Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A factory makes bolts on two machines. Machine A makes 60% of the bolts and machine B makes the other 40%. 5% of the bolts made by machine A are faulty and 10% of the bolts made by machine B are faulty. A bolt is picked at random from one day's production. Work out the probability that it was made by machine B and is faulty. Give your answer as a decimal.
- 2.Two ordinary fair dice are rolled. Work out the probability that both dice show the same score.
- 3.An ordinary pack of 52 playing cards contains 13 hearts. One card is taken at random from the pack. Work out the probability that the card is not a heart. Give your answer as a percentage.
- 4.A factory finds that the probability a randomly chosen light bulb is defective is 0.035. In a batch of 4,000 bulbs, work out how many bulbs you would expect to work correctly.
- 5.In Manchester the probability of rain on any day in November is taken to be 0.3, and whether it rains on one day is independent of whether it rains on the next. Work out the probability that it rains on both the 10th and the 11th of November.
- 6.Spinner C has 3 equal sections, numbered 2, 3 and 5. Spinner D has 6 equal sections, numbered 1 to 6. Both spinners are spun once, and the two numbers are multiplied together. Work out the probability that the product is a multiple of 5.
- 7.On a probability scale from 0 to 1, five descriptions are used: impossible (0), unlikely (between 0 and 0.5), evens (exactly 0.5), likely (between 0.5 and 1) and certain (1). The probability that a particular bus is late is 3/8. Which description best fits this probability?
- 8.A train company runs 25 trains a day, every day. The probability that any one train is late is 0.08. Work out how many late trains the company should expect over a period of 4 weeks.
- 9.A garden centre recorded 240 plant sales using a frequency tree. The first stage splits the sales into three types: shrubs, bedding plants and trees. 96 sales were shrubs, 114 were bedding plants and the rest were trees. Work out the probability that a sale chosen at random from these 240 was a tree.
- 10.A company has 400 employees. 150 of them work part time and 160 of them cycle to work. Working part time and cycling to work are independent. Work out how many of the employees you would expect both to work part time and to cycle to work.
- 11.In a class experiment a fair six-sided dice is rolled 60 times and lands on a six 14 times. The whole school then rolls the same fair dice 3000 times. Work out the best estimate of the number of sixes the school should expect.
- 12.A fair coin is flipped three times. Work out the probability of getting at least one head.
- 13.A = {factors of 12} and B = {factors of 18}. Work out n(A ∩ B), the number of elements in both sets.
- 14.A biased spinner is spun 200 times. It lands on red 70 times, on blue 50 times, and on green 80 times. Using these results, work out the expected number of times the spinner does NOT land on red, in 500 spins of the same spinner.
- 15.A bag contains 5 letter tiles spelling the word MATHS, with one letter on each tile. Two tiles are drawn at random, one after the other, without the first tile being put back. Work out the probability that both tiles drawn are consonants.
Answer key
- (c) 0.04 — Method: 'made by machine B and faulty' is the second branch of a tree followed after the first, so multiply the probability of machine B by the probability of a fault given machine B. Working: machine B makes 0.4 of the bolts, and 0.1 of those bolts are faulty, so the probability is 0.4 × 0.1 = 0.04. Answer: the probability is 0.04. The distractors: 0.5 comes from adding 0.4 and 0.1 instead of multiplying, treating two stages of one journey as two separate outcomes; 0.1 gives the fault rate for machine B on its own, as though every bolt in the factory came from machine B, so the 40% share is never used; 0.07 is 0.6 × 0.05 added to 0.4 × 0.1, the probability that a bolt is faulty whichever machine made it, which answers a question about all the production rather than about machine B.
- (b) 1/6 — Method: list the ordered pairs where the two scores match, and divide by the 36 equally likely pairs. Working: the matching pairs are (1, 1), (2, 2), (3, 3), (4, 4), (5, 5) and (6, 6), which is 6 pairs out of 36, cancelling down to 1/6. Answer: 1/6. Watch out: writing down 1/36 finds the probability of one particular double, such as (6, 6), rather than any double at all. Guessing 1/2 treats 'same' and 'different' as equally likely events, when there are only 6 matching pairs against 30 non-matching ones. And writing down 1/3 comes from listing each double twice, once for each order of the two dice, giving 12 pairs out of 36 — but (1, 1) is a single outcome, and swapping the two dice over does not produce a second one.
- (d) 75% — Method: count how many cards are not hearts, write that count over the total number of cards, cancel the fraction down and then turn it into a percentage. Working: 52 − 13 = 39 cards are not hearts, so the probability is 39/52; dividing the numerator and the denominator by 13 gives 3/4, and 3/4 = 0.75, so 0.75 × 100 = 75. Answer: 75%, three quarters of the way along the 0 to 1 scale. The distractors: 25% comes from giving the probability that the card is a heart, 13 out of 52, which cancels to 1/4; 50% comes from reading 'not a heart' as 'not a red card' and halving the pack; 39% comes from writing the count of 39 cards straight down as the percentage without comparing it with the 52 cards in the pack.
- (a) 3,860 — The probability a bulb works correctly is the complement of being defective: 1 − 0.035 = 0.965. Expected number working correctly = 0.965 × 4,000 = 3,860. Using the probability of being defective instead of its complement gives 4,000 × 0.035 = 140, the expected number of DEFECTIVE bulbs, not working ones. Shifting the decimal point in the complement, using 0.0965 instead of 0.965, gives 4,000 × 0.0965 = 386. Assuming every bulb works, ignoring the 0.035 probability altogether, gives the full batch of 4,000.
- (a) 0.09 — Method: two independent events that must both happen are combined by multiplying their probabilities. Working: the same probability 0.3 applies to each day, so the calculation is 0.3 × 0.3. Written as fractions this is 3/10 × 3/10 = 9/100. Answer: the probability is 0.09. The distractors: 0.6 comes from adding 0.3 and 0.3 instead of multiplying them; 0.3 comes from quoting the single-day probability, as though the second day added no further condition; 0.9 comes from multiplying 3 by 3 correctly but keeping only one decimal place in the product instead of two.
- (a) 4/9 — There are 3 × 6 = 18 equally likely outcomes. The product is a multiple of 5 whenever Spinner C shows 5, whatever Spinner D shows, which is 6 outcomes, or whenever Spinner D shows 5 and Spinner C shows 2 or 3, which is 2 more outcomes. This gives 6 + 2 = 8 outcomes, so the probability is 8/18 = 4/9. Choosing 1/3 comes from only counting the 6 outcomes where Spinner C shows 5 and forgetting the 2 outcomes where Spinner D shows 5 instead. Choosing 1/9 comes from only counting the 2 outcomes where Spinner D shows 5 and forgetting the 6 outcomes where Spinner C shows 5. Choosing 1/2 comes from counting 9 outcomes instead of 8, by listing the case where Spinner C shows 5 and Spinner D shows 5 twice over.
- (a) unlikely — 3/8 = 3 ÷ 8 = 0.375, which is between 0 and 0.5, so the probability is best described as unlikely. Rounding 3/8 loosely to 'about a half' without converting it properly leads to evens, which is wrong since 0.375 is noticeably below 0.5. Reading 3/8 as the complement and using 1 − 3/8 = 5/8 = 0.625 instead gives likely, but the question asks about the probability of 3/8 itself, not its complement. Flipping the fraction to 8/3 ≈ 2.67, which is impossible for a probability, and rounding it towards the top of the scale gives certain.
- (d) 56 — Method: count the trials over the whole period first, then multiply the number of trials by the probability. Working: 4 weeks is 4 × 7 = 28 days, and at 25 trains a day that is 25 × 28 = 700 trains. The expected number of late trains is 700 × 0.08 = 56. Answer: about 56 late trains over the 4 weeks. The distractors: 2 is the expected number for a single day, 25 × 0.08 = 2, with the 28 days never brought in; 14 uses one week instead of four, 25 × 7 × 0.08 = 14; 644 is 700 − 56 and counts the trains expected to be on time.
- (b) 1/8 — Shrubs, bedding plants and trees are the three branches at the first stage of the tree, so they must total 240: tree sales = 240 − 96 − 114 = 30. So P(tree) = 30/240 = 1/8. Using the shrub count instead, 96/240 = 2/5, is the probability of a shrub sale, not a tree sale. Using the bedding-plant count instead, 114/240 = 19/40, is the probability of a bedding-plant sale. Subtracting the bedding count from the shrub count (114 − 96 = 18) instead of subtracting both from 240 gives 18/240 = 3/40, which is not the number of tree sales at all.
- (b) 60 — Method: independence means the proportion of part timers among the cyclists is the same as the proportion among all the employees, so find that proportion and apply it to the cyclists. Working: 150 of the 400 employees work part time, which is a proportion of 0.375. Applying it to the 160 cyclists gives 0.375 × 160 = 60 employees. Answer: you would expect 60 employees. The distractors: 310 adds 150 and 160, treating the group who do both as everyone who does one thing or the other; 10 subtracts 150 from 160, reading 'both' as the difference between the two counts; 75 halves the 150 part timers, assuming that independence means they split evenly between cyclists and non cyclists, which would need exactly half the workforce to cycle.
- (b) 500 — Method: when a dice is known to be fair, the theoretical probability is the best thing to work from, and the more trials there are the closer the results tend to it. Working: for a fair dice the probability of a six is 1/6, so the expected number of sixes in 3000 rolls is 3000 × 1 ÷ 6 = 500. The class experiment gave a relative frequency of 14/60, but 60 trials is far too few to overturn a known theoretical value, and the school's 3000 rolls will tend towards 1/6 in any case. Answer: about 500 sixes. The distractors: 700 comes from using the class relative frequency instead of the theory, 3000 × 14 ÷ 60 = 700; 600 comes from splitting the difference between the two, since 1/6 is about 0.167 and 14/60 is about 0.233, whose mean is 0.2, and 3000 × 0.2 = 600; 2500 uses 5/6 instead of 1/6 and counts the rolls expected not to be a six.
- (c) 7/8 — Method: 'at least one head' is the opposite of 'no heads at all', so work out the probability of three tails and take it away from 1. Working: a flip that is not a head has probability 1/2, and the flips are independent, so three tails in a row has probability 1/2 × 1/2 × 1/2 = 1/8. Taking this from 8/8 leaves 7/8. Answer: the probability is 7/8. The distractors: 1/8 is the probability of three tails, written down without the final subtraction; 3/8 is the probability of exactly one head, which comes from reading 'at least one' as 'exactly one'; 1/2 comes from giving the probability of a head on a single flip and ignoring that three flips are made.
- (d) 4 — Method: list the elements of each set in full, then find which elements appear in both lists — that is A ∩ B. Working: factors of 12 = {1, 2, 3, 4, 6, 12}. Factors of 18 = {1, 2, 3, 6, 9, 18}. The elements in both lists are 1, 2, 3 and 6, so A ∩ B = {1, 2, 3, 6} and n(A ∩ B) = 4. Answer: 4. Watch out: writing down 6 gives n(A), the size of the factors-of-12 list on its own, not the size of the overlap. Writing down 8 comes from counting every element that appears in EITHER list, 1, 2, 3, 4, 6, 9, 12 and 18 — that is the union, a different set from the intersection. And writing down 3 misses that 1 is a factor of both 12 and 18, and so belongs in A ∩ B alongside 2, 3 and 6.
- (c) 325 — Method: first find the relative frequency of NOT landing on red from the 200 spins, then scale that up to 500 spins. Working: non-red results = 50 + 80 = 130, out of 200 spins, so P(not red) = 130 ÷ 200 = 0.65. Expected non-red results in 500 spins = 500 × 0.65 = 325. Answer: 325. Watch out: writing down 175 finds the expected number of RED results instead, 70 ÷ 200 × 500 = 175, answering the opposite of what was asked. Writing down 250 assumes landing red or not landing red must be a fair 50-50 split, but the spinner is biased and the actual results do not split evenly. And writing down 130 stops after finding how many of the 200 spins were non-red and forgets to scale that figure up to the 500 spins asked for.
- (d) 3/5 — The first tile drawn is a consonant with probability 4/5, since 4 of the 5 letters in MATHS are consonants. Since it is not replaced, 3 consonants remain out of the 4 tiles left, so the second tile is a consonant with probability 3/4. Multiplying gives 4/5 × 3/4 = 3/5. Choosing 4/5 comes from only using the probability for the first draw and forgetting the second draw changes once a tile is removed. Choosing 3/4 comes from only using the probability for the second draw on its own. Choosing 16/25 comes from treating the two draws as independent, using 4/5 × 4/5 = 16/25, which would only be correct if the first tile were replaced before the second draw.
Build your own mix at the worksheet builder.