Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) 100 — The sample shows a proportion of 8/60 = 2/15 faulty. Apply that proportion to the new batch of 750: 750 × 2/15 = 100. Flipping the ratio, calculating 8/750 × 60 instead of 8/60 × 750, gives 0.64, which rounds to about 1. Assuming the same number of faulty items applies to the new batch, without scaling for its larger size, just repeats the sample's count of 8. Rounding the proportion 8/60 = 0.1333... down to 0.1 before multiplying gives 750 × 0.1 = 75.
- (d) 3/16 — Method: work out each draw's own probability first, then multiply them together since the two draws are independent. Working: there are 8 tickets in all, 3 of them blue, so P(blue) = 3/8. P(spinner number greater than 2) = 2/4 = 1/2, since 3 and 4 qualify. Multiplying gives 3/8 × 1/2, which comes to 3/16. Answer: 3/16. Watch out: writing down 3/8 stops after the first draw and never brings in the spinner at all. Writing down 1/2 does the opposite, using only the spinner and ignoring the ticket draw. And writing down 5/16 uses 5/8, the probability of a RED ticket, instead of 3/8 for blue — reading the wrong colour off the raffle.
- (b) 0.55 — Method: it is easier to find the probability that Ffion wins NEITHER stage, then subtract that from 1. Working: P(lose stage 1) = 1 − 0.4 = 0.6, and P(lose stage 2) = 1 − 0.25 = 0.75. P(neither) = 0.6 × 0.75 = 0.45. P(at least one) = 1 − 0.45 = 0.55. Answer: 0.55. Watch out: adding the two win probabilities, 0.4 + 0.25 = 0.65, treats winning both as impossible and overcounts — that is not how independent probabilities combine. Multiplying the two win probabilities, 0.4 × 0.25 = 0.1, gives the probability of winning BOTH stages, not at least one. And stopping at 0.45, the probability of winning neither stage, forgets the final step of subtracting from 1.
- (b) 12/19 — Method: turn the percentages into expected frequencies out of 1000, total the faulty pens, then divide supplier Y's faulty pens by that total, because the pen picked is known to be faulty. Working: supplier X provided 700 pens and 2% of them are faulty, which is 14 pens. Supplier Y provided 300 pens and 8% of them are faulty, which is 24 pens. Altogether 38 pens are faulty, so the probability is 24/38, and dividing the numerator and the denominator by 2 gives 12/19. Answer: the probability is 12/19. The distractors: 3/10 is supplier Y's share of the stock, the answer before the faulty information is used at all; 3/125 is 24/1000, the probability that a pen is from supplier Y and faulty, which stops at the joint probability and never divides by the probability of a fault; 4/5 is 8 divided by 2 + 8, comparing the two fault rates as though the suppliers provided equal numbers of pens, so the 70 to 30 split is thrown away.
- (d) 56 — Method: count the trials over the whole period first, then multiply the number of trials by the probability. Working: 4 weeks is 4 × 7 = 28 days, and at 25 trains a day that is 25 × 28 = 700 trains. The expected number of late trains is 700 × 0.08 = 56. Answer: about 56 late trains over the 4 weeks. The distractors: 2 is the expected number for a single day, 25 × 0.08 = 2, with the 28 days never brought in; 14 uses one week instead of four, 25 × 7 × 0.08 = 14; 644 is 700 − 56 and counts the trains expected to be on time.
- (d) 136 — 15% of 160 = 0.15 × 160 = 24 patients reported side effects, so 160 − 24 = 136 did not. Stopping after finding the number who reported side effects, 24, answers the wrong question — it is not the number who did NOT report them. Misreading '15%' as a raw count of 15 patients, rather than a percentage, gives 160 − 15 = 145. Subtracting 15% of 160 twice, 160 − 24 − 24 = 112, double-counts the side-effect group.
- (c) 30 — The numbers less than 4 are 1, 2 and 3, so the probability of that event is 3/6, and the expected count in 90 rolls is 90 × 3/6 = 45. The probability of rolling a 6 is 1/6, and the expected count is 90 × 1/6 = 15. The difference between the two expected counts is 45 − 15 = 30. A candidate who answers 45 has given the expected count for 'less than 4' only, forgetting to subtract the other expected count. A candidate who answers 15 has given the expected count for '6' only. A candidate who answers 36 has used a dice with 5 possible numbers instead of 6, giving 90 × 3/5 = 54 and 90 × 1/5 = 18, a difference of 36.
- (a) 20 — Dice A is fair, so its expected number of sixes is 150 × 1/6 = 25. Dice B has P(6) = 0.3, so its expected number of sixes is 150 × 0.3 = 45. The difference is 45 − 25 = 20. Adding the two expected values instead of subtracting them gives 25 + 45 = 70. Reporting Dice B's expected sixes on their own, without comparing to Dice A, gives 45. Using the fair probability 1/6 for Dice B as well as Dice A ignores the bias altogether, giving 150 × 1/6 = 25 for both dice and a difference of 0.
- (b) 39 — Method: put the counts into a two-way table and fill each missing cell by subtracting along a row or down a column. Working: the number of female members is 150 − 80 = 70. The pool column holds 66 members and 35 of them are male, so the number of female pool users is 66 − 35 = 31. Subtracting along the female row, 70 − 31 = 39 female members use the gym. Answer: 39 female members use the gym. The distractors: 45 comes from subtracting along the male row instead, 80 − 35 = 45, which counts male gym users; 31 is the female pool cell, written down one step before the gym cell; 84 is 150 − 66 and counts every gym user, male and female together.
- (c) 0.37 — Method: pool the two runs into one combined set of results, then find the relative frequency of red across all of the spins together. Working: total reds = 16 + 21 = 37. Total spins = 40 + 60 = 100. Relative frequency = 37 ÷ 100 = 0.37. Answer: 0.37. Watch out: writing down 0.40 uses only the first run, 16 ÷ 40, and throws away the extra evidence from the second 60 spins. Writing down 0.35 uses only the second run, 21 ÷ 60, and throws away the first run instead. And writing down 0.375 averages the two runs' separate rates, (0.40 + 0.35) ÷ 2, which treats a run of 40 spins and a run of 60 spins as equally weighted, when pooling the actual counts gives the larger run its fair share of influence.
- (c) 9/28 — Method: two linked steps. Total everyone whose test is positive, since the person picked is known to be one of them, then divide the positive tests that belong to people with the condition by that total. Working: 45 positive tests come from people who have the condition and 95 come from people who do not, so 140 tests are positive. The people with the condition give 45/140, and dividing the numerator and the denominator by 5 gives 9/28. Answer: the probability is 9/28. The distractors: 9/10 is 45/50, the probability of a positive test given that the person has the condition, which is the condition and the event the wrong way round and is the figure a candidate quotes when the two are confused; 9/200 is 45/1000, dividing by everyone tested rather than by the 140 who tested positive; 1/20 is 50/1000, the probability that a person has the condition before the test result is used at all.
- (a) 753 — The estimate from 2000 spins is the most reliable, since it comes from the largest sample size, so the best estimate of the probability is 0.251. Over a further 3000 spins, the expected number landing on green is 3000 × 0.251 = 753. Writing 1050 is wrong because 3000 × 0.350 = 1050 uses the estimate from only 20 spins, the LEAST reliable of the three. Writing 870 is wrong because 3000 × 0.290 = 870 uses the estimate from 200 spins rather than the more reliable 2000-spin estimate. Writing 750 is wrong because 3000 × 0.25 = 750 ignores the recorded data completely and simply assumes each of the 4 colours is equally likely. The best estimate is 753 expected green spins.
- (b) 37/75 — There are 150 − 84 = 66 men. 84 − 50 = 34 women prefer weight training, and 40 men prefer weight training, so 34 + 40 = 74 people in total prefer weight training, out of 150: 74/150 = 37/75. Writing 4/15 is wrong because it only counts the men who prefer weight training (40/150, simplified), leaving out the 34 women. Writing 17/75 is wrong because it only counts the women who prefer weight training (34/150, simplified), leaving out the 40 men. Writing 37/42 is wrong because it uses the number of women (84) as the denominator instead of the whole gym (150) — 74/84 simplifies to 37/42, but that is not a probability out of the whole group. The probability is 37/75.
- (b) Organiser favoured — expected pay-out is under £1 — The expected pay-out per game is the prize times the probability of winning: £4 × 1/5 = £0.80. The expected income per game is the £1 entry fee, which the organiser collects regardless of the result. Since £0.80 is less than £1, the game favours the organiser, because the expected pay-out is under £1. The claim that the game favours the player, because the pay-out is over £1, is wrong on both counts — the pay-out is not over £1, and it is the organiser who benefits. The claim that the organiser is favoured because the pay-out is over £1 reaches the right side but the wrong reason: £0.80 is under £1, not over it. The claim that the two expected amounts are equal is also wrong: £0.80 and £1 are different amounts, so the game is not fair to both sides.
- (c) 15/23 — Method: find P(rough and delayed) and the overall P(delayed) using the tree, then divide. Working: P(rough and delayed) = 0.2 × 0.75 = 0.15. P(calm and delayed) = 0.8 × 0.1 = 0.08. P(delayed) = 0.15 + 0.08 = 0.23. P(rough | delayed) = 0.15 ÷ 0.23 = 15/23. Answer: 15/23. Watch out: leaving the answer as 0.15 (3/20) gives P(rough and delayed) itself, without dividing by the overall probability that a crossing is delayed. Giving 0.75 (3/4) is the probability you were told to start with — that a crossing is delayed GIVEN the sea is rough — which is the reverse of what's being asked. And 0.2 (1/5) is just the original probability that the sea is rough, before you take the fact that the crossing was delayed into account.
Build your own mix at the worksheet builder.