Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.The probability that a seed fails to germinate is 1/5. Three seeds are planted independently. Work out the probability that at least one of the three seeds germinates.
- 2.A ferry company finds that on 20% of days the sea is rough. If the sea is rough, the probability that a crossing is delayed is 0.75. If the sea is calm, the probability that a crossing is delayed is 0.1. Given that a crossing was delayed, work out the probability that the sea was rough that day.
- 3.The probability that it rains on a given morning is 0.3. If it rains, the probability that Priya's bus is late is 0.8. If it does not rain, the probability that her bus is late is 0.1. Work out the probability that her bus is late.
- 4.A company has 400 employees. 150 of them work part time and 160 of them cycle to work. Working part time and cycling to work are independent. Work out how many of the employees you would expect both to work part time and to cycle to work.
- 5.Two fair six-sided dice are rolled and the two scores are added together. Given that at least one of the dice shows a 5, work out the probability that the total is 8.
- 6.Two fair spinners are each numbered 1, 2 and 3. Priya spins both spinners together and records the two numbers as a pair, listing every possible outcome systematically in a grid. Work out the probability that the two numbers are the same.
- 7.In Manchester the probability of rain on any day in November is taken to be 0.3, and whether it rains on one day is independent of whether it rains on the next. Work out the probability that it rains on both the 10th and the 11th of November.
- 8.An ordinary fair dice is rolled twice. Work out the probability of getting at least one 5.
- 9.In a survey of 200 households, 120 have a garden and 80 own a dog. 54 of the households have a garden and own a dog. Work out the probability that a household owns a dog given that it has a garden, and compare it with the probability that a household picked from the whole survey owns a dog.
- 10.A survey of 160 employees at a company recorded whether they cycle to work, using a frequency tree. The first branch splits them into 90 who work full-time and 70 who work part-time. Of the full-time employees, 27 cycle to work. Of the part-time employees, 14 cycle to work. Work out the probability that an employee, chosen at random from the 160, cycles to work. Give your answer as a fraction in its simplest form.
- 11.A train company runs 25 trains a day, every day. The probability that any one train is late is 0.08. Work out how many late trains the company should expect over a period of 4 weeks.
- 12.A bag contains 4 red counters and 6 blue counters. A counter is taken at random, its colour noted, and it is put back in the bag before a second counter is taken at random. Work out the probability that the two counters are different colours. Give your answer as a fraction in its simplest form.
- 13.180 gardeners at an allotment were asked whether they grow vegetables organically. 100 of the gardeners are on the north plots. 64 of the north-plot gardeners grow organically. 30 of the south-plot gardeners do not grow organically. Work out how many south-plot gardeners grow organically.
- 14.A bag contains 3 yellow counters and 2 green counters. Sophie takes one counter at random and does not put it back. She then takes a second counter at random. Work out the probability that the first counter is yellow and the second is green.
- 15.A survey of 60 readers records: 21 read only fiction, 17 read only non-fiction, 14 read both, and the rest read neither. Work out the probability that a randomly chosen reader reads exactly one of the two types, giving your answer as a fraction in its simplest form.
Answer key
- (d) 124/125 — The probability that a seed germinates is 1 − 1/5 = 4/5, so the probability that all three seeds fail to germinate is 1/5 × 1/5 × 1/5 = 1/125. The probability that at least one germinates is 1 − 1/125 = 124/125. Choosing 4/5 comes from giving the probability that a single seed germinates, forgetting to combine all three seeds. Choosing 64/125 comes from working out the probability that ALL three seeds germinate, 4/5 × 4/5 × 4/5 = 64/125, instead of at least one. Choosing 12/125 comes from working out the probability that EXACTLY one seed germinates, 3 × 4/5 × 1/5 × 1/5 = 12/125, instead of at least one.
- (c) 15/23 — Method: find P(rough and delayed) and the overall P(delayed) using the tree, then divide. Working: P(rough and delayed) = 0.2 × 0.75 = 0.15. P(calm and delayed) = 0.8 × 0.1 = 0.08. P(delayed) = 0.15 + 0.08 = 0.23. P(rough | delayed) = 0.15 ÷ 0.23 = 15/23. Answer: 15/23. Watch out: leaving the answer as 0.15 (3/20) gives P(rough and delayed) itself, without dividing by the overall probability that a crossing is delayed. Giving 0.75 (3/4) is the probability you were told to start with — that a crossing is delayed GIVEN the sea is rough — which is the reverse of what's being asked. And 0.2 (1/5) is just the original probability that the sea is rough, before you take the fact that the crossing was delayed into account.
- (c) 0.31 — Method: a late bus can be reached along two paths of the tree. Multiply along each path, then add the paths that end in a late bus. Working: the rain path gives 0.3 × 0.8 = 0.24. No rain has probability 1 − 0.3 = 0.7, so the second path gives 0.7 × 0.1 = 0.07. Adding the two paths gives 0.24 + 0.07. Answer: the probability is 0.31. The distractors: 0.9 comes from adding the two branch probabilities 0.8 and 0.1 without first weighting them by how often it rains; 0.24 comes from following the rain path only and ignoring that the bus can also be late when it is dry; 0.27 comes from using 0.3 at the start of both paths, so that the no-rain path is given 0.3 × 0.1 instead of 0.7 × 0.1.
- (b) 60 — Method: independence means the proportion of part timers among the cyclists is the same as the proportion among all the employees, so find that proportion and apply it to the cyclists. Working: 150 of the 400 employees work part time, which is a proportion of 0.375. Applying it to the 160 cyclists gives 0.375 × 160 = 60 employees. Answer: you would expect 60 employees. The distractors: 310 adds 150 and 160, treating the group who do both as everyone who does one thing or the other; 10 subtracts 150 from 160, reading 'both' as the difference between the two counts; 75 halves the 150 part timers, assuming that independence means they split evenly between cyclists and non cyclists, which would need exactly half the workforce to cycle.
- (b) 2/11 — Method: restrict the 36 equally likely outcomes to those where at least one die shows a 5, then find what fraction of THOSE give a total of 8. Working: outcomes with at least one 5: (5, 1), (5, 2), (5, 3), (5, 4), (5, 5), (5, 6), (1, 5), (2, 5), (3, 5), (4, 5), (6, 5) — 11 outcomes. Among these, the total is 8 for (5, 3) and (3, 5) — 2 outcomes. P(total 8 | at least one 5) = 2/11. Answer: 2/11. Watch out: 5/36 is P(total 8) over the full 36 outcomes — it ignores that you already know one die shows a 5. Treating the condition as 'the first die shows a 5' instead of 'at least one die shows a 5' restricts you to only 6 outcomes and misses the (3, 5) case, giving 1/6. And counting only (5, 3) but not its reverse (3, 5) inside the correct 11-outcome list gives 1/11 instead of 2/11.
- (d) 1/3 — List the outcomes for the two spinners systematically in a 3 × 3 grid: 1-1, 1-2, 1-3, 2-1, 2-2, 2-3, 3-1, 3-2, 3-3, where the first number is the score on spinner A and the second is the score on spinner B — 9 equally likely outcomes in total. The pairs where the two numbers are the same are 1-1, 2-2 and 3-3, so there are 3 favourable outcomes. P(same number) = 3/9 = 1/3. 2/3 comes from working out the probability that the two numbers are different and then forgetting to take the complement the right way round, so the probability of "different" is given instead of the probability of "same". 1/2 comes from listing only the 6 unordered pairs 1-1, 2-2, 3-3, 1-2, 1-3, 2-3 instead of all 9 ordered outcomes in the grid, then taking 3 out of that 6. 1/9 comes from spotting only one of the three matching pairs, such as 1-1, and missing 2-2 and 3-3.
- (a) 0.09 — Method: two independent events that must both happen are combined by multiplying their probabilities. Working: the same probability 0.3 applies to each day, so the calculation is 0.3 × 0.3. Written as fractions this is 3/10 × 3/10 = 9/100. Answer: the probability is 0.09. The distractors: 0.6 comes from adding 0.3 and 0.3 instead of multiplying them; 0.3 comes from quoting the single-day probability, as though the second day added no further condition; 0.9 comes from multiplying 3 by 3 correctly but keeping only one decimal place in the product instead of two.
- (b) 11/36 — Method: 'at least one' is the opposite of 'none at all', so work out the probability of no 5 on either roll and take it away from 1. Working: a roll that is not a 5 has probability 5/6, and the rolls are independent, so no 5 at all has probability 5/6 × 5/6 = 25/36. Taking this from 36/36 leaves 11/36. Answer: the probability is 11/36. The distractors: 25/36 is the probability of no 5 at all, written down without the final subtraction; 12/36 comes from counting the 6 pairs with a 5 on the first roll and the 6 pairs with a 5 on the second and adding them, which counts the pair (5, 5) twice; 30/36 comes from working out 1 − 1/6 as though only one roll were made.
- (a) 0.45, different from 0.4 for all the households — Method: work out the probability inside the restricted group of garden owners, then work out the probability across the whole survey, and compare the two. Working: 54 of the 120 households with a garden own a dog, so the conditional probability is 54 divided by 120, which is 0.45. Across the whole survey 80 of the 200 households own a dog, which is 0.4. Since 0.45 is not 0.4, having a garden changes the chance of owning a dog and the two events are not independent. Answer: 0.45, different from 0.4 for all the households. The distractors: 0.27 is 54/200, dividing the households with both by the whole survey instead of by the 120 with a garden; 0.675 is 54/80, the probability that a household has a garden given that it owns a dog, which is the condition and the event the wrong way round; 0.4 is 80/200, the probability of owning a dog with the garden information never used, which is why that route also reports no difference.
- (b) 41/160 — In total, 27 + 14 = 41 of the 160 employees cycle to work, so the probability is 41/160 (41 and 160 share no common factor, so this is already in its simplest form). Writing 27/160 is wrong because it only counts the full-time cyclists and leaves out the 14 part-time cyclists. Writing 41/90 is wrong because it uses the full-time total (90) as the denominator instead of the whole survey (160). Writing 1/5 is wrong because it only uses the part-time branch, simplifying 14/70 to 1/5 and ignoring the full-time cyclists completely. The probability is 41/160.
- (d) 56 — Method: count the trials over the whole period first, then multiply the number of trials by the probability. Working: 4 weeks is 4 × 7 = 28 days, and at 25 trains a day that is 25 × 28 = 700 trains. The expected number of late trains is 700 × 0.08 = 56. Answer: about 56 late trains over the 4 weeks. The distractors: 2 is the expected number for a single day, 25 × 0.08 = 2, with the 28 days never brought in; 14 uses one week instead of four, 25 × 7 × 0.08 = 14; 644 is 700 − 56 and counts the trains expected to be on time.
- (a) 12/25 — P(red then blue) = 4/10 × 6/10 = 24/100. P(blue then red) is the same, 6/10 × 4/10 = 24/100. Since either order counts as different colours, add them: 24/100 + 24/100 = 48/100 = 12/25. Working out only one order, red-then-blue, and forgetting blue-then-red, gives 24/100 = 6/25. Working out the probability that the two counters are the SAME colour instead — 4/10 × 4/10 + 6/10 × 6/10 = 16/100 + 36/100 = 52/100 = 13/25 — answers a different question. Using 6/9 for the second draw, as if the first counter were not replaced, gives 2 × (4/10 × 6/9) = 48/90 = 8/15.
- (b) 50 — There are 180 − 100 = 80 south-plot gardeners. 30 of them do not grow organically, so the rest do: 80 − 30 = 50. Writing 64 is wrong because that is the number of NORTH-plot gardeners who grow organically, not south. Writing 30 again is wrong because that is the number of south-plot gardeners who do NOT grow organically — the question asks for those who do. Writing 80 is wrong because that is the whole south-plot total, without subtracting the 30 who do not grow organically. The answer is 50.
- (b) 3/10 — Method: on a tree diagram, follow the path that matches the description and multiply the probabilities written along it; with nothing put back, the second set of branches is worked out from the counters that are left. Working: 3 of the 5 counters are yellow, so the first branch of the path is 3/5. A yellow counter has been kept out, so 4 counters remain and both green counters are still there, making the second branch 2/4. Multiplying along the path gives 6/20. Answer: the probability is 3/10. The distractors: 6/25 comes from using 2/5 on the second branch, which is the tree for a counter that is put back; 3/20 comes from taking one off the green count as well as off the total, using 1/4 on the second branch; 3/5 comes from reading the first branch only and never multiplying along the path.
- (d) 19/30 — Exactly one means only fiction or only non-fiction, not both: 21 + 17 = 38 out of the 60 readers, which simplifies to 19/30. Including the 14 who read both as well gives 21 + 17 + 14 = 52, so 52/60 = 13/15 — that is at least one, not exactly one. Using only the both-count, 14, as the numerator gives 14/60 = 7/30, the probability of reading both, not exactly one. Using 52, the number who read at least one type, as the denominator instead of the full 60 readers surveyed gives 38/52 = 19/26.
Build your own mix at the worksheet builder.