125, and 112 is the number of fiction books returned ON TIME, not late. Writing 9/25 is wrong because 90/250 simplifies to 9/25, and 90 is simply the number of non-fiction books, which has nothing to do with late returns. The probability is 24/125.
- (a) 1/12 — Method: for draws with nothing put back, multiply the probabilities of the three draws, reducing both the number of red counters and the total each time a red counter is removed. Working: the first counter is red with probability 5/10. One red counter has gone, so the second is red with probability 4/9, and then the third is red with probability 3/8. Multiplying gives 60/720. Answer: the probability is 1/12. The distractors: 1/8 comes from using 5/10 three times, which is what happens only if each counter is put back; 2/9 comes from stopping after two draws and giving 5/10 × 4/9; 3/50 comes from taking one off the red count each time but leaving the total at 10, giving 5/10 × 4/10 × 3/10.
- (c) 3/20 — Method: the second fraction is quoted for the perennials only, so it is a conditional probability and the two fractions multiply. Working: the probability that a plant is a perennial is 3/5, and given that it is a perennial the probability that it is in flower is 1/4. Multiplying gives 3 × 1 over 5 × 4, which is 3/20. Answer: the probability is 3/20. The distractors: 17/20 comes from adding the fractions, 12/20 plus 5/20, instead of multiplying, which would be right only for two outcomes that cannot both happen; 4/9 comes from adding the numerators and the denominators separately, the classic 3 + 1 over 5 + 4; 1/4 quotes the flowering fraction on its own, as though every plant in the garden centre were a perennial, so the 3/5 is never used.
- (a) 0.09 — Method: two independent events that must both happen are combined by multiplying their probabilities. Working: the same probability 0.3 applies to each day, so the calculation is 0.3 × 0.3. Written as fractions this is 3/10 × 3/10 = 9/100. Answer: the probability is 0.09. The distractors: 0.6 comes from adding 0.3 and 0.3 instead of multiplying them; 0.3 comes from quoting the single-day probability, as though the second day added no further condition; 0.9 comes from multiplying 3 by 3 correctly but keeping only one decimal place in the product instead of two.
- (a) 50 — To find the number of shots needed for an expected 12 hits, divide the number of hits wanted by the probability of a hit: 12 ÷ 0.24 = 50. Multiplying the number of hits by the probability instead of dividing gives 12 × 0.24 = 2.88, which rounds to 3 shots. Rounding 0.24 to 0.25 before dividing gives 12 ÷ 0.25 = 48. Using the probability of missing, 1 − 0.24 = 0.76, instead of the probability of hitting, gives 12 ÷ 0.76 = 15.79, which rounds to 16.
- (d) 56 — Method: count the trials over the whole period first, then multiply the number of trials by the probability. Working: 4 weeks is 4 × 7 = 28 days, and at 25 trains a day that is 25 × 28 = 700 trains. The expected number of late trains is 700 × 0.08 = 56. Answer: about 56 late trains over the 4 weeks. The distractors: 2 is the expected number for a single day, 25 × 0.08 = 2, with the 28 days never brought in; 14 uses one week instead of four, 25 × 7 × 0.08 = 14; 644 is 700 − 56 and counts the trains expected to be on time.
Build your own mix at the worksheet builder.