Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) 70 — Saloon, estate and hatchback are exhaustive, so their probabilities sum to 1: the probability of a hatchback is 1 − 0.28 − 0.37 = 0.35. The number of hatchbacks is 0.35 × 200 = 70. Treating the SUM of the other two probabilities, 0.28 + 0.37 = 0.65, as the probability of a hatchback instead of its complement gives 0.65 × 200 = 130. Multiplying the correct probability, 0.35, by 100 instead of the 200 cars actually surveyed gives 35. Averaging the two given probabilities, (0.28 + 0.37) ÷ 2 = 0.325, instead of subtracting them from 1, and then multiplying by 200 gives 65.
- (b) £100 — Method: find the expected number of wins, turn that into the expected pay out, then compare it with what the games cost. Working: the expected number of wins is 200 × 0.15 = 30. Each win pays £10, so the expected pay out is 30 × 10 = 300 pounds. Playing 200 times at £2 a go costs 200 × 2 = 400 pounds. The expected loss is 400 − 300 = 100 pounds. Answer: Amir should expect to be about £100 down. The distractors: £300 is the expected winnings on their own, with the cost of playing never taken off; £400 is the total cost of playing, with the winnings never taken off; £700 comes from adding the two totals, 400 + 300 = 700, instead of subtracting one from the other.
- (b) Organiser favoured — expected pay-out is under £1 — The expected pay-out per game is the prize times the probability of winning: £4 × 1/5 = £0.80. The expected income per game is the £1 entry fee, which the organiser collects regardless of the result. Since £0.80 is less than £1, the game favours the organiser, because the expected pay-out is under £1. The claim that the game favours the player, because the pay-out is over £1, is wrong on both counts — the pay-out is not over £1, and it is the organiser who benefits. The claim that the organiser is favoured because the pay-out is over £1 reaches the right side but the wrong reason: £0.80 is under £1, not over it. The claim that the two expected amounts are equal is also wrong: £0.80 and £1 are different amounts, so the game is not fair to both sides.
- (c) 9/16 — Method: two steps. Total the patients who had a flu jab, since the patient picked is known to be one of them, then divide the over 65s who had a jab by that total. Working: 90 patients over 65 and 70 patients aged 65 or under had a jab, so 160 patients had one. The over 65s give 90/160, and dividing the numerator and the denominator by 10 gives 9/16. Answer: the probability is 9/16. The distractors: 7/16 is 70/160, the probability that the patient picked is aged 65 or under, which is the other part of the same restricted group; 3/4 is 90/120, the probability that a patient had a jab given that they are over 65, which is the condition and the event the wrong way round and needs the 120 patients over 65; 9/40 is 90/400, dividing by every patient on the list instead of by the 160 who had a jab.
- (a) 50 — To find the number of shots needed for an expected 12 hits, divide the number of hits wanted by the probability of a hit: 12 ÷ 0.24 = 50. Multiplying the number of hits by the probability instead of dividing gives 12 × 0.24 = 2.88, which rounds to 3 shots. Rounding 0.24 to 0.25 before dividing gives 12 ÷ 0.25 = 48. Using the probability of missing, 1 − 0.24 = 0.76, instead of the probability of hitting, gives 12 ÷ 0.76 = 15.79, which rounds to 16.
- (c) 15/23 — Method: find P(rough and delayed) and the overall P(delayed) using the tree, then divide. Working: P(rough and delayed) = 0.2 × 0.75 = 0.15. P(calm and delayed) = 0.8 × 0.1 = 0.08. P(delayed) = 0.15 + 0.08 = 0.23. P(rough | delayed) = 0.15 ÷ 0.23 = 15/23. Answer: 15/23. Watch out: leaving the answer as 0.15 (3/20) gives P(rough and delayed) itself, without dividing by the overall probability that a crossing is delayed. Giving 0.75 (3/4) is the probability you were told to start with — that a crossing is delayed GIVEN the sea is rough — which is the reverse of what's being asked. And 0.2 (1/5) is just the original probability that the sea is rough, before you take the fact that the crossing was delayed into account.
- (b) 41/160 — In total, 27 + 14 = 41 of the 160 employees cycle to work, so the probability is 41/160 (41 and 160 share no common factor, so this is already in its simplest form). Writing 27/160 is wrong because it only counts the full-time cyclists and leaves out the 14 part-time cyclists. Writing 41/90 is wrong because it uses the full-time total (90) as the denominator instead of the whole survey (160). Writing 1/5 is wrong because it only uses the part-time branch, simplifying 14/70 to 1/5 and ignoring the full-time cyclists completely. The probability is 41/160.
- (a) 1276 — Method: an unbiased relative frequency tends towards the theoretical probability as the number of trials increases, so use the record resting on the most trials, then multiply by the number of new trials. Working: the three records rest on 50, 200 and 1000 drops, so the most reliable is the one after 1000 drops, namely 0.638, and the run is indeed settling as the trials increase. The expected number of point up landings in 2000 further drops is 2000 × 0.638 = 1276. Answer: about 1276 times. The distractors: 1440 uses the earliest record, which rests on only 50 drops, giving 2000 × 0.720 = 1440; 1330 uses the middle record, treating 200 drops as a safe compromise when 1000 drops is better still, giving 2000 × 0.665 = 1330; 1348 comes from averaging the three records, since 0.720 + 0.665 + 0.638 = 2.023 and 2.023 ÷ 3 = 0.674, then 2000 × 0.674 = 1348, which gives the 50 drop record the same weight as the 1000 drop record.
- (a) 753 — The estimate from 2000 spins is the most reliable, since it comes from the largest sample size, so the best estimate of the probability is 0.251. Over a further 3000 spins, the expected number landing on green is 3000 × 0.251 = 753. Writing 1050 is wrong because 3000 × 0.350 = 1050 uses the estimate from only 20 spins, the LEAST reliable of the three. Writing 870 is wrong because 3000 × 0.290 = 870 uses the estimate from 200 spins rather than the more reliable 2000-spin estimate. Writing 750 is wrong because 3000 × 0.25 = 750 ignores the recorded data completely and simply assumes each of the 4 colours is equally likely. The best estimate is 753 expected green spins.
- (c) 500 — Method: the expected number of successes is the number of trials multiplied by the probability, so to find the number of trials, divide the expected number by the probability. Working: let n be the number of seeds planted. Then n multiplied by 0.6 must come to 300, so n = 300 ÷ 0.6 = 500. Answer: the grower should plant 500 seeds. The distractors: 180 comes from multiplying instead of dividing, 300 × 0.6 = 180, which answers how many of 300 seeds would germinate; 750 comes from dividing by the probability of not germinating, 300 ÷ 0.4 = 750; 120 comes from multiplying by that same 0.4, 300 × 0.4 = 120.
- (c) 0.37 — Method: pool the two runs into one combined set of results, then find the relative frequency of red across all of the spins together. Working: total reds = 16 + 21 = 37. Total spins = 40 + 60 = 100. Relative frequency = 37 ÷ 100 = 0.37. Answer: 0.37. Watch out: writing down 0.40 uses only the first run, 16 ÷ 40, and throws away the extra evidence from the second 60 spins. Writing down 0.35 uses only the second run, 21 ÷ 60, and throws away the first run instead. And writing down 0.375 averages the two runs' separate rates, (0.40 + 0.35) ÷ 2, which treats a run of 40 spins and a run of 60 spins as equally weighted, when pooling the actual counts gives the larger run its fair share of influence.
- (b) 38% — Method: the two swimming percentages are quoted inside different age groups, so weight each one by the size of its group and add the two results. Working: the under 18s are 45% of the members and 60% of them swim, giving 0.45 × 60 = 27% of all the members. The members aged 18 or over are 55% of the members and 20% of them swim, giving 0.55 × 20 = 11% of all the members. Adding these gives 38%. Answer: 38% of the members swim each week. The distractors: 80% comes from adding 60% and 20% straight off, treating two rates quoted inside different groups as though they could be added; 40% is the mean of 60% and 20%, which would be right only if the two age groups were the same size, and they are not; 42% comes from pairing each swimming rate with the wrong age group, working out 0.45 × 20 added to 0.55 × 60.
- (b) 39 — Method: put the counts into a two-way table and fill each missing cell by subtracting along a row or down a column. Working: the number of female members is 150 − 80 = 70. The pool column holds 66 members and 35 of them are male, so the number of female pool users is 66 − 35 = 31. Subtracting along the female row, 70 − 31 = 39 female members use the gym. Answer: 39 female members use the gym. The distractors: 45 comes from subtracting along the male row instead, 80 − 35 = 45, which counts male gym users; 31 is the female pool cell, written down one step before the gym cell; 84 is 150 − 66 and counts every gym user, male and female together.
- (c) No — 7/30 is the relative frequency; theory stays 1/6. — The theoretical probability of rolling a 6 on an ordinary dice is fixed at 1/6, worked out from the number of equally likely outcomes, and does not change however the dice is actually rolled. The relative frequency from this trial is 7/30, found from what happened in these particular 30 rolls. Since 7/30 and 1/6 are different numbers, the correct statement is 'No — 7/30 is the relative frequency; theory stays 1/6.' Assuming the two values must always match because they describe the same event gives 'Yes — relative frequency always equals theory.' Believing that an observed result redefines the theoretical probability gives 'Yes — the theoretical probability has now become 7/30.' Refusing to work out either value at all gives 'Neither can be found — 30 rolls is too few to tell', which ignores that both numbers CAN be calculated from the information given.
- (b) £13.50 — The total cost of Nadia's 25 tickets is 25 × £1.50 = £37.50. The expected number of winning tickets is 25 × 0.12 = 3, so the expected prize money is 3 × £8 = £24.00. Nadia's expected loss is the cost minus the expected prize money: £37.50 − £24.00 = £13.50. A candidate who answers £24.00 has given the expected prize money and mistaken it for the loss. A candidate who answers £37.50 has given the total cost of the tickets, forgetting to subtract the expected prize money. A candidate who answers £34.50 has subtracted the expected number of wins, 3, from the cost instead of first converting it to prize money by multiplying by £8.
Build your own mix at the worksheet builder.