Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A biased spinner is spun 200 times. It lands on red 70 times, on blue 50 times, and on green 80 times. Using these results, work out the expected number of times the spinner does NOT land on red, in 500 spins of the same spinner.
- 2.A spinner can land on red, blue, green or yellow, and it cannot land on more than one colour. The probability that it lands on red is 0.05 and the probability that it lands on yellow is 0.35. The probability that it lands on blue is twice the probability that it lands on green. Work out the probability that it lands on green.
- 3.A spinner lands on one of four colours: amber, black, cyan or damson. The probability it lands on amber is 0.18, on black is 0.22 and on cyan is 0.24. Work out the probability that it lands on amber or damson.
- 4.A seed company tests germination using results from three greenhouses. Greenhouse 1 plants 200 seeds and 172 germinate. Greenhouse 2 plants 150 seeds and 126 germinate. Greenhouse 3 plants 250 seeds and 212 germinate. Using the combined results from all three greenhouses, work out the best estimate of the number of seeds, out of a new batch of 4000 seeds, that would be expected to germinate.
- 5.At a fair, a game costs £2 to play. The probability of winning the game is 0.15, and each win pays out £10. Amir plays the game 200 times. Work out how much money Amir should expect to lose in total.
- 6.A grower knows that the probability that one of their seeds germinates is 0.6. The grower wants to expect 300 of the seeds to germinate. Work out how many seeds the grower should plant.
- 7.A four-colour spinner (red, blue, green, yellow) is spun repeatedly, and the relative frequency of landing on green is recorded as the number of spins increases: after 20 spins it is 0.350; after 200 spins it is 0.290; after 2000 spins it is 0.251. Using the result from 2000 spins as the best estimate of the probability, work out the number of times the spinner would be expected to land on green in a further 3000 spins.
- 8.A two-way table records 150 customers at a café. 90 of the customers bought a hot drink and the rest did not. 54 of the hot-drink customers also bought a cake. 21 of the customers who did not buy a hot drink bought a cake. Work out the percentage of all 150 customers who bought a cake.
- 9.An archer hits the bullseye with probability 0.24 on any one shot. She wants to know how many shots she must take to expect to hit the bullseye 12 times. Work out how many shots this is.
- 10.A frequency tree records 320 calls to a helpline. The calls first split into calls about billing and calls about technical support. Of the technical support calls, the probability that a call was resolved on the first contact is 0.75. If 180 technical support calls were resolved on the first contact, work out how many calls were about billing.
- 11.In a trial, a drawing pin was dropped 80 times and landed point-up 52 times. Assuming this relative frequency continues, work out how many times you would expect it to land point-up in 300 drops.
- 12.On the probability scale from 0 (impossible) to 1 (certain), evens is exactly halfway. An event is 3/10 more likely than evens. Work out the probability of that event, giving your answer as a decimal.
- 13.A bag contains 3 yellow counters and 2 green counters. Sophie takes one counter at random and does not put it back. She then takes a second counter at random. Work out the probability that the first counter is yellow and the second is green.
- 14.An ordinary fair dice is rolled once. Set A is the set of even scores and set B is the set of scores greater than 4. Work out the probability that the score rolled is in set A or in set B or in both.
- 15.A factory makes bolts on two machines. Machine A makes 60% of the bolts and machine B makes the other 40%. 5% of the bolts made by machine A are faulty and 10% of the bolts made by machine B are faulty. A bolt is picked at random from one day's production. Work out the probability that it was made by machine B and is faulty. Give your answer as a decimal.
Answer key
- (c) 325 — Method: first find the relative frequency of NOT landing on red from the 200 spins, then scale that up to 500 spins. Working: non-red results = 50 + 80 = 130, out of 200 spins, so P(not red) = 130 ÷ 200 = 0.65. Expected non-red results in 500 spins = 500 × 0.65 = 325. Answer: 325. Watch out: writing down 175 finds the expected number of RED results instead, 70 ÷ 200 × 500 = 175, answering the opposite of what was asked. Writing down 250 assumes landing red or not landing red must be a fair 50-50 split, but the spinner is biased and the actual results do not split evenly. And writing down 130 stops after finding how many of the 200 spins were non-red and forgets to scale that figure up to the 500 spins asked for.
- (c) 0.2 — Let P(green) = x, so P(blue) = 2x. Red, blue, green and yellow are exhaustive: 0.05 + 0.35 + x + 2x = 1, so 0.4 + 3x = 1, giving 3x = 0.6 and x = 0.2. So P(green) = 0.2. Splitting the remaining 0.6 evenly between blue and green, ignoring the 2:1 ratio, gives 0.3. Working out x correctly but then reporting 2x, the probability of blue, gives 0.4. Stopping after finding that blue and green together account for 0.6, without dividing by the three equal shares of x, gives 0.6.
- (a) 0.54 — The four colours are exhaustive, so all four probabilities sum to 1: the probability of damson is 1 − 0.18 − 0.22 − 0.24 = 0.36. Amber and damson cannot both happen on one spin, so the probability of amber or damson is 0.18 + 0.36 = 0.54. Stopping after finding the probability of damson alone, without adding the probability of amber, gives 0.36. Adding the three given probabilities together, 0.18 + 0.22 + 0.24 = 0.64, and treating that total as the answer never finds the probability of damson at all. Subtracting only the probability of amber from 1, 1 − 0.18 = 0.82, ignores black, cyan and damson completely.
- (d) 3400 — Combining all three greenhouses gives 200 + 150 + 250 = 600 seeds planted in total, and 172 + 126 + 212 = 510 germinated, so the combined estimate of the germination probability is 510/600 = 0.85. Out of a new batch of 4000 seeds, the expected number to germinate is 4000 × 0.85 = 3400. Writing 3440 is wrong because it uses only Greenhouse 1's rate, 172/200 = 0.86, instead of the combined rate from all three: 4000 × 0.86 = 3440. Writing 3360 is wrong because it uses only Greenhouse 2's rate, 126/150 = 0.84: 4000 × 0.84 = 3360. Writing 510 is wrong because that is the total number that germinated in the ORIGINAL trial, not scaled up to the new batch of 4000 seeds at all. The best estimate is 3400 seeds.
- (b) £100 — Method: find the expected number of wins, turn that into the expected pay out, then compare it with what the games cost. Working: the expected number of wins is 200 × 0.15 = 30. Each win pays £10, so the expected pay out is 30 × 10 = 300 pounds. Playing 200 times at £2 a go costs 200 × 2 = 400 pounds. The expected loss is 400 − 300 = 100 pounds. Answer: Amir should expect to be about £100 down. The distractors: £300 is the expected winnings on their own, with the cost of playing never taken off; £400 is the total cost of playing, with the winnings never taken off; £700 comes from adding the two totals, 400 + 300 = 700, instead of subtracting one from the other.
- (c) 500 — Method: the expected number of successes is the number of trials multiplied by the probability, so to find the number of trials, divide the expected number by the probability. Working: let n be the number of seeds planted. Then n multiplied by 0.6 must come to 300, so n = 300 ÷ 0.6 = 500. Answer: the grower should plant 500 seeds. The distractors: 180 comes from multiplying instead of dividing, 300 × 0.6 = 180, which answers how many of 300 seeds would germinate; 750 comes from dividing by the probability of not germinating, 300 ÷ 0.4 = 750; 120 comes from multiplying by that same 0.4, 300 × 0.4 = 120.
- (a) 753 — The estimate from 2000 spins is the most reliable, since it comes from the largest sample size, so the best estimate of the probability is 0.251. Over a further 3000 spins, the expected number landing on green is 3000 × 0.251 = 753. Writing 1050 is wrong because 3000 × 0.350 = 1050 uses the estimate from only 20 spins, the LEAST reliable of the three. Writing 870 is wrong because 3000 × 0.290 = 870 uses the estimate from 200 spins rather than the more reliable 2000-spin estimate. Writing 750 is wrong because 3000 × 0.25 = 750 ignores the recorded data completely and simply assumes each of the 4 colours is equally likely. The best estimate is 753 expected green spins.
- (b) 50% — The total number of customers who bought a cake is 54 + 21 = 75, combining both hot-drink and non-hot-drink customers. As a percentage of all 150 customers, this is (75 ÷ 150) × 100 = 50%. Choosing 36% comes from only counting the hot-drink customers who bought a cake, (54 ÷ 150) × 100 = 36%, and forgetting the 21 non-hot-drink customers who also bought a cake. Choosing 14% comes from only counting the non-hot-drink customers who bought a cake, (21 ÷ 150) × 100 = 14%, and forgetting the 54 hot-drink customers who also bought a cake. Choosing 60% comes from dividing by the hot-drink total of 90 instead of the grand total of 150, (54 ÷ 90) × 100 = 60%.
- (a) 50 — To find the number of shots needed for an expected 12 hits, divide the number of hits wanted by the probability of a hit: 12 ÷ 0.24 = 50. Multiplying the number of hits by the probability instead of dividing gives 12 × 0.24 = 2.88, which rounds to 3 shots. Rounding 0.24 to 0.25 before dividing gives 12 ÷ 0.25 = 48. Using the probability of missing, 1 − 0.24 = 0.76, instead of the probability of hitting, gives 12 ÷ 0.76 = 15.79, which rounds to 16.
- (c) 80 — Since 180 calls are 0.75 of all the technical support calls, the technical support total is 180 ÷ 0.75 = 240. The billing calls make up the rest of the 320 calls, so 320 − 240 = 80. Choosing 240 comes from stopping after finding the technical support total and forgetting the question asks for the billing calls, which are the rest. Choosing 185 comes from multiplying 180 × 0.75 = 135 instead of dividing, then working out 320 − 135 = 185. Choosing 140 comes from using 180 directly as the whole technical support total, ignoring the probability altogether, then working out 320 − 180 = 140.
- (a) 195 — The relative frequency from the trial is 52 ÷ 80 = 0.65, and the expected number of point-up landings in 300 drops is 0.65 × 300 = 195. Giving 52 as the answer reuses the original count from the 80-drop trial without scaling it up to 300 drops at all. Misreading 52 out of 80 as 52% and finding 52% of 300 gives 156. Finding the expected number of point-DOWN landings instead of point-up, using the relative frequency 28 ÷ 80 = 0.35, gives 0.35 × 300 = 105.
- (d) 0.80 — Evens is exactly halfway along the scale, at 0.5, and 3/10 written as a decimal is 0.3. A probability 3/10 higher than evens is 0.5 + 0.3 = 0.80. Giving 0.30 as the answer converts the increase but never adds it to the value of evens. Adding the increase to 1, the 'certain' end of the scale, instead of to evens gives 1 + 0.3 = 1.30, which cannot be a probability. Writing 3/10 as 0.03 instead of 0.3, a place-value slip, gives 0.5 + 0.03 = 0.53.
- (b) 3/10 — Method: on a tree diagram, follow the path that matches the description and multiply the probabilities written along it; with nothing put back, the second set of branches is worked out from the counters that are left. Working: 3 of the 5 counters are yellow, so the first branch of the path is 3/5. A yellow counter has been kept out, so 4 counters remain and both green counters are still there, making the second branch 2/4. Multiplying along the path gives 6/20. Answer: the probability is 3/10. The distractors: 6/25 comes from using 2/5 on the second branch, which is the tree for a counter that is put back; 3/20 comes from taking one off the green count as well as off the total, using 1/4 on the second branch; 3/5 comes from reading the first branch only and never multiplying along the path.
- (a) 2/3 — Method: 'in A or in B' means every score that belongs to at least one of the two sets; a score that belongs to both is still only one outcome, so it is listed once. Working: the even scores are 2, 4 and 6; the scores greater than 4 are 5 and 6. Listing the scores that appear in either set gives 2, 4, 5 and 6, with 6 written once. That is 4 of the 6 faces, or 4/6. Answer: the probability is 2/3. The distractors: 5/6 comes from adding the sizes of the two sets, 3 + 2, so that the score 6 is counted in both and appears twice; 1/2 comes from using the even scores alone; 1/6 comes from giving the probability that the score is in both sets, which is the single score 6, rather than in either of them.
- (c) 0.04 — Method: 'made by machine B and faulty' is the second branch of a tree followed after the first, so multiply the probability of machine B by the probability of a fault given machine B. Working: machine B makes 0.4 of the bolts, and 0.1 of those bolts are faulty, so the probability is 0.4 × 0.1 = 0.04. Answer: the probability is 0.04. The distractors: 0.5 comes from adding 0.4 and 0.1 instead of multiplying, treating two stages of one journey as two separate outcomes; 0.1 gives the fault rate for machine B on its own, as though every bolt in the factory came from machine B, so the 40% share is never used; 0.07 is 0.6 × 0.05 added to 0.4 × 0.1, the probability that a bolt is faulty whichever machine made it, which answers a question about all the production rather than about machine B.
Build your own mix at the worksheet builder.