Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (c) 0.37 — Method: pool the two runs into one combined set of results, then find the relative frequency of red across all of the spins together. Working: total reds = 16 + 21 = 37. Total spins = 40 + 60 = 100. Relative frequency = 37 ÷ 100 = 0.37. Answer: 0.37. Watch out: writing down 0.40 uses only the first run, 16 ÷ 40, and throws away the extra evidence from the second 60 spins. Writing down 0.35 uses only the second run, 21 ÷ 60, and throws away the first run instead. And writing down 0.375 averages the two runs' separate rates, (0.40 + 0.35) ÷ 2, which treats a run of 40 spins and a run of 60 spins as equally weighted, when pooling the actual counts gives the larger run its fair share of influence.
- (a) 50 — To find the number of shots needed for an expected 12 hits, divide the number of hits wanted by the probability of a hit: 12 ÷ 0.24 = 50. Multiplying the number of hits by the probability instead of dividing gives 12 × 0.24 = 2.88, which rounds to 3 shots. Rounding 0.24 to 0.25 before dividing gives 12 ÷ 0.25 = 48. Using the probability of missing, 1 − 0.24 = 0.76, instead of the probability of hitting, gives 12 ÷ 0.76 = 15.79, which rounds to 16.
- (c) No — 7/30 is the relative frequency; theory stays 1/6. — The theoretical probability of rolling a 6 on an ordinary dice is fixed at 1/6, worked out from the number of equally likely outcomes, and does not change however the dice is actually rolled. The relative frequency from this trial is 7/30, found from what happened in these particular 30 rolls. Since 7/30 and 1/6 are different numbers, the correct statement is 'No — 7/30 is the relative frequency; theory stays 1/6.' Assuming the two values must always match because they describe the same event gives 'Yes — relative frequency always equals theory.' Believing that an observed result redefines the theoretical probability gives 'Yes — the theoretical probability has now become 7/30.' Refusing to work out either value at all gives 'Neither can be found — 30 rolls is too few to tell', which ignores that both numbers CAN be calculated from the information given.
- (c) 80 — Since 180 calls are 0.75 of all the technical support calls, the technical support total is 180 ÷ 0.75 = 240. The billing calls make up the rest of the 320 calls, so 320 − 240 = 80. Choosing 240 comes from stopping after finding the technical support total and forgetting the question asks for the billing calls, which are the rest. Choosing 185 comes from multiplying 180 × 0.75 = 135 instead of dividing, then working out 320 − 135 = 185. Choosing 140 comes from using 180 directly as the whole technical support total, ignoring the probability altogether, then working out 320 − 180 = 140.
- (d) 136 — 15% of 160 = 0.15 × 160 = 24 patients reported side effects, so 160 − 24 = 136 did not. Stopping after finding the number who reported side effects, 24, answers the wrong question — it is not the number who did NOT report them. Misreading '15%' as a raw count of 15 patients, rather than a percentage, gives 160 − 15 = 145. Subtracting 15% of 160 twice, 160 − 24 − 24 = 112, double-counts the side-effect group.
- (b) 50% — The total number of customers who bought a cake is 54 + 21 = 75, combining both hot-drink and non-hot-drink customers. As a percentage of all 150 customers, this is (75 ÷ 150) × 100 = 50%. Choosing 36% comes from only counting the hot-drink customers who bought a cake, (54 ÷ 150) × 100 = 36%, and forgetting the 21 non-hot-drink customers who also bought a cake. Choosing 14% comes from only counting the non-hot-drink customers who bought a cake, (21 ÷ 150) × 100 = 14%, and forgetting the 54 hot-drink customers who also bought a cake. Choosing 60% comes from dividing by the hot-drink total of 90 instead of the grand total of 150, (54 ÷ 90) × 100 = 60%.
- (b) 0.0309 — Method: P(both defective | at least one defective) = P(both defective) ÷ P(at least one defective). Find each using independence: P(both) = 0.06², P(at least one) = 1 − P(neither) = 1 − 0.94². Working: P(both) = 0.06² = 0.0036. P(neither) = 0.94² = 0.8836, so P(at least one) = 1 − 0.8836 = 0.1164. P(both | at least one) = 0.0036 ÷ 0.1164 = 0.0309 (3 s.f.). Answer: 0.0309. Watch out: leaving the answer as 0.0036 gives P(both defective) itself, not the probability once you already know at least one is defective — you still need to divide by P(at least one defective). Giving 0.0600 answers with the single-component defect rate, ignoring the condition altogether. And 0.5000 assumes that 'at least one' makes the outcomes 'exactly one defective' and 'both defective' equally likely, which is not how these probabilities combine.
- (d) 1/20 — Method: add the counts on the faulty end branches, divide by the total number of items in the experiment, then cancel. Working: the faulty items number 15 + 5 = 20, and 400 items were checked, so the probability is 20/400. Dividing the top and the bottom by 20 gives 1/20. Answer: the probability is 1/20. The distractors: 3/50 is 15/250 and comes from dividing machine A's faults by machine A's output, which is that machine's own fault rate rather than the probability for the whole batch; 1/30 is 5/150 and does the same on machine B's branch; 19/20 is 380/400 and gives the probability that the item picked is not faulty.
- (b) 0.55 — Method: it is easier to find the probability that Ffion wins NEITHER stage, then subtract that from 1. Working: P(lose stage 1) = 1 − 0.4 = 0.6, and P(lose stage 2) = 1 − 0.25 = 0.75. P(neither) = 0.6 × 0.75 = 0.45. P(at least one) = 1 − 0.45 = 0.55. Answer: 0.55. Watch out: adding the two win probabilities, 0.4 + 0.25 = 0.65, treats winning both as impossible and overcounts — that is not how independent probabilities combine. Multiplying the two win probabilities, 0.4 × 0.25 = 0.1, gives the probability of winning BOTH stages, not at least one. And stopping at 0.45, the probability of winning neither stage, forgets the final step of subtracting from 1.
- (a) 0.48 — There are two ways to score exactly one throw: scoring on the first and missing the second, 0.6 × 0.4 = 0.24, or missing the first and scoring the second, 0.4 × 0.6 = 0.24. Adding these gives 0.24 + 0.24 = 0.48. Choosing 0.24 comes from working out only one of the two paths and forgetting the other one also gives exactly one score. Choosing 0.36 comes from working out the probability of scoring BOTH throws, 0.6 × 0.6 = 0.36, instead of exactly one. Choosing 0.84 comes from working out the probability of scoring AT LEAST one throw, 1 − 0.4 × 0.4 = 0.84, instead of exactly one.
- (a) 1200 — Method: take the estimate from the larger sample, because an unbiased relative frequency tends towards the true probability as the sample grows, then multiply by the number of bulbs made in a week. Working: Inspector B tested 500 bulbs, far more than Inspector A's 40, so use B's relative frequency: 30 ÷ 500 = 0.06. A week's production is 4000 × 5 = 20000 bulbs. The expected number of faulty bulbs is 20000 × 0.06 = 1200. Answer: about 1200 faulty bulbs a week. The distractors: 2000 uses Inspector A's estimate, 4 ÷ 40 = 0.1, giving 20000 × 0.1 = 2000, and so rests on a sample of only 40 bulbs; 1600 comes from averaging the two estimates of 0.1 and 0.06 to get 0.08, and 20000 × 0.08 = 1600, which gives the small sample equal weight with the large one; 240 uses the right estimate but stops at a single day, 4000 × 0.06 = 240.
- (c) 11/20 — 'Red or white' combines two mutually exclusive events, so add their probabilities: 3/10 = 6/20 and 1/4 = 5/20, giving 6/20 + 5/20 = 11/20. Multiplying the two probabilities instead of adding them, 3/10 × 1/4, gives 3/40, which would be the probability of red and white together, not red or white — and a bead can't be both colours. Subtracting the sum from 1, 1 − 11/20 = 9/20, gives the probability of the bead being black instead of red or white. Converting 1/4 as 4/20 instead of 5/20 (dividing 20 by 4 but forgetting to scale the numerator) gives 6/20 + 4/20 = 1/2.
- (d) 0.80 — Evens is exactly halfway along the scale, at 0.5, and 3/10 written as a decimal is 0.3. A probability 3/10 higher than evens is 0.5 + 0.3 = 0.80. Giving 0.30 as the answer converts the increase but never adds it to the value of evens. Adding the increase to 1, the 'certain' end of the scale, instead of to evens gives 1 + 0.3 = 1.30, which cannot be a probability. Writing 3/10 as 0.03 instead of 0.3, a place-value slip, gives 0.5 + 0.03 = 0.53.
- (a) 43/70 — There are 140 − 85 = 55 Zone B households, and 55 − 21 = 34 of them recycle glass. In total, 52 + 34 = 86 households recycle glass, out of 140: 86/140 = 43/70. Writing 13/35 is wrong because 52/140 simplifies to 13/35, and 52 only counts Zone A, leaving out the 34 Zone B recyclers. Writing 17/70 is wrong because 34/140 simplifies to 17/70, and 34 only counts Zone B, leaving out the 52 Zone A recyclers. Writing 73/140 is wrong because it adds the 52 Zone A recyclers to the 21 Zone B households that do NOT recycle, mixing up two different groups instead of adding the two recycling groups. The probability is 43/70.
- (b) 8,100 — First find the total number of alerts sent in the month: 1,500 × 30 = 45,000. Then apply the probability of a 'STOP' reply: 45,000 × 0.18 = 8,100. Stopping after finding only one day's expected replies, 1,500 × 0.18 = 270, forgets to scale up to the whole month. Multiplying the number of days by the probability instead of by the daily total of alerts gives 30 × 0.18 = 5.4, which rounds to 5. Shifting the decimal point in the probability, using 0.018 instead of 0.18, gives 45,000 × 0.018 = 810.
Build your own mix at the worksheet builder.