Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A spinner is divided into sectors of 144°, 90° and 126°, coloured purple, orange and grey in that order. The spinner is spun 300 times. Work out how many times you would expect it to land on purple.
- 2.A survey of 160 employees at a company recorded whether they cycle to work, using a frequency tree. The first branch splits them into 90 who work full-time and 70 who work part-time. Of the full-time employees, 27 cycle to work. Of the part-time employees, 14 cycle to work. Work out the probability that an employee, chosen at random from the 160, cycles to work. Give your answer as a fraction in its simplest form.
- 3.The probability that it rains on a given morning is 0.3. If it rains, the probability that Priya's bus is late is 0.8. If it does not rain, the probability that her bus is late is 0.1. Work out the probability that her bus is late.
- 4.A clinic recorded 300 booked appointments using a frequency tree. The first branch splits them into 210 adult appointments and the rest child appointments. Of the adult appointments, 189 were attended and the rest were missed. Of the child appointments, 81 were attended. Work out the probability that a booked appointment, chosen at random from the 300, was missed. Give your answer as a fraction in its simplest form.
- 5.On a probability scale from 0 to 1, five descriptions are used: impossible (0), unlikely (between 0 and 0.5), evens (exactly 0.5), likely (between 0.5 and 1) and certain (1). The probability that a particular bus is late is 3/8. Which description best fits this probability?
- 6.A ferry company finds that on 20% of days the sea is rough. If the sea is rough, the probability that a crossing is delayed is 0.75. If the sea is calm, the probability that a crossing is delayed is 0.1. Given that a crossing was delayed, work out the probability that the sea was rough that day.
- 7.A two-way table records how 180 students at a school travel: by bus or on foot, split by year group. There are 84 students in Year 11, of whom 38 travel by bus and the rest walk. The rest of the 180 students are in Year 10, and 42 of the Year 10 students travel by bus. Work out the probability that a randomly chosen Year 10 student walks to school. Give your answer as a fraction in its simplest form.
- 8.150 pupils are asked about swimming and cycling, and the results are recorded on a frequency tree. The first pair of branches splits the 150 pupils into 90 who swim and 60 who do not swim. Of the 90 who swim, 54 also cycle. Of the 60 who do not swim, 18 cycle. Work out P(S ∩ C), the probability that a pupil, chosen at random, swims and cycles. Give your answer as a fraction in its simplest form.
- 9.180 people entered a fun run. A frequency tree splits them into 108 adults and the rest children. It then splits each of those groups into those who finished and those who did not. 99 of the adults finished, and 153 of the 180 people finished altogether. Work out how many children did not finish.
- 10.At a garden centre, 3/5 of the plants for sale are perennials. 1/4 of the perennials are in flower. Work out the probability that a plant picked at random from the garden centre is a perennial and is in flower.
- 11.In a board game Mia moves forward by the total of two ordinary fair dice. Work out the probability that her total is 7. Give your answer as a fraction in its simplest form.
- 12.The probability that a seed fails to germinate is 1/5. Three seeds are planted independently. Work out the probability that at least one of the three seeds germinates.
- 13.A box contains counters that are silver, bronze or copper only. The probability that a counter taken at random is silver is 1/2 and the probability that it is bronze is 1/8. The box contains 64 counters in total. Work out the number of copper counters.
- 14.A factory tests components from a large batch in which 6% are defective. Two components are selected at random, and the batch is large enough that the selections can be treated as independent. Given that at least one of the two components is defective, work out the probability that both are defective.
- 15.An archer hits the bullseye with probability 0.24 on any one shot. She wants to know how many shots she must take to expect to hit the bullseye 12 times. Work out how many shots this is.
Answer key
- (b) 120 — Purple's probability is its angle out of the full circle: 144° ÷ 360° = 2/5. Expected number on purple = 2/5 × 300 = 120. Assuming the three colours are equally likely, ignoring their different angles, gives 300 ÷ 3 = 100. Using orange's angle, 90°, instead of purple's 144° gives a probability of 1/4, so 300 × 1/4 = 75. Treating 144 as a percentage instead of finding its fraction of 360° gives 300 × 0.144 = 43.2, which rounds to 43.
- (b) 41/160 — In total, 27 + 14 = 41 of the 160 employees cycle to work, so the probability is 41/160 (41 and 160 share no common factor, so this is already in its simplest form). Writing 27/160 is wrong because it only counts the full-time cyclists and leaves out the 14 part-time cyclists. Writing 41/90 is wrong because it uses the full-time total (90) as the denominator instead of the whole survey (160). Writing 1/5 is wrong because it only uses the part-time branch, simplifying 14/70 to 1/5 and ignoring the full-time cyclists completely. The probability is 41/160.
- (c) 0.31 — Method: a late bus can be reached along two paths of the tree. Multiply along each path, then add the paths that end in a late bus. Working: the rain path gives 0.3 × 0.8 = 0.24. No rain has probability 1 − 0.3 = 0.7, so the second path gives 0.7 × 0.1 = 0.07. Adding the two paths gives 0.24 + 0.07. Answer: the probability is 0.31. The distractors: 0.9 comes from adding the two branch probabilities 0.8 and 0.1 without first weighting them by how often it rains; 0.24 comes from following the rain path only and ignoring that the bus can also be late when it is dry; 0.27 comes from using 0.3 at the start of both paths, so that the no-rain path is given 0.3 × 0.1 instead of 0.7 × 0.1.
- (c) 1/10 — On the adult branch, 210 − 189 = 21 appointments were missed. There are 300 − 210 = 90 child appointments, and 90 − 81 = 9 of those were missed. In total, 21 + 9 = 30 appointments were missed, out of 300: 30/300 = 1/10. Writing 7/100 is wrong because 21/300 simplifies to 7/100, and 21 only counts the adult branch, leaving out the 9 missed child appointments. Writing 3/100 is wrong because 9/300 simplifies to 3/100, and 9 only counts the child branch, leaving out the 21 missed adult appointments. Writing 1/9 is wrong because it divides the 30 missed appointments by the 270 that were attended (300 − 30) instead of by the whole 300 booked. The probability is 1/10.
- (a) unlikely — 3/8 = 3 ÷ 8 = 0.375, which is between 0 and 0.5, so the probability is best described as unlikely. Rounding 3/8 loosely to 'about a half' without converting it properly leads to evens, which is wrong since 0.375 is noticeably below 0.5. Reading 3/8 as the complement and using 1 − 3/8 = 5/8 = 0.625 instead gives likely, but the question asks about the probability of 3/8 itself, not its complement. Flipping the fraction to 8/3 ≈ 2.67, which is impossible for a probability, and rounding it towards the top of the scale gives certain.
- (c) 15/23 — Method: find P(rough and delayed) and the overall P(delayed) using the tree, then divide. Working: P(rough and delayed) = 0.2 × 0.75 = 0.15. P(calm and delayed) = 0.8 × 0.1 = 0.08. P(delayed) = 0.15 + 0.08 = 0.23. P(rough | delayed) = 0.15 ÷ 0.23 = 15/23. Answer: 15/23. Watch out: leaving the answer as 0.15 (3/20) gives P(rough and delayed) itself, without dividing by the overall probability that a crossing is delayed. Giving 0.75 (3/4) is the probability you were told to start with — that a crossing is delayed GIVEN the sea is rough — which is the reverse of what's being asked. And 0.2 (1/5) is just the original probability that the sea is rough, before you take the fact that the crossing was delayed into account.
- (c) 9/16 — There are 180 students in total and 84 are in Year 11, so Year 10 has 180 − 84 = 96 students. Of those 96, 42 travel by bus, so 96 − 42 = 54 walk. P(Year 10 student walks) = 54/96 = 9/16. Using the whole school of 180 as the denominator instead of just the 96 Year 10 students gives 54/180 = 3/10. Using the bus count, 42, as if it were the number who walk gives 42/96 = 7/16, the wrong branch of the Year 10 row. Working out the probability for Year 11 instead of Year 10 — 46 walkers out of 84 — gives 46/84 = 23/42.
- (c) 9/25 — The frequency tree already shows the swim-and-cycle branch directly: 54 out of 150, which simplifies to 9/25. Adding both cycling branches together, 54 + 18 = 72, gives the total number of cyclists, so 72/150 = 12/25, not just those who also swim. Using the non-swimmers' cycling figure, 18, gives 18/150 = 3/25, the probability of cycling WITHOUT swimming. Using the swimmers' total of 90, before splitting by cycling, gives 90/150 = 3/5, the probability of swimming on its own.
- (d) 18 — Method: a frequency tree can be filled from either end, because a pair of branches adds up to the number above it and the matching end branches add up to the total for that outcome. Working: the children number 180 − 108 = 72. Of the 153 finishers, 99 were adults, so the children who finished number 153 − 99 = 54. Along the children's branch, 72 − 54 = 18 children did not finish. Answer: 18 children did not finish. The distractors: 27 is 180 − 153 and counts everyone who did not finish, adults included; 9 is 108 − 99 and counts only the adults who did not finish; 54 is the number of children who did finish, which is the branch next to the one asked for.
- (c) 3/20 — Method: the second fraction is quoted for the perennials only, so it is a conditional probability and the two fractions multiply. Working: the probability that a plant is a perennial is 3/5, and given that it is a perennial the probability that it is in flower is 1/4. Multiplying gives 3 × 1 over 5 × 4, which is 3/20. Answer: the probability is 3/20. The distractors: 17/20 comes from adding the fractions, 12/20 plus 5/20, instead of multiplying, which would be right only for two outcomes that cannot both happen; 4/9 comes from adding the numerators and the denominators separately, the classic 3 + 1 over 5 + 4; 1/4 quotes the flowering fraction on its own, as though every plant in the garden centre were a perennial, so the 3/5 is never used.
- (a) 1/6 — Method: write the results of the two dice as ordered pairs, count the pairs whose scores add to the total asked for, divide by the number of ordered pairs there are, then cancel the fraction down. Working: there are 6 × 6 = 36 equally likely ordered pairs. The pairs whose scores add to 7 are (1, 6), (2, 5), (3, 4), (4, 3), (5, 2) and (6, 1), which is 6 pairs, so the probability is 6/36. Dividing the top and the bottom by 6 gives 1/6. Answer: the probability is 1/6. The distractors: 7/36 comes from taking the number of favourable pairs to be 7 because 7 is the total asked for, confusing the size of a total with the number of ways of making it; 1/7 comes from using the 21 different combinations of two scores as the equally likely results, finding the 3 combinations 1 and 6, 2 and 5, 3 and 4, and cancelling 3/21; 6/11 comes from counting the 6 favourable pairs correctly but dividing by the 11 possible totals from 2 to 12 rather than by the 36 pairs.
- (d) 124/125 — The probability that a seed germinates is 1 − 1/5 = 4/5, so the probability that all three seeds fail to germinate is 1/5 × 1/5 × 1/5 = 1/125. The probability that at least one germinates is 1 − 1/125 = 124/125. Choosing 4/5 comes from giving the probability that a single seed germinates, forgetting to combine all three seeds. Choosing 64/125 comes from working out the probability that ALL three seeds germinate, 4/5 × 4/5 × 4/5 = 64/125, instead of at least one. Choosing 12/125 comes from working out the probability that EXACTLY one seed germinates, 3 × 4/5 × 1/5 × 1/5 = 12/125, instead of at least one.
- (c) 24 — Silver, bronze and copper cover every counter, so their probabilities sum to 1: P(copper) = 1 − 1/2 − 1/8 = 3/8. Number of copper counters = 3/8 × 64 = 24. Multiplying the silver probability by 64 gives 32, the number of silver counters, not copper. Multiplying the bronze probability by 64 gives 8, the number of bronze counters. Adding the silver and bronze probabilities (1/2 + 1/8 = 5/8) and multiplying by 64 gives 40, the combined number of silver and bronze counters, not the copper count.
- (b) 0.0309 — Method: P(both defective | at least one defective) = P(both defective) ÷ P(at least one defective). Find each using independence: P(both) = 0.06², P(at least one) = 1 − P(neither) = 1 − 0.94². Working: P(both) = 0.06² = 0.0036. P(neither) = 0.94² = 0.8836, so P(at least one) = 1 − 0.8836 = 0.1164. P(both | at least one) = 0.0036 ÷ 0.1164 = 0.0309 (3 s.f.). Answer: 0.0309. Watch out: leaving the answer as 0.0036 gives P(both defective) itself, not the probability once you already know at least one is defective — you still need to divide by P(at least one defective). Giving 0.0600 answers with the single-component defect rate, ignoring the condition altogether. And 0.5000 assumes that 'at least one' makes the outcomes 'exactly one defective' and 'both defective' equally likely, which is not how these probabilities combine.
- (a) 50 — To find the number of shots needed for an expected 12 hits, divide the number of hits wanted by the probability of a hit: 12 ÷ 0.24 = 50. Multiplying the number of hits by the probability instead of dividing gives 12 × 0.24 = 2.88, which rounds to 3 shots. Rounding 0.24 to 0.25 before dividing gives 12 ÷ 0.25 = 48. Using the probability of missing, 1 − 0.24 = 0.76, instead of the probability of hitting, gives 12 ÷ 0.76 = 15.79, which rounds to 16.
Build your own mix at the worksheet builder.