Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) 36/91 — Method: P(both red | same colour) = P(both red) ÷ P(same colour), where P(same colour) = P(both red) + P(both green). Working: P(both red) = 9/20 × 8/19 = 72/380 = 18/95. P(both green) = 11/20 × 10/19 = 110/380 = 11/38. P(same colour) = 18/95 + 11/38 = 36/190 + 55/190 = 91/190. P(both red | same colour) = (36/190) ÷ (91/190) = 36/91. Answer: 36/91. Watch out: stopping at 18/95 gives P(both red) itself, without dividing by the probability that the colours matched at all. Working out 55/91 finds the same-colour probability for green instead of red — check which colour's count you are putting on top. And 9/20 is just the chance the first ball drawn is red, which ignores the second draw and the without-replacement condition completely.
- (c) 500 — Method: the expected number of successes is the number of trials multiplied by the probability, so to find the number of trials, divide the expected number by the probability. Working: let n be the number of seeds planted. Then n multiplied by 0.6 must come to 300, so n = 300 ÷ 0.6 = 500. Answer: the grower should plant 500 seeds. The distractors: 180 comes from multiplying instead of dividing, 300 × 0.6 = 180, which answers how many of 300 seeds would germinate; 750 comes from dividing by the probability of not germinating, 300 ÷ 0.4 = 750; 120 comes from multiplying by that same 0.4, 300 × 0.4 = 120.
- (b) 41/160 — In total, 27 + 14 = 41 of the 160 employees cycle to work, so the probability is 41/160 (41 and 160 share no common factor, so this is already in its simplest form). Writing 27/160 is wrong because it only counts the full-time cyclists and leaves out the 14 part-time cyclists. Writing 41/90 is wrong because it uses the full-time total (90) as the denominator instead of the whole survey (160). Writing 1/5 is wrong because it only uses the part-time branch, simplifying 14/70 to 1/5 and ignoring the full-time cyclists completely. The probability is 41/160.
- (c) 30 — The numbers less than 4 are 1, 2 and 3, so the probability of that event is 3/6, and the expected count in 90 rolls is 90 × 3/6 = 45. The probability of rolling a 6 is 1/6, and the expected count is 90 × 1/6 = 15. The difference between the two expected counts is 45 − 15 = 30. A candidate who answers 45 has given the expected count for 'less than 4' only, forgetting to subtract the other expected count. A candidate who answers 15 has given the expected count for '6' only. A candidate who answers 36 has used a dice with 5 possible numbers instead of 6, giving 90 × 3/5 = 54 and 90 × 1/5 = 18, a difference of 36.
- (c) 102 — Method: turn the past record into a relative frequency, then use it as an estimate of the probability of rain and multiply by the number of days being predicted for. Working: relative frequency of rain = 70 ÷ 250 = 0.28. Expected rainy days in 365 days = 365 × 0.28 = 102.2, which rounds to about 102 days. Answer: about 102 days. Watch out: writing down 48 swaps which number is the sample and which is the target, working out 70 ÷ 365 × 250 instead of 70 ÷ 250 × 365. Writing down 70 just repeats the original count of rainy days without scaling it up to the new, longer period at all. And writing down 110 comes from rounding the relative frequency to 0.3 before multiplying, 365 × 0.3 = 109.5, when 70 ÷ 250 is exactly 0.28 and needs no rounding at all.
- (a) 1200 — Method: take the estimate from the larger sample, because an unbiased relative frequency tends towards the true probability as the sample grows, then multiply by the number of bulbs made in a week. Working: Inspector B tested 500 bulbs, far more than Inspector A's 40, so use B's relative frequency: 30 ÷ 500 = 0.06. A week's production is 4000 × 5 = 20000 bulbs. The expected number of faulty bulbs is 20000 × 0.06 = 1200. Answer: about 1200 faulty bulbs a week. The distractors: 2000 uses Inspector A's estimate, 4 ÷ 40 = 0.1, giving 20000 × 0.1 = 2000, and so rests on a sample of only 40 bulbs; 1600 comes from averaging the two estimates of 0.1 and 0.06 to get 0.08, and 20000 × 0.08 = 1600, which gives the small sample equal weight with the large one; 240 uses the right estimate but stops at a single day, 4000 × 0.06 = 240.
- (b) £0.30 profit for the stall — The stall keeps the £1.50 entry fee whatever happens, and expects to pay out prize × probability of winning = £6 × 0.2 = £1.20 on average. So its expected profit per game is £1.50 − £1.20 = £0.30. Reporting the expected pay-out of £1.20 itself as the profit forgets that the stall also keeps the entry fee. Assuming the player always wins gives an expected cost of £6 − £1.50 = £4.50, treated as a loss for the stall. Using the probability of NOT winning, 0.8, to find the expected pay-out gives £6 × 0.8 = £4.80, and £1.50 − £4.80 = −£3.30, a £3.30 loss.
- (c) 9/28 — Method: two linked steps. Total everyone whose test is positive, since the person picked is known to be one of them, then divide the positive tests that belong to people with the condition by that total. Working: 45 positive tests come from people who have the condition and 95 come from people who do not, so 140 tests are positive. The people with the condition give 45/140, and dividing the numerator and the denominator by 5 gives 9/28. Answer: the probability is 9/28. The distractors: 9/10 is 45/50, the probability of a positive test given that the person has the condition, which is the condition and the event the wrong way round and is the figure a candidate quotes when the two are confused; 9/200 is 45/1000, dividing by everyone tested rather than by the 140 who tested positive; 1/20 is 50/1000, the probability that a person has the condition before the test result is used at all.
- (a) 1276 — Method: an unbiased relative frequency tends towards the theoretical probability as the number of trials increases, so use the record resting on the most trials, then multiply by the number of new trials. Working: the three records rest on 50, 200 and 1000 drops, so the most reliable is the one after 1000 drops, namely 0.638, and the run is indeed settling as the trials increase. The expected number of point up landings in 2000 further drops is 2000 × 0.638 = 1276. Answer: about 1276 times. The distractors: 1440 uses the earliest record, which rests on only 50 drops, giving 2000 × 0.720 = 1440; 1330 uses the middle record, treating 200 drops as a safe compromise when 1000 drops is better still, giving 2000 × 0.665 = 1330; 1348 comes from averaging the three records, since 0.720 + 0.665 + 0.638 = 2.023 and 2.023 ÷ 3 = 0.674, then 2000 × 0.674 = 1348, which gives the 50 drop record the same weight as the 1000 drop record.
- (b) 70 — Saloon, estate and hatchback are exhaustive, so their probabilities sum to 1: the probability of a hatchback is 1 − 0.28 − 0.37 = 0.35. The number of hatchbacks is 0.35 × 200 = 70. Treating the SUM of the other two probabilities, 0.28 + 0.37 = 0.65, as the probability of a hatchback instead of its complement gives 0.65 × 200 = 130. Multiplying the correct probability, 0.35, by 100 instead of the 200 cars actually surveyed gives 35. Averaging the two given probabilities, (0.28 + 0.37) ÷ 2 = 0.325, instead of subtracting them from 1, and then multiplying by 200 gives 65.
- (a) 0.30 — Red, blue, green and yellow are exhaustive, so all four probabilities sum to 1: 0.24 + 0.16 + x + x = 1, so 2x + 0.40 = 1, giving 2x = 0.60 and x = 0.30. Stopping at 2x = 0.60 without dividing by 2 leaves 0.60, the combined probability of both blue and green together, not the value of x on its own. Sharing the 0.60 across all four colours instead of just the two unknown ones gives 0.60 ÷ 4 = 0.15. Leaving out the 0.16 for yellow gives 2x + 0.24 = 1, so 2x = 0.76 and x = 0.38.
- (b) 4 — With 150 rolls and probability 1/6 for each number, the expected count is 150 ÷ 6 = 25. Comparing each actual count with 25: 1 is 22 (3 below), 2 is 27 (2 above), 3 is 24 (1 below), 4 is 34 (9 above), 5 is 21 (4 below) and 6 is 22 (3 below). Number 4 is furthest above its expected count, so it is the most over-represented. Number 2 is also above its expected count, but by only 2, far less than 4's 9. Number 3's count of 24 is below the expected 25, so it is under-represented, not over. Number 6's count of 22 is also below the expected 25, so it too is under-represented.
- (b) 22.8% — Relative frequency as a percentage is the faulty count divided by the total, then multiplied by 100: 33 ÷ 145 × 100 = 22.76, which rounds to 22.8%. Giving 33.0% as the answer uses the frequency, 33, directly as a percentage without dividing by the total 145 at all. Rounding 22.76 down to 22.7% instead of up applies the wrong rounding direction at the first decimal place. Finding the relative frequency of the bulbs that were NOT faulty first: 145 − 33 = 112, and 112 ÷ 145 × 100 = 77.24, answers the opposite question and rounds to 77.2%.
- (a) 43/70 — There are 140 − 85 = 55 Zone B households, and 55 − 21 = 34 of them recycle glass. In total, 52 + 34 = 86 households recycle glass, out of 140: 86/140 = 43/70. Writing 13/35 is wrong because 52/140 simplifies to 13/35, and 52 only counts Zone A, leaving out the 34 Zone B recyclers. Writing 17/70 is wrong because 34/140 simplifies to 17/70, and 34 only counts Zone B, leaving out the 52 Zone A recyclers. Writing 73/140 is wrong because it adds the 52 Zone A recyclers to the 21 Zone B households that do NOT recycle, mixing up two different groups instead of adding the two recycling groups. The probability is 43/70.
- (c) £3.10 — Aisha's tickets cost 8 × 50p = £4.00. Her expected winnings are (8/400) × £45 = £0.90, since she holds 8 of the 400 tickets. Her expected loss is the cost minus the expected winnings: £4.00 − £0.90 = £3.10. Writing £4.00 is wrong because it is only the cost of her tickets, with no account taken of the expected winnings she might get back. Writing £0.90 is wrong because that is her expected WINNINGS, not her loss — the cost has not been subtracted. Writing £3.89 is wrong because it uses 1 ticket instead of her actual 8 tickets when working out the expected winnings: (1/400) × £45 = £0.1125, giving £4.00 − £0.11 = £3.89. Aisha should expect to lose £3.10.
Build your own mix at the worksheet builder.