Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.The probability that it rains on a given morning is 0.3. If it rains, the probability that Priya's bus is late is 0.8. If it does not rain, the probability that her bus is late is 0.1. Work out the probability that her bus is late.
- 2.A bag contains beads that are exactly one of red, white or black. The probability of taking a red bead is 3/10 and the probability of taking a white bead is 1/4. Work out the probability of taking a bead that is red or white.
- 3.The universal set is {1, 2, 3, ..., 15}. A = {multiples of 3}. Work out n(A′), the number of elements not in A.
- 4.A charity raffle sells 250 tickets. A group of friends buy 40 of the tickets between them. Three prizes are awarded, each to a different randomly drawn ticket, and no ticket can win more than one prize. Work out the expected number of prizes won by the group. Give your answer as a fraction in its simplest form.
- 5.A fair coin is flipped and a fair five-sided spinner, labelled 1 to 5, is spun. All the outcomes are listed as pairs, such as (H, 3). Work out the probability that the outcome is a tail and an odd number.
- 6.A garage tested 200 cars in one week. 70% of the cars were more than 3 years old and the rest were 3 years old or less. Of the cars more than 3 years old, 1 in 4 failed the test. 12 of the cars that were 3 years old or less failed the test. Work out how many of the 200 cars failed the test altogether.
- 7.A factory makes bolts on two machines. Machine A makes 60% of the bolts and machine B makes the other 40%. 5% of the bolts made by machine A are faulty and 10% of the bolts made by machine B are faulty. A bolt is picked at random from one day's production. Work out the probability that it was made by machine B and is faulty. Give your answer as a decimal.
- 8.A machine makes 4000 light bulbs a day and runs 5 days a week. Two inspectors test bulbs from this machine. Inspector A tests 40 bulbs and finds 4 faulty. Inspector B tests 500 bulbs and finds 30 faulty. Using the better of the two estimates, work out how many faulty bulbs the machine is expected to make in one week.
- 9.A pupil must choose 2 different subjects at random from these five: maths, physics, biology, chemistry and history. Work out the probability that the two subjects chosen are maths and biology.
- 10.At a school car park, each car is a saloon, an estate or a hatchback, and no car is more than one of these. Among 200 cars, the probability that a car chosen at random is a saloon is 0.28 and the probability that it is an estate is 0.37. Work out how many of the 200 cars are hatchbacks.
- 11.A market research company found that, out of 120 shoppers surveyed, 42 preferred paper bags to plastic bags. A supermarket expects 900 shoppers this week. Using this relative frequency, work out how many of the 900 shoppers would be expected to prefer paper bags.
- 12.A clinic recorded 300 booked appointments using a frequency tree. The first branch splits them into 210 adult appointments and the rest child appointments. Of the adult appointments, 189 were attended and the rest were missed. Of the child appointments, 81 were attended. Work out the probability that a booked appointment, chosen at random from the 300, was missed. Give your answer as a fraction in its simplest form.
- 13.A council surveyed 140 households about recycling. 85 of the households are in Zone A. 52 of the Zone A households recycle glass. 21 of the Zone B households do not recycle glass. Work out the probability that a household, chosen at random from the 140, recycles glass. Give your answer as a fraction in its simplest form.
- 14.A bag contains 5 yellow marbles and 3 blue marbles. Noah takes a marble at random, notes its colour and puts it back in the bag. He then takes a second marble at random. Work out the probability that the first marble is yellow and the second marble is blue.
- 15.For two events A and B, P(A) = 0.6 and P(A and B) = 0.15. Work out P(B | A).
Answer key
- (c) 0.31 — Method: a late bus can be reached along two paths of the tree. Multiply along each path, then add the paths that end in a late bus. Working: the rain path gives 0.3 × 0.8 = 0.24. No rain has probability 1 − 0.3 = 0.7, so the second path gives 0.7 × 0.1 = 0.07. Adding the two paths gives 0.24 + 0.07. Answer: the probability is 0.31. The distractors: 0.9 comes from adding the two branch probabilities 0.8 and 0.1 without first weighting them by how often it rains; 0.24 comes from following the rain path only and ignoring that the bus can also be late when it is dry; 0.27 comes from using 0.3 at the start of both paths, so that the no-rain path is given 0.3 × 0.1 instead of 0.7 × 0.1.
- (c) 11/20 — 'Red or white' combines two mutually exclusive events, so add their probabilities: 3/10 = 6/20 and 1/4 = 5/20, giving 6/20 + 5/20 = 11/20. Multiplying the two probabilities instead of adding them, 3/10 × 1/4, gives 3/40, which would be the probability of red and white together, not red or white — and a bead can't be both colours. Subtracting the sum from 1, 1 − 11/20 = 9/20, gives the probability of the bead being black instead of red or white. Converting 1/4 as 4/20 instead of 5/20 (dividing 20 by 4 but forgetting to scale the numerator) gives 6/20 + 4/20 = 1/2.
- (b) 10 — Method: A′ means everything in the universal set that is NOT in A, so n(A′) = n(universal set) − n(A). Working: the universal set has 15 elements. A = {3, 6, 9, 12, 15}, so n(A) = 5. n(A′) = 15 − 5 = 10. Answer: 10. Watch out: writing down 5 gives n(A) itself, the size of the multiples-of-3 set, which is the opposite of its complement. Writing down 11 comes from missing 15 off the list of multiples of 3, treating A as only {3, 6, 9, 12}, so A is undercounted as 4 and A′ is overstated as 15 − 4. And writing down 12 comes from only listing the multiples of 3 up to 9 — 3, 6 and 9 — and missing that 12 and 15 also belong to A, undercounting A as 3 rather than 5.
- (d) 12/25 — The group holds 40 of the 250 tickets, so for any one prize the probability the group wins it is 40/250 = 4/25. There are 3 prizes and the group has the same chance at each one, so the expected number won is 3 × 4/25 = 12/25. Writing 4/25 is wrong because it is the chance of winning just ONE prize, without multiplying by the 3 prizes available. Writing 4/75 is wrong because it divides by the 3 prizes instead of multiplying (4/25 ÷ 3 = 4/75), which would mean the group did worse the more prizes were on offer. Writing 64/15625 is wrong because it multiplies the single-prize probability by itself three times, (4/25)³, as though all three prizes had to be won together, instead of adding up the expected number across the three separate prizes. The expected number of prizes won by the group is 12/25.
- (d) 3/10 — Method: list the full possibility space as pairs of coin and spinner results, then count how many pairs satisfy both conditions and divide by the size of the whole space. Working: the coin gives 2 outcomes and the spinner gives 5, so the full space has 2 × 5 = 10 equally likely pairs. The pairs with a tail and an odd number are (T,1), (T,3) and (T,5), which is 3 out of 10. Answer: 3/10. Watch out: writing down 1/2 uses only the coin's own chance of a tail and ignores that the spinner also has to land on an odd number. Writing down 3/5 uses only the spinner's chance of landing on an odd number and ignores the coin altogether. And writing down 1/10 counts just one matching outcome, such as (T,1), instead of all three pairs that satisfy both conditions.
- (c) 47 — Method: fill the first pair of branches of the frequency tree, then the failures on each branch, then add only the failing end branches. Working: 70% of 200 is 140, so 140 cars were more than 3 years old and 200 − 140 = 60 cars were 3 years old or less. One quarter of the older cars failed: 140 ÷ 4 = 35. The newer branch gives 12 failures. Adding the two failing branches gives 35 + 12 = 47. Answer: 47 of the cars failed the test. The distractors: 35 is the older branch on its own, with the 12 newer failures never added; 62 comes from taking 1 in 4 of all the cars, 200 ÷ 4 = 50, and then adding the 12; 153 is 200 − 47 and counts the cars that passed.
- (c) 0.04 — Method: 'made by machine B and faulty' is the second branch of a tree followed after the first, so multiply the probability of machine B by the probability of a fault given machine B. Working: machine B makes 0.4 of the bolts, and 0.1 of those bolts are faulty, so the probability is 0.4 × 0.1 = 0.04. Answer: the probability is 0.04. The distractors: 0.5 comes from adding 0.4 and 0.1 instead of multiplying, treating two stages of one journey as two separate outcomes; 0.1 gives the fault rate for machine B on its own, as though every bolt in the factory came from machine B, so the 40% share is never used; 0.07 is 0.6 × 0.05 added to 0.4 × 0.1, the probability that a bolt is faulty whichever machine made it, which answers a question about all the production rather than about machine B.
- (a) 1200 — Method: take the estimate from the larger sample, because an unbiased relative frequency tends towards the true probability as the sample grows, then multiply by the number of bulbs made in a week. Working: Inspector B tested 500 bulbs, far more than Inspector A's 40, so use B's relative frequency: 30 ÷ 500 = 0.06. A week's production is 4000 × 5 = 20000 bulbs. The expected number of faulty bulbs is 20000 × 0.06 = 1200. Answer: about 1200 faulty bulbs a week. The distractors: 2000 uses Inspector A's estimate, 4 ÷ 40 = 0.1, giving 20000 × 0.1 = 2000, and so rests on a sample of only 40 bulbs; 1600 comes from averaging the two estimates of 0.1 and 0.06 to get 0.08, and 20000 × 0.08 = 1600, which gives the small sample equal weight with the large one; 240 uses the right estimate but stops at a single day, 4000 × 0.06 = 240.
- (b) 1/10 — Method: list every possible pair of subjects systematically, so that no pair is missed and no pair is counted twice, then compare the number of successful pairs with the size of the list. Working: pairing maths with each of the other four gives 4 pairs, physics with each subject after it gives 3, biology gives 2 and chemistry gives 1, so there are 4 + 3 + 2 + 1 = 10 pairs. Exactly one of them is maths with biology. Answer: the probability is 1/10. The distractors: 1/5 comes from counting maths-then-biology and biology-then-maths as two separate successes while still dividing by the 10 unordered pairs; 1/15 comes from a list that also pairs each subject with itself, giving 15 entries instead of 10; 1/4 comes from working out the second step alone, that 1 of the 4 subjects left after maths is biology, without allowing for the chance that maths is picked at all.
- (b) 70 — Saloon, estate and hatchback are exhaustive, so their probabilities sum to 1: the probability of a hatchback is 1 − 0.28 − 0.37 = 0.35. The number of hatchbacks is 0.35 × 200 = 70. Treating the SUM of the other two probabilities, 0.28 + 0.37 = 0.65, as the probability of a hatchback instead of its complement gives 0.65 × 200 = 130. Multiplying the correct probability, 0.35, by 100 instead of the 200 cars actually surveyed gives 35. Averaging the two given probabilities, (0.28 + 0.37) ÷ 2 = 0.325, instead of subtracting them from 1, and then multiplying by 200 gives 65.
- (d) 315 — The relative frequency from the survey is 42 ÷ 120 = 0.35, so the expected number who prefer paper bags among 900 shoppers is 0.35 × 900 = 315. Giving 42 as the answer reuses the original survey count without scaling it up to 900 shoppers at all. Finding the expected number who prefer PLASTIC bags instead of paper, using the relative frequency 78 ÷ 120 = 0.65, gives 0.65 × 900 = 585. Using 1000 shoppers instead of the 900 actually stated gives 0.35 × 1000 = 350.
- (c) 1/10 — On the adult branch, 210 − 189 = 21 appointments were missed. There are 300 − 210 = 90 child appointments, and 90 − 81 = 9 of those were missed. In total, 21 + 9 = 30 appointments were missed, out of 300: 30/300 = 1/10. Writing 7/100 is wrong because 21/300 simplifies to 7/100, and 21 only counts the adult branch, leaving out the 9 missed child appointments. Writing 3/100 is wrong because 9/300 simplifies to 3/100, and 9 only counts the child branch, leaving out the 21 missed adult appointments. Writing 1/9 is wrong because it divides the 30 missed appointments by the 270 that were attended (300 − 30) instead of by the whole 300 booked. The probability is 1/10.
- (a) 43/70 — There are 140 − 85 = 55 Zone B households, and 55 − 21 = 34 of them recycle glass. In total, 52 + 34 = 86 households recycle glass, out of 140: 86/140 = 43/70. Writing 13/35 is wrong because 52/140 simplifies to 13/35, and 52 only counts Zone A, leaving out the 34 Zone B recyclers. Writing 17/70 is wrong because 34/140 simplifies to 17/70, and 34 only counts Zone B, leaving out the 52 Zone A recyclers. Writing 73/140 is wrong because it adds the 52 Zone A recyclers to the 21 Zone B households that do NOT recycle, mixing up two different groups instead of adding the two recycling groups. The probability is 43/70.
- (d) 15/64 — Method: because the first marble is put back, the second draw is made from the same 8 marbles, so the two draws are independent and their probabilities are multiplied. Working: the bag holds 8 marbles both times, so yellow first has probability 5/8 and blue second has probability 3/8. Multiplying fractions gives 5 × 3 = 15 on the top and 8 × 8 = 64 on the bottom. Answer: the probability is 15/64. The distractors: 9/64 comes from working out the probability that BOTH marbles are blue, 3/8 × 3/8, instead of one of each colour in the stated order; 15/16 comes from multiplying the numerators but adding the denominators; 5/8 comes from writing down the first draw only and never combining it with the second.
- (c) 0.25 — Method: P(B | A) = P(A and B) ÷ P(A). Working: P(B | A) = 0.15 ÷ 0.6 = 0.25. Answer: 0.25. Watch out: multiplying 0.6 by 0.15 instead of dividing gives 0.09, and subtracting 0.15 from 0.6 gives 0.45 — neither uses the conditional probability formula. Leaving the answer as 0.15 mistakes the probability of A and B happening together for the probability of B once you already know A has happened — those are different quantities.
Build your own mix at the worksheet builder.