Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A ferry company finds that on 20% of days the sea is rough. If the sea is rough, the probability that a crossing is delayed is 0.75. If the sea is calm, the probability that a crossing is delayed is 0.1. Given that a crossing was delayed, work out the probability that the sea was rough that day.
- 2.A grower knows that the probability that one of their seeds germinates is 0.6. The grower wants to expect 300 of the seeds to germinate. Work out how many seeds the grower should plant.
- 3.Two ordinary fair dice are rolled and the two scores are added together. Given that the total is an even number, work out the probability that the total is 8.
- 4.A bag contains 3 yellow counters and 2 green counters. Sophie takes one counter at random and does not put it back. She then takes a second counter at random. Work out the probability that the first counter is yellow and the second is green.
- 5.A two-way table records 150 customers at a café. 90 of the customers bought a hot drink and the rest did not. 54 of the hot-drink customers also bought a cake. 21 of the customers who did not buy a hot drink bought a cake. Work out the percentage of all 150 customers who bought a cake.
- 6.250 people took a theory test at one test centre. 150 of them had taken a preparation course and the rest had not. 120 of those who had taken the course passed and 50 of those who had not taken the course passed. One of the people who passed is picked at random. Work out the probability that this person had taken the preparation course.
- 7.In a certain town, P(rain on Monday) = 0.3. If it rains on Monday, the probability that it also rains on Tuesday is 0.6. If it does not rain on Monday, the probability that it rains on Tuesday is 0.25. Work out the probability that it rains on Tuesday.
- 8.In a group of 50 people, 32 own a car, 20 own a bicycle and 9 own both a car and a bicycle. A person who owns a bicycle is picked at random. Work out the probability that this person does not own a car.
- 9.A factory makes bolts on two machines. Machine A makes 60% of the bolts and machine B makes the other 40%. 5% of the bolts made by machine A are faulty and 10% of the bolts made by machine B are faulty. A bolt is picked at random from one day's production. Work out the probability that it was made by machine B and is faulty. Give your answer as a decimal.
- 10.A survey of 60 readers records: 21 read only fiction, 17 read only non-fiction, 14 read both, and the rest read neither. Work out the probability that a randomly chosen reader reads exactly one of the two types, giving your answer as a fraction in its simplest form.
- 11.The probability that Priya scores with a netball shot is 3/4. She takes two shots, and the shots are independent. Work out the probability that she scores with her first shot but misses her second shot.
- 12.At a school car park, each car is a saloon, an estate or a hatchback, and no car is more than one of these. Among 200 cars, the probability that a car chosen at random is a saloon is 0.28 and the probability that it is an estate is 0.37. Work out how many of the 200 cars are hatchbacks.
- 13.A train company runs 25 trains a day, every day. The probability that any one train is late is 0.08. Work out how many late trains the company should expect over a period of 4 weeks.
- 14.A machine makes 4000 light bulbs a day and runs 5 days a week. Two inspectors test bulbs from this machine. Inspector A tests 40 bulbs and finds 4 faulty. Inspector B tests 500 bulbs and finds 30 faulty. Using the better of the two estimates, work out how many faulty bulbs the machine is expected to make in one week.
- 15.A market stall sells umbrellas. Over the last 250 days, it rained on 70 of them. Using this as an estimate of the probability of rain, work out how many rainy days would be expected in the next 365 days.
Answer key
- (c) 15/23 — Method: find P(rough and delayed) and the overall P(delayed) using the tree, then divide. Working: P(rough and delayed) = 0.2 × 0.75 = 0.15. P(calm and delayed) = 0.8 × 0.1 = 0.08. P(delayed) = 0.15 + 0.08 = 0.23. P(rough | delayed) = 0.15 ÷ 0.23 = 15/23. Answer: 15/23. Watch out: leaving the answer as 0.15 (3/20) gives P(rough and delayed) itself, without dividing by the overall probability that a crossing is delayed. Giving 0.75 (3/4) is the probability you were told to start with — that a crossing is delayed GIVEN the sea is rough — which is the reverse of what's being asked. And 0.2 (1/5) is just the original probability that the sea is rough, before you take the fact that the crossing was delayed into account.
- (c) 500 — Method: the expected number of successes is the number of trials multiplied by the probability, so to find the number of trials, divide the expected number by the probability. Working: let n be the number of seeds planted. Then n multiplied by 0.6 must come to 300, so n = 300 ÷ 0.6 = 500. Answer: the grower should plant 500 seeds. The distractors: 180 comes from multiplying instead of dividing, 300 × 0.6 = 180, which answers how many of 300 seeds would germinate; 750 comes from dividing by the probability of not germinating, 300 ÷ 0.4 = 750; 120 comes from multiplying by that same 0.4, 300 × 0.4 = 120.
- (c) 5/18 — Method: knowing the total is even cuts the 36 equally likely outcomes down to the even ones, so count those first and then count how many of them give 8. Working: the even totals occur as 2 once, 4 three times, 6 five times, 8 five times, 10 three times and 12 once, which is 18 outcomes. The total is 8 for 2 and 6, 3 and 5, 4 and 4, 5 and 3, and 6 and 2, which is 5 outcomes. The probability is 5/18, which will not cancel. Answer: the probability is 5/18. The distractors: 5/36 keeps the right count of ways to make 8 but divides by all 36 outcomes, ignoring the fact that the odd totals have already been ruled out; 1/6 treats the six even totals 2, 4, 6, 8, 10 and 12 as equally likely and picks one of them, which they are not; 1/11 treats the eleven possible totals from 2 to 12 as equally likely and uses neither the counting nor the condition.
- (b) 3/10 — Method: on a tree diagram, follow the path that matches the description and multiply the probabilities written along it; with nothing put back, the second set of branches is worked out from the counters that are left. Working: 3 of the 5 counters are yellow, so the first branch of the path is 3/5. A yellow counter has been kept out, so 4 counters remain and both green counters are still there, making the second branch 2/4. Multiplying along the path gives 6/20. Answer: the probability is 3/10. The distractors: 6/25 comes from using 2/5 on the second branch, which is the tree for a counter that is put back; 3/20 comes from taking one off the green count as well as off the total, using 1/4 on the second branch; 3/5 comes from reading the first branch only and never multiplying along the path.
- (b) 50% — The total number of customers who bought a cake is 54 + 21 = 75, combining both hot-drink and non-hot-drink customers. As a percentage of all 150 customers, this is (75 ÷ 150) × 100 = 50%. Choosing 36% comes from only counting the hot-drink customers who bought a cake, (54 ÷ 150) × 100 = 36%, and forgetting the 21 non-hot-drink customers who also bought a cake. Choosing 14% comes from only counting the non-hot-drink customers who bought a cake, (21 ÷ 150) × 100 = 14%, and forgetting the 54 hot-drink customers who also bought a cake. Choosing 60% comes from dividing by the hot-drink total of 90 instead of the grand total of 150, (54 ÷ 90) × 100 = 60%.
- (d) 12/17 — Method: the person picked is known to have passed, so the sample space is everyone who passed; divide the course takers who passed by that total. Working: 120 course takers and 50 others passed, so 170 people passed. The course takers who passed give 120/170, and dividing the numerator and the denominator by 10 gives 12/17. Answer: the probability is 12/17. The distractors: 4/5 is 120/150, the probability that someone passed given that they took the course, which reverses the condition and the event; 12/25 is 120/250, dividing by everyone who sat the test rather than by the 170 who passed; 17/25 is 170/250, the probability that a person picked from everyone sitting the test passed, which answers a different question altogether.
- (b) 0.355 — Method: use the law of total probability across the two Monday branches: P(rain Tue) = P(rain Mon) × P(rain Tue | rain Mon) + P(no rain Mon) × P(rain Tue | no rain Mon). Working: P(no rain Mon) = 1 − 0.3 = 0.7. P(rain Tue) = (0.3 × 0.6) + (0.7 × 0.25) = 0.18 + 0.175 = 0.355. Answer: 0.355. Watch out: using only the rain-Monday branch (0.3 × 0.6) or only the no-rain-Monday branch (0.7 × 0.25) accounts for just one of the two ways Tuesday can turn out rainy — both branches must be added. And swapping which weekday-probability multiplies which branch (0.7 with the rain branch, 0.3 with the no-rain branch) uses the right numbers on the wrong branches.
- (b) 11/20 — Method: the person picked is known to own a bicycle, so work inside the 20 bicycle owners and count how many of them do not own a car. Working: 9 of the 20 bicycle owners also own a car, so 11 of them do not. The probability is 11/20, which will not cancel. Answer: the probability is 11/20. The distractors: 9/20 gives the bicycle owners who DO own a car, answering the opposite event inside the correct group; 11/50 divides by the whole group of 50, keeping the restricted numerator but the full denominator; 11/32 puts the count over the number of car owners, conditioning on the wrong group entirely.
- (c) 0.04 — Method: 'made by machine B and faulty' is the second branch of a tree followed after the first, so multiply the probability of machine B by the probability of a fault given machine B. Working: machine B makes 0.4 of the bolts, and 0.1 of those bolts are faulty, so the probability is 0.4 × 0.1 = 0.04. Answer: the probability is 0.04. The distractors: 0.5 comes from adding 0.4 and 0.1 instead of multiplying, treating two stages of one journey as two separate outcomes; 0.1 gives the fault rate for machine B on its own, as though every bolt in the factory came from machine B, so the 40% share is never used; 0.07 is 0.6 × 0.05 added to 0.4 × 0.1, the probability that a bolt is faulty whichever machine made it, which answers a question about all the production rather than about machine B.
- (d) 19/30 — Exactly one means only fiction or only non-fiction, not both: 21 + 17 = 38 out of the 60 readers, which simplifies to 19/30. Including the 14 who read both as well gives 21 + 17 + 14 = 52, so 52/60 = 13/15 — that is at least one, not exactly one. Using only the both-count, 14, as the numerator gives 14/60 = 7/30, the probability of reading both, not exactly one. Using 52, the number who read at least one type, as the denominator instead of the full 60 readers surveyed gives 38/52 = 19/26.
- (c) 3/16 — The probability that Priya misses a shot is 1 − 3/4 = 1/4. The two shots are independent, so multiply the probability of scoring the first shot by the probability of missing the second shot: 3/4 × 1/4 = 3/16. Choosing 9/16 comes from using the probability of scoring, 3/4, for both shots instead of switching to the miss probability for the second shot, 3/4 × 3/4 = 9/16, which is the probability that she scores with both shots. Choosing 1/2 comes from subtracting the two probabilities instead of multiplying them, 3/4 − 1/4 = 1/2. Choosing 3/4 comes from giving only the probability that she scores with the first shot, forgetting to combine it with what happens on the second shot.
- (b) 70 — Saloon, estate and hatchback are exhaustive, so their probabilities sum to 1: the probability of a hatchback is 1 − 0.28 − 0.37 = 0.35. The number of hatchbacks is 0.35 × 200 = 70. Treating the SUM of the other two probabilities, 0.28 + 0.37 = 0.65, as the probability of a hatchback instead of its complement gives 0.65 × 200 = 130. Multiplying the correct probability, 0.35, by 100 instead of the 200 cars actually surveyed gives 35. Averaging the two given probabilities, (0.28 + 0.37) ÷ 2 = 0.325, instead of subtracting them from 1, and then multiplying by 200 gives 65.
- (d) 56 — Method: count the trials over the whole period first, then multiply the number of trials by the probability. Working: 4 weeks is 4 × 7 = 28 days, and at 25 trains a day that is 25 × 28 = 700 trains. The expected number of late trains is 700 × 0.08 = 56. Answer: about 56 late trains over the 4 weeks. The distractors: 2 is the expected number for a single day, 25 × 0.08 = 2, with the 28 days never brought in; 14 uses one week instead of four, 25 × 7 × 0.08 = 14; 644 is 700 − 56 and counts the trains expected to be on time.
- (a) 1200 — Method: take the estimate from the larger sample, because an unbiased relative frequency tends towards the true probability as the sample grows, then multiply by the number of bulbs made in a week. Working: Inspector B tested 500 bulbs, far more than Inspector A's 40, so use B's relative frequency: 30 ÷ 500 = 0.06. A week's production is 4000 × 5 = 20000 bulbs. The expected number of faulty bulbs is 20000 × 0.06 = 1200. Answer: about 1200 faulty bulbs a week. The distractors: 2000 uses Inspector A's estimate, 4 ÷ 40 = 0.1, giving 20000 × 0.1 = 2000, and so rests on a sample of only 40 bulbs; 1600 comes from averaging the two estimates of 0.1 and 0.06 to get 0.08, and 20000 × 0.08 = 1600, which gives the small sample equal weight with the large one; 240 uses the right estimate but stops at a single day, 4000 × 0.06 = 240.
- (c) 102 — Method: turn the past record into a relative frequency, then use it as an estimate of the probability of rain and multiply by the number of days being predicted for. Working: relative frequency of rain = 70 ÷ 250 = 0.28. Expected rainy days in 365 days = 365 × 0.28 = 102.2, which rounds to about 102 days. Answer: about 102 days. Watch out: writing down 48 swaps which number is the sample and which is the target, working out 70 ÷ 365 × 250 instead of 70 ÷ 250 × 365. Writing down 70 just repeats the original count of rainy days without scaling it up to the new, longer period at all. And writing down 110 comes from rounding the relative frequency to 0.3 before multiplying, 365 × 0.3 = 109.5, when 70 ÷ 250 is exactly 0.28 and needs no rounding at all.
Build your own mix at the worksheet builder.