Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) 1/12 — Method: list the full possibility space of sandwich-and-drink pairs, then divide the one matching pair by the size of the whole space. Working: there are 3 × 4 = 12 equally likely sandwich-and-drink pairs, and exactly one of them is egg and water. Answer: 1/12. Watch out: writing down 1/7 comes from adding the two counts, 3 + 4 = 7, instead of multiplying them to build the possibility space. Writing down 1/3 uses only the chance of choosing egg out of 3 sandwiches and ignores the drink altogether. And writing down 1/4 uses only the chance of choosing water out of 4 drinks and ignores the sandwich altogether.
- (c) Red — Theoretical probability is 1/3 ≈ 0.333 for each colour. Red's relative frequency is 38/90 ≈ 0.422, above 1/3, so red is over-represented. Blue's relative frequency is 26/90 ≈ 0.289, below 1/3, so blue is under-represented, not over. Green's relative frequency is also 26/90 ≈ 0.289, below 1/3 for the same reason. Since red's relative frequency clearly exceeds 1/3, it is not true that none of the colours are over-represented.
- (a) 6.75% — Finishing, retiring and being disqualified are exhaustive, so the three percentages sum to 100%: 100% − 68.5% − 24.75% = 6.75%. Adding the two given percentages instead of subtracting them from 100% gives 68.5% + 24.75% = 93.25%, the combined probability of finishing or retiring, not of being disqualified. Subtracting only the retiring percentage from 100% and forgetting the finishing percentage gives 100% − 24.75% = 75.25%. Subtracting only the finishing percentage and forgetting the retiring percentage gives 100% − 68.5% = 31.50%.
- (d) 12/25 — The group holds 40 of the 250 tickets, so for any one prize the probability the group wins it is 40/250 = 4/25. There are 3 prizes and the group has the same chance at each one, so the expected number won is 3 × 4/25 = 12/25. Writing 4/25 is wrong because it is the chance of winning just ONE prize, without multiplying by the 3 prizes available. Writing 4/75 is wrong because it divides by the 3 prizes instead of multiplying (4/25 ÷ 3 = 4/75), which would mean the group did worse the more prizes were on offer. Writing 64/15625 is wrong because it multiplies the single-prize probability by itself three times, (4/25)³, as though all three prizes had to be won together, instead of adding up the expected number across the three separate prizes. The expected number of prizes won by the group is 12/25.
- (c) 30 — The numbers less than 4 are 1, 2 and 3, so the probability of that event is 3/6, and the expected count in 90 rolls is 90 × 3/6 = 45. The probability of rolling a 6 is 1/6, and the expected count is 90 × 1/6 = 15. The difference between the two expected counts is 45 − 15 = 30. A candidate who answers 45 has given the expected count for 'less than 4' only, forgetting to subtract the other expected count. A candidate who answers 15 has given the expected count for '6' only. A candidate who answers 36 has used a dice with 5 possible numbers instead of 6, giving 90 × 3/5 = 54 and 90 × 1/5 = 18, a difference of 36.
- (c) 80 — Since 180 calls are 0.75 of all the technical support calls, the technical support total is 180 ÷ 0.75 = 240. The billing calls make up the rest of the 320 calls, so 320 − 240 = 80. Choosing 240 comes from stopping after finding the technical support total and forgetting the question asks for the billing calls, which are the rest. Choosing 185 comes from multiplying 180 × 0.75 = 135 instead of dividing, then working out 320 − 135 = 185. Choosing 140 comes from using 180 directly as the whole technical support total, ignoring the probability altogether, then working out 320 − 180 = 140.
- (d) 0.80 — Evens is exactly halfway along the scale, at 0.5, and 3/10 written as a decimal is 0.3. A probability 3/10 higher than evens is 0.5 + 0.3 = 0.80. Giving 0.30 as the answer converts the increase but never adds it to the value of evens. Adding the increase to 1, the 'certain' end of the scale, instead of to evens gives 1 + 0.3 = 1.30, which cannot be a probability. Writing 3/10 as 0.03 instead of 0.3, a place-value slip, gives 0.5 + 0.03 = 0.53.
- (c) 9/16 — Method: two steps. Total the patients who had a flu jab, since the patient picked is known to be one of them, then divide the over 65s who had a jab by that total. Working: 90 patients over 65 and 70 patients aged 65 or under had a jab, so 160 patients had one. The over 65s give 90/160, and dividing the numerator and the denominator by 10 gives 9/16. Answer: the probability is 9/16. The distractors: 7/16 is 70/160, the probability that the patient picked is aged 65 or under, which is the other part of the same restricted group; 3/4 is 90/120, the probability that a patient had a jab given that they are over 65, which is the condition and the event the wrong way round and needs the 120 patients over 65; 9/40 is 90/400, dividing by every patient on the list instead of by the 160 who had a jab.
- (d) 1/4 — Method: a product is odd only when BOTH factors are odd, so list the ordered pairs where both scores are odd and divide by 36. Working: the odd scores on a dice are 1, 3 and 5, so there are 3 × 3 = 9 ordered pairs where both scores are odd, out of the 36 equally likely pairs, cancelling down to 1/4. Answer: 1/4. Watch out: writing down 3/4 finds the probability that AT LEAST ONE score is odd, 1 minus the probability both are even, which is a different, easier condition to meet than both being odd. Considering only the first dice's score and ignoring the second gives 1/2, since 3 of the first dice's 6 scores are odd — but the product also depends on what the second dice shows. And writing down 1/12 comes from counting only the pairs where the SAME odd number appears twice, (1, 1), (3, 3) and (5, 5), missing pairs like (1, 3) and (5, 1) where the two odd scores differ.
- (b) 50% — The total number of customers who bought a cake is 54 + 21 = 75, combining both hot-drink and non-hot-drink customers. As a percentage of all 150 customers, this is (75 ÷ 150) × 100 = 50%. Choosing 36% comes from only counting the hot-drink customers who bought a cake, (54 ÷ 150) × 100 = 36%, and forgetting the 21 non-hot-drink customers who also bought a cake. Choosing 14% comes from only counting the non-hot-drink customers who bought a cake, (21 ÷ 150) × 100 = 14%, and forgetting the 54 hot-drink customers who also bought a cake. Choosing 60% comes from dividing by the hot-drink total of 90 instead of the grand total of 150, (54 ÷ 90) × 100 = 60%.
- (b) 80 — To find the number of attempts needed, divide the target number of successes by the probability of success: 60 ÷ 0.75 = 80. Writing 45 is wrong because 60 × 0.75 = 45 multiplies instead of dividing — that is the number of successes expected from 60 attempts, not the number of attempts needed for 60 successes. Writing 240 is wrong because 60 ÷ 0.25 = 240 uses 0.25, the probability of MISSING, instead of 0.75, the probability of scoring. Writing 90 is wrong because it comes from misremembering 0.75 as 2/3 and dividing by that instead: 60 ÷ (2/3) = 90. She needs to attempt 80 free throws.
- (b) £100 — Method: find the expected number of wins, turn that into the expected pay out, then compare it with what the games cost. Working: the expected number of wins is 200 × 0.15 = 30. Each win pays £10, so the expected pay out is 30 × 10 = 300 pounds. Playing 200 times at £2 a go costs 200 × 2 = 400 pounds. The expected loss is 400 − 300 = 100 pounds. Answer: Amir should expect to be about £100 down. The distractors: £300 is the expected winnings on their own, with the cost of playing never taken off; £400 is the total cost of playing, with the winnings never taken off; £700 comes from adding the two totals, 400 + 300 = 700, instead of subtracting one from the other.
- (b) 12/19 — Method: turn the percentages into expected frequencies out of 1000, total the faulty pens, then divide supplier Y's faulty pens by that total, because the pen picked is known to be faulty. Working: supplier X provided 700 pens and 2% of them are faulty, which is 14 pens. Supplier Y provided 300 pens and 8% of them are faulty, which is 24 pens. Altogether 38 pens are faulty, so the probability is 24/38, and dividing the numerator and the denominator by 2 gives 12/19. Answer: the probability is 12/19. The distractors: 3/10 is supplier Y's share of the stock, the answer before the faulty information is used at all; 3/125 is 24/1000, the probability that a pen is from supplier Y and faulty, which stops at the joint probability and never divides by the probability of a fault; 4/5 is 8 divided by 2 + 8, comparing the two fault rates as though the suppliers provided equal numbers of pens, so the 70 to 30 split is thrown away.
- (d) 3400 — Combining all three greenhouses gives 200 + 150 + 250 = 600 seeds planted in total, and 172 + 126 + 212 = 510 germinated, so the combined estimate of the germination probability is 510/600 = 0.85. Out of a new batch of 4000 seeds, the expected number to germinate is 4000 × 0.85 = 3400. Writing 3440 is wrong because it uses only Greenhouse 1's rate, 172/200 = 0.86, instead of the combined rate from all three: 4000 × 0.86 = 3440. Writing 3360 is wrong because it uses only Greenhouse 2's rate, 126/150 = 0.84: 4000 × 0.84 = 3360. Writing 510 is wrong because that is the total number that germinated in the ORIGINAL trial, not scaled up to the new batch of 4000 seeds at all. The best estimate is 3400 seeds.
- (c) 15/23 — Method: find P(rough and delayed) and the overall P(delayed) using the tree, then divide. Working: P(rough and delayed) = 0.2 × 0.75 = 0.15. P(calm and delayed) = 0.8 × 0.1 = 0.08. P(delayed) = 0.15 + 0.08 = 0.23. P(rough | delayed) = 0.15 ÷ 0.23 = 15/23. Answer: 15/23. Watch out: leaving the answer as 0.15 (3/20) gives P(rough and delayed) itself, without dividing by the overall probability that a crossing is delayed. Giving 0.75 (3/4) is the probability you were told to start with — that a crossing is delayed GIVEN the sea is rough — which is the reverse of what's being asked. And 0.2 (1/5) is just the original probability that the sea is rough, before you take the fact that the crossing was delayed into account.
Build your own mix at the worksheet builder.