Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) 12/19 — Method: turn the percentages into expected frequencies out of 1000, total the faulty pens, then divide supplier Y's faulty pens by that total, because the pen picked is known to be faulty. Working: supplier X provided 700 pens and 2% of them are faulty, which is 14 pens. Supplier Y provided 300 pens and 8% of them are faulty, which is 24 pens. Altogether 38 pens are faulty, so the probability is 24/38, and dividing the numerator and the denominator by 2 gives 12/19. Answer: the probability is 12/19. The distractors: 3/10 is supplier Y's share of the stock, the answer before the faulty information is used at all; 3/125 is 24/1000, the probability that a pen is from supplier Y and faulty, which stops at the joint probability and never divides by the probability of a fault; 4/5 is 8 divided by 2 + 8, comparing the two fault rates as though the suppliers provided equal numbers of pens, so the 70 to 30 split is thrown away.
- (d) 12/25 — The group holds 40 of the 250 tickets, so for any one prize the probability the group wins it is 40/250 = 4/25. There are 3 prizes and the group has the same chance at each one, so the expected number won is 3 × 4/25 = 12/25. Writing 4/25 is wrong because it is the chance of winning just ONE prize, without multiplying by the 3 prizes available. Writing 4/75 is wrong because it divides by the 3 prizes instead of multiplying (4/25 ÷ 3 = 4/75), which would mean the group did worse the more prizes were on offer. Writing 64/15625 is wrong because it multiplies the single-prize probability by itself three times, (4/25)³, as though all three prizes had to be won together, instead of adding up the expected number across the three separate prizes. The expected number of prizes won by the group is 12/25.
- (b) The relative frequency is settling near 0.5 — Method: turn each result into a relative frequency before comparing them, because it is the relative frequency, and not the difference between the two counts, that tends towards the theoretical probability. Working: after 10 flips the relative frequency of a head is 7 ÷ 10 = 0.7, which is a long way from 0.5. After 1000 flips it is 528 ÷ 1000 = 0.528, which is much closer to 0.5. Meanwhile the gap between the two counts has grown rather than shrunk: it was 7 − 3 = 4 after 10 flips and is 528 − 472 = 56 after 1000 flips. Answer: the relative frequency is settling near 0.5, which is what an unbiased experiment does as the sample grows. The distractors: saying the counts are levelling out is the usual form of this idea and the figures contradict it, since the gap went from 4 to 56; saying the coin is biased treats 28 extra heads in 1000 flips as proof, when 0.528 sits close to 0.5 and a fair coin gives results like this often; saying the next flip is more likely to be a tail is the gambler's fallacy, since each flip stays at 1/2 whatever came before.
- (a) 1200 — Method: take the estimate from the larger sample, because an unbiased relative frequency tends towards the true probability as the sample grows, then multiply by the number of bulbs made in a week. Working: Inspector B tested 500 bulbs, far more than Inspector A's 40, so use B's relative frequency: 30 ÷ 500 = 0.06. A week's production is 4000 × 5 = 20000 bulbs. The expected number of faulty bulbs is 20000 × 0.06 = 1200. Answer: about 1200 faulty bulbs a week. The distractors: 2000 uses Inspector A's estimate, 4 ÷ 40 = 0.1, giving 20000 × 0.1 = 2000, and so rests on a sample of only 40 bulbs; 1600 comes from averaging the two estimates of 0.1 and 0.06 to get 0.08, and 20000 × 0.08 = 1600, which gives the small sample equal weight with the large one; 240 uses the right estimate but stops at a single day, 4000 × 0.06 = 240.
- (b) 0.0309 — Method: P(both defective | at least one defective) = P(both defective) ÷ P(at least one defective). Find each using independence: P(both) = 0.06², P(at least one) = 1 − P(neither) = 1 − 0.94². Working: P(both) = 0.06² = 0.0036. P(neither) = 0.94² = 0.8836, so P(at least one) = 1 − 0.8836 = 0.1164. P(both | at least one) = 0.0036 ÷ 0.1164 = 0.0309 (3 s.f.). Answer: 0.0309. Watch out: leaving the answer as 0.0036 gives P(both defective) itself, not the probability once you already know at least one is defective — you still need to divide by P(at least one defective). Giving 0.0600 answers with the single-component defect rate, ignoring the condition altogether. And 0.5000 assumes that 'at least one' makes the outcomes 'exactly one defective' and 'both defective' equally likely, which is not how these probabilities combine.
- (c) 30 — The numbers less than 4 are 1, 2 and 3, so the probability of that event is 3/6, and the expected count in 90 rolls is 90 × 3/6 = 45. The probability of rolling a 6 is 1/6, and the expected count is 90 × 1/6 = 15. The difference between the two expected counts is 45 − 15 = 30. A candidate who answers 45 has given the expected count for 'less than 4' only, forgetting to subtract the other expected count. A candidate who answers 15 has given the expected count for '6' only. A candidate who answers 36 has used a dice with 5 possible numbers instead of 6, giving 90 × 3/5 = 54 and 90 × 1/5 = 18, a difference of 36.
- (d) 136 — 15% of 160 = 0.15 × 160 = 24 patients reported side effects, so 160 − 24 = 136 did not. Stopping after finding the number who reported side effects, 24, answers the wrong question — it is not the number who did NOT report them. Misreading '15%' as a raw count of 15 patients, rather than a percentage, gives 160 − 15 = 145. Subtracting 15% of 160 twice, 160 − 24 − 24 = 112, double-counts the side-effect group.
- (c) 80 — Since 180 calls are 0.75 of all the technical support calls, the technical support total is 180 ÷ 0.75 = 240. The billing calls make up the rest of the 320 calls, so 320 − 240 = 80. Choosing 240 comes from stopping after finding the technical support total and forgetting the question asks for the billing calls, which are the rest. Choosing 185 comes from multiplying 180 × 0.75 = 135 instead of dividing, then working out 320 − 135 = 185. Choosing 140 comes from using 180 directly as the whole technical support total, ignoring the probability altogether, then working out 320 − 180 = 140.
- (d) 56 — Method: count the trials over the whole period first, then multiply the number of trials by the probability. Working: 4 weeks is 4 × 7 = 28 days, and at 25 trains a day that is 25 × 28 = 700 trains. The expected number of late trains is 700 × 0.08 = 56. Answer: about 56 late trains over the 4 weeks. The distractors: 2 is the expected number for a single day, 25 × 0.08 = 2, with the 28 days never brought in; 14 uses one week instead of four, 25 × 7 × 0.08 = 14; 644 is 700 − 56 and counts the trains expected to be on time.
- (a) 3,860 — The probability a bulb works correctly is the complement of being defective: 1 − 0.035 = 0.965. Expected number working correctly = 0.965 × 4,000 = 3,860. Using the probability of being defective instead of its complement gives 4,000 × 0.035 = 140, the expected number of DEFECTIVE bulbs, not working ones. Shifting the decimal point in the complement, using 0.0965 instead of 0.965, gives 4,000 × 0.0965 = 386. Assuming every bulb works, ignoring the 0.035 probability altogether, gives the full batch of 4,000.
- (a) 43/70 — There are 140 − 85 = 55 Zone B households, and 55 − 21 = 34 of them recycle glass. In total, 52 + 34 = 86 households recycle glass, out of 140: 86/140 = 43/70. Writing 13/35 is wrong because 52/140 simplifies to 13/35, and 52 only counts Zone A, leaving out the 34 Zone B recyclers. Writing 17/70 is wrong because 34/140 simplifies to 17/70, and 34 only counts Zone B, leaving out the 52 Zone A recyclers. Writing 73/140 is wrong because it adds the 52 Zone A recyclers to the 21 Zone B households that do NOT recycle, mixing up two different groups instead of adding the two recycling groups. The probability is 43/70.
- (a) 20 — Dice A is fair, so its expected number of sixes is 150 × 1/6 = 25. Dice B has P(6) = 0.3, so its expected number of sixes is 150 × 0.3 = 45. The difference is 45 − 25 = 20. Adding the two expected values instead of subtracting them gives 25 + 45 = 70. Reporting Dice B's expected sixes on their own, without comparing to Dice A, gives 45. Using the fair probability 1/6 for Dice B as well as Dice A ignores the bias altogether, giving 150 × 1/6 = 25 for both dice and a difference of 0.
- (b) 22.8% — Relative frequency as a percentage is the faulty count divided by the total, then multiplied by 100: 33 ÷ 145 × 100 = 22.76, which rounds to 22.8%. Giving 33.0% as the answer uses the frequency, 33, directly as a percentage without dividing by the total 145 at all. Rounding 22.76 down to 22.7% instead of up applies the wrong rounding direction at the first decimal place. Finding the relative frequency of the bulbs that were NOT faulty first: 145 − 33 = 112, and 112 ÷ 145 × 100 = 77.24, answers the opposite question and rounds to 77.2%.
- (b) 3/5 — The question asks about the girls only, so use the girls' total of 70 as the denominator: 42 out of 70 girls walk, giving 42/70 = 3/5. Choosing 21/65 comes from using the whole survey of 130 pupils as the denominator instead of just the 70 girls, 42/130 = 21/65. Choosing 33/70 comes from using the boys' walking count, 33, over the girls' total of 70, mixing up the two rows of the table. Choosing 2/5 comes from using the number of girls who CYCLE, 70 − 42 = 28, instead of the number who walk, giving 28/70 = 2/5.
- (a) £150 — Each game, the expected payout is 0.1 × £20 = £2, so the fête's expected profit per game is the £3 charged minus the £2 expected payout, £1. Over 150 games, that is 150 × £1 = £150. Writing £300 is wrong because 150 × £2 = £300 is the total expected PAYOUT, not the profit — it has not been subtracted from the entry fees. Writing £450 is wrong because 150 × £3 = £450 is the total money taken in entry fees, without accounting for what is expected to be paid out in prizes. Writing £1 is wrong because that is only the expected profit for ONE game — it has not been scaled up to all 150 games. The fête's expected profit is £150.
Build your own mix at the worksheet builder.