MathsUKwww.geekhero.co.uk
- (c) £3.10 — Aisha's tickets cost 8 × 50p = £4.00. Her expected winnings are (8/400) × £45 = £0.90, since she holds 8 of the 400 tickets. Her expected loss is the cost minus the expected winnings: £4.00 − £0.90 = £3.10. Writing £4.00 is wrong because it is only the cost of her tickets, with no account taken of the expected winnings she might get back. Writing £0.90 is wrong because that is her expected WINNINGS, not her loss — the cost has not been subtracted. Writing £3.89 is wrong because it uses 1 ticket instead of her actual 8 tickets when working out the expected winnings: (1/400) × £45 = £0.1125, giving £4.00 − £0.11 = £3.89. Aisha should expect to lose £3.10.
- (a) 43/70 — There are 140 − 85 = 55 Zone B households, and 55 − 21 = 34 of them recycle glass. In total, 52 + 34 = 86 households recycle glass, out of 140: 86/140 = 43/70. Writing 13/35 is wrong because 52/140 simplifies to 13/35, and 52 only counts Zone A, leaving out the 34 Zone B recyclers. Writing 17/70 is wrong because 34/140 simplifies to 17/70, and 34 only counts Zone B, leaving out the 52 Zone A recyclers. Writing 73/140 is wrong because it adds the 52 Zone A recyclers to the 21 Zone B households that do NOT recycle, mixing up two different groups instead of adding the two recycling groups. The probability is 43/70.
- (c) 102 — Method: turn the past record into a relative frequency, then use it as an estimate of the probability of rain and multiply by the number of days being predicted for. Working: relative frequency of rain = 70 ÷ 250 = 0.28. Expected rainy days in 365 days = 365 × 0.28 = 102.2, which rounds to about 102 days. Answer: about 102 days. Watch out: writing down 48 swaps which number is the sample and which is the target, working out 70 ÷ 365 × 250 instead of 70 ÷ 250 × 365. Writing down 70 just repeats the original count of rainy days without scaling it up to the new, longer period at all. And writing down 110 comes from rounding the relative frequency to 0.3 before multiplying, 365 × 0.3 = 109.5, when 70 ÷ 250 is exactly 0.28 and needs no rounding at all.
- (a) 1276 — Method: an unbiased relative frequency tends towards the theoretical probability as the number of trials increases, so use the record resting on the most trials, then multiply by the number of new trials. Working: the three records rest on 50, 200 and 1000 drops, so the most reliable is the one after 1000 drops, namely 0.638, and the run is indeed settling as the trials increase. The expected number of point up landings in 2000 further drops is 2000 × 0.638 = 1276. Answer: about 1276 times. The distractors: 1440 uses the earliest record, which rests on only 50 drops, giving 2000 × 0.720 = 1440; 1330 uses the middle record, treating 200 drops as a safe compromise when 1000 drops is better still, giving 2000 × 0.665 = 1330; 1348 comes from averaging the three records, since 0.720 + 0.665 + 0.638 = 2.023 and 2.023 ÷ 3 = 0.674, then 2000 × 0.674 = 1348, which gives the 50 drop record the same weight as the 1000 drop record.
- (c) 325 — Method: first find the relative frequency of NOT landing on red from the 200 spins, then scale that up to 500 spins. Working: non-red results = 50 + 80 = 130, out of 200 spins, so P(not red) = 130 ÷ 200 = 0.65. Expected non-red results in 500 spins = 500 × 0.65 = 325. Answer: 325. Watch out: writing down 175 finds the expected number of RED results instead, 70 ÷ 200 × 500 = 175, answering the opposite of what was asked. Writing down 250 assumes landing red or not landing red must be a fair 50-50 split, but the spinner is biased and the actual results do not split evenly. And writing down 130 stops after finding how many of the 200 spins were non-red and forgets to scale that figure up to the 500 spins asked for.
- (b) 8,100 — First find the total number of alerts sent in the month: 1,500 × 30 = 45,000. Then apply the probability of a 'STOP' reply: 45,000 × 0.18 = 8,100. Stopping after finding only one day's expected replies, 1,500 × 0.18 = 270, forgets to scale up to the whole month. Multiplying the number of days by the probability instead of by the daily total of alerts gives 30 × 0.18 = 5.4, which rounds to 5. Shifting the decimal point in the probability, using 0.018 instead of 0.18, gives 45,000 × 0.018 = 810.
- (c) 1/10 — On the adult branch, 210 − 189 = 21 appointments were missed. There are 300 − 210 = 90 child appointments, and 90 − 81 = 9 of those were missed. In total, 21 + 9 = 30 appointments were missed, out of 300: 30/300 = 1/10. Writing 7/100 is wrong because 21/300 simplifies to 7/100, and 21 only counts the adult branch, leaving out the 9 missed child appointments. Writing 3/100 is wrong because 9/300 simplifies to 3/100, and 9 only counts the child branch, leaving out the 21 missed adult appointments. Writing 1/9 is wrong because it divides the 30 missed appointments by the 270 that were attended (300 − 30) instead of by the whole 300 booked. The probability is 1/10.
- (b) £13.50 — The total cost of Nadia's 25 tickets is 25 × £1.50 = £37.50. The expected number of winning tickets is 25 × 0.12 = 3, so the expected prize money is 3 × £8 = £24.00. Nadia's expected loss is the cost minus the expected prize money: £37.50 − £24.00 = £13.50. A candidate who answers £24.00 has given the expected prize money and mistaken it for the loss. A candidate who answers £37.50 has given the total cost of the tickets, forgetting to subtract the expected prize money. A candidate who answers £34.50 has subtracted the expected number of wins, 3, from the cost instead of first converting it to prize money by multiplying by £8.
- (d) 0.80 — Evens is exactly halfway along the scale, at 0.5, and 3/10 written as a decimal is 0.3. A probability 3/10 higher than evens is 0.5 + 0.3 = 0.80. Giving 0.30 as the answer converts the increase but never adds it to the value of evens. Adding the increase to 1, the 'certain' end of the scale, instead of to evens gives 1 + 0.3 = 1.30, which cannot be a probability. Writing 3/10 as 0.03 instead of 0.3, a place-value slip, gives 0.5 + 0.03 = 0.53.
- (a) 952 — 68% = 0.68. The relative frequency from the survey applies to the new group of 1400 shoppers, so the expected number is 0.68 × 1400 = 952. Working out 1 − 0.68 = 0.32 and applying that instead, 0.32 × 1400 = 448, finds the number who have NOT used a self-checkout, not the number who have. Applying 68% to the original sample size of 250 instead of the new total of 1400 gives 0.68 × 250 = 170. Applying the complement percentage to the original sample size, 0.32 × 250 = 80, compounds both mistakes.
- (b) Organiser favoured — expected pay-out is under £1 — The expected pay-out per game is the prize times the probability of winning: £4 × 1/5 = £0.80. The expected income per game is the £1 entry fee, which the organiser collects regardless of the result. Since £0.80 is less than £1, the game favours the organiser, because the expected pay-out is under £1. The claim that the game favours the player, because the pay-out is over £1, is wrong on both counts — the pay-out is not over £1, and it is the organiser who benefits. The claim that the organiser is favoured because the pay-out is over £1 reaches the right side but the wrong reason: £0.80 is under £1, not over it. The claim that the two expected amounts are equal is also wrong: £0.80 and £1 are different amounts, so the game is not fair to both sides.
- (a) 3,860 — The probability a bulb works correctly is the complement of being defective: 1 − 0.035 = 0.965. Expected number working correctly = 0.965 × 4,000 = 3,860. Using the probability of being defective instead of its complement gives 4,000 × 0.035 = 140, the expected number of DEFECTIVE bulbs, not working ones. Shifting the decimal point in the complement, using 0.0965 instead of 0.965, gives 4,000 × 0.0965 = 386. Assuming every bulb works, ignoring the 0.035 probability altogether, gives the full batch of 4,000.
- (c) 0.37 — Method: pool the two runs into one combined set of results, then find the relative frequency of red across all of the spins together. Working: total reds = 16 + 21 = 37. Total spins = 40 + 60 = 100. Relative frequency = 37 ÷ 100 = 0.37. Answer: 0.37. Watch out: writing down 0.40 uses only the first run, 16 ÷ 40, and throws away the extra evidence from the second 60 spins. Writing down 0.35 uses only the second run, 21 ÷ 60, and throws away the first run instead. And writing down 0.375 averages the two runs' separate rates, (0.40 + 0.35) ÷ 2, which treats a run of 40 spins and a run of 60 spins as equally weighted, when pooling the actual counts gives the larger run its fair share of influence.
- (c) 9/16 — There are 180 students in total and 84 are in Year 11, so Year 10 has 180 − 84 = 96 students. Of those 96, 42 travel by bus, so 96 − 42 = 54 walk. P(Year 10 student walks) = 54/96 = 9/16. Using the whole school of 180 as the denominator instead of just the 96 Year 10 students gives 54/180 = 3/10. Using the bus count, 42, as if it were the number who walk gives 42/96 = 7/16, the wrong branch of the Year 10 row. Working out the probability for Year 11 instead of Year 10 — 46 walkers out of 84 — gives 46/84 = 23/42.
- (b) 38% — Method: the two swimming percentages are quoted inside different age groups, so weight each one by the size of its group and add the two results. Working: the under 18s are 45% of the members and 60% of them swim, giving 0.45 × 60 = 27% of all the members. The members aged 18 or over are 55% of the members and 20% of them swim, giving 0.55 × 20 = 11% of all the members. Adding these gives 38%. Answer: 38% of the members swim each week. The distractors: 80% comes from adding 60% and 20% straight off, treating two rates quoted inside different groups as though they could be added; 40% is the mean of 60% and 20%, which would be right only if the two age groups were the same size, and they are not; 42% comes from pairing each swimming rate with the wrong age group, working out 0.45 × 20 added to 0.55 × 60.