Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) 3/16 — Method: work out each draw's own probability first, then multiply them together since the two draws are independent. Working: there are 8 tickets in all, 3 of them blue, so P(blue) = 3/8. P(spinner number greater than 2) = 2/4 = 1/2, since 3 and 4 qualify. Multiplying gives 3/8 × 1/2, which comes to 3/16. Answer: 3/16. Watch out: writing down 3/8 stops after the first draw and never brings in the spinner at all. Writing down 1/2 does the opposite, using only the spinner and ignoring the ticket draw. And writing down 5/16 uses 5/8, the probability of a RED ticket, instead of 3/8 for blue — reading the wrong colour off the raffle.
- (c) 102 — Method: turn the past record into a relative frequency, then use it as an estimate of the probability of rain and multiply by the number of days being predicted for. Working: relative frequency of rain = 70 ÷ 250 = 0.28. Expected rainy days in 365 days = 365 × 0.28 = 102.2, which rounds to about 102 days. Answer: about 102 days. Watch out: writing down 48 swaps which number is the sample and which is the target, working out 70 ÷ 365 × 250 instead of 70 ÷ 250 × 365. Writing down 70 just repeats the original count of rainy days without scaling it up to the new, longer period at all. And writing down 110 comes from rounding the relative frequency to 0.3 before multiplying, 365 × 0.3 = 109.5, when 70 ÷ 250 is exactly 0.28 and needs no rounding at all.
- (d) 0.80 — Evens is exactly halfway along the scale, at 0.5, and 3/10 written as a decimal is 0.3. A probability 3/10 higher than evens is 0.5 + 0.3 = 0.80. Giving 0.30 as the answer converts the increase but never adds it to the value of evens. Adding the increase to 1, the 'certain' end of the scale, instead of to evens gives 1 + 0.3 = 1.30, which cannot be a probability. Writing 3/10 as 0.03 instead of 0.3, a place-value slip, gives 0.5 + 0.03 = 0.53.
- (b) 22.8% — Relative frequency as a percentage is the faulty count divided by the total, then multiplied by 100: 33 ÷ 145 × 100 = 22.76, which rounds to 22.8%. Giving 33.0% as the answer uses the frequency, 33, directly as a percentage without dividing by the total 145 at all. Rounding 22.76 down to 22.7% instead of up applies the wrong rounding direction at the first decimal place. Finding the relative frequency of the bulbs that were NOT faulty first: 145 − 33 = 112, and 112 ÷ 145 × 100 = 77.24, answers the opposite question and rounds to 77.2%.
- (a) 20 — Dice A is fair, so its expected number of sixes is 150 × 1/6 = 25. Dice B has P(6) = 0.3, so its expected number of sixes is 150 × 0.3 = 45. The difference is 45 − 25 = 20. Adding the two expected values instead of subtracting them gives 25 + 45 = 70. Reporting Dice B's expected sixes on their own, without comparing to Dice A, gives 45. Using the fair probability 1/6 for Dice B as well as Dice A ignores the bias altogether, giving 150 × 1/6 = 25 for both dice and a difference of 0.
- (b) £100 — Over 250 games, the expected total winnings are 250 × (1/5) × £12 = £600, since a player wins on 1 of the 5 equally likely sections. The total cost of playing is 250 × £2 = £500. The players' expected profit is the winnings minus the cost: £600 − £500 = £100. Writing £500 is wrong because that is only the total cost of playing, without any winnings included. Writing £600 is wrong because that is only the total expected winnings, without subtracting what was paid to play. Writing £2,500 is wrong because it assumes a win on every single game (250 × £12 = £3,000) instead of using the 1-in-5 probability, then subtracts the cost: £3,000 − £500 = £2,500. The players' expected profit over the 250 games is £100.
- (c) 500 — Method: the expected number of successes is the number of trials multiplied by the probability, so to find the number of trials, divide the expected number by the probability. Working: let n be the number of seeds planted. Then n multiplied by 0.6 must come to 300, so n = 300 ÷ 0.6 = 500. Answer: the grower should plant 500 seeds. The distractors: 180 comes from multiplying instead of dividing, 300 × 0.6 = 180, which answers how many of 300 seeds would germinate; 750 comes from dividing by the probability of not germinating, 300 ÷ 0.4 = 750; 120 comes from multiplying by that same 0.4, 300 × 0.4 = 120.
- (a) £124.80 — On the cake branch, 150 − 100 = 50 cakes were bought by children. Adding the 54 biscuits bought by children gives 50 + 54 = 104 items sold to children in total, and at £1.20 each that raises 104 × £1.20 = £124.80. Writing £60.00 is wrong because 50 × £1.20 = £60.00 only counts the cake sales to children and leaves out the 54 biscuits. Writing £163.20 is wrong because it uses the ADULT sales instead of children's: 100 cake adults plus 90 − 54 = 36 biscuit adults gives 136 × £1.20 = £163.20. Writing £136.80 is wrong because it finds the cake children's number by subtracting the wrong branch (150 − 90 = 60 instead of 150 − 100 = 50), giving 60 + 54 = 114 items and 114 × £1.20 = £136.80. The total raised from sales to children is £124.80.
- (b) 70 — Saloon, estate and hatchback are exhaustive, so their probabilities sum to 1: the probability of a hatchback is 1 − 0.28 − 0.37 = 0.35. The number of hatchbacks is 0.35 × 200 = 70. Treating the SUM of the other two probabilities, 0.28 + 0.37 = 0.65, as the probability of a hatchback instead of its complement gives 0.65 × 200 = 130. Multiplying the correct probability, 0.35, by 100 instead of the 200 cars actually surveyed gives 35. Averaging the two given probabilities, (0.28 + 0.37) ÷ 2 = 0.325, instead of subtracting them from 1, and then multiplying by 200 gives 65.
- (d) 56 — Method: count the trials over the whole period first, then multiply the number of trials by the probability. Working: 4 weeks is 4 × 7 = 28 days, and at 25 trains a day that is 25 × 28 = 700 trains. The expected number of late trains is 700 × 0.08 = 56. Answer: about 56 late trains over the 4 weeks. The distractors: 2 is the expected number for a single day, 25 × 0.08 = 2, with the 28 days never brought in; 14 uses one week instead of four, 25 × 7 × 0.08 = 14; 644 is 700 − 56 and counts the trains expected to be on time.
- (d) 1/4 — Method: a product is odd only when BOTH factors are odd, so list the ordered pairs where both scores are odd and divide by 36. Working: the odd scores on a dice are 1, 3 and 5, so there are 3 × 3 = 9 ordered pairs where both scores are odd, out of the 36 equally likely pairs, cancelling down to 1/4. Answer: 1/4. Watch out: writing down 3/4 finds the probability that AT LEAST ONE score is odd, 1 minus the probability both are even, which is a different, easier condition to meet than both being odd. Considering only the first dice's score and ignoring the second gives 1/2, since 3 of the first dice's 6 scores are odd — but the product also depends on what the second dice shows. And writing down 1/12 comes from counting only the pairs where the SAME odd number appears twice, (1, 1), (3, 3) and (5, 5), missing pairs like (1, 3) and (5, 1) where the two odd scores differ.
- (d) 136 — 15% of 160 = 0.15 × 160 = 24 patients reported side effects, so 160 − 24 = 136 did not. Stopping after finding the number who reported side effects, 24, answers the wrong question — it is not the number who did NOT report them. Misreading '15%' as a raw count of 15 patients, rather than a percentage, gives 160 − 15 = 145. Subtracting 15% of 160 twice, 160 − 24 − 24 = 112, double-counts the side-effect group.
- (b) 0.225 — The relative frequency of rain is the number of rainy days out of all days recorded: 9 ÷ 40 = 0.225, which is noticeably less than the forecaster's claimed 0.3. Using the number of dry days, 40 − 9 = 31, as the denominator instead of the total of 40 gives 9 ÷ 31 = 0.29 (2 d.p.). Simply reporting the forecaster's claimed value, 0.3, without calculating anything from the data at all, ignores the recorded results completely. Misplacing the decimal point, treating 9 out of 40 as 9%, gives 0.09 instead of 0.225.
- (a) 1276 — Method: an unbiased relative frequency tends towards the theoretical probability as the number of trials increases, so use the record resting on the most trials, then multiply by the number of new trials. Working: the three records rest on 50, 200 and 1000 drops, so the most reliable is the one after 1000 drops, namely 0.638, and the run is indeed settling as the trials increase. The expected number of point up landings in 2000 further drops is 2000 × 0.638 = 1276. Answer: about 1276 times. The distractors: 1440 uses the earliest record, which rests on only 50 drops, giving 2000 × 0.720 = 1440; 1330 uses the middle record, treating 200 drops as a safe compromise when 1000 drops is better still, giving 2000 × 0.665 = 1330; 1348 comes from averaging the three records, since 0.720 + 0.665 + 0.638 = 2.023 and 2.023 ÷ 3 = 0.674, then 2000 × 0.674 = 1348, which gives the 50 drop record the same weight as the 1000 drop record.
- (c) 9/28 — Method: two linked steps. Total everyone whose test is positive, since the person picked is known to be one of them, then divide the positive tests that belong to people with the condition by that total. Working: 45 positive tests come from people who have the condition and 95 come from people who do not, so 140 tests are positive. The people with the condition give 45/140, and dividing the numerator and the denominator by 5 gives 9/28. Answer: the probability is 9/28. The distractors: 9/10 is 45/50, the probability of a positive test given that the person has the condition, which is the condition and the event the wrong way round and is the figure a candidate quotes when the two are confused; 9/200 is 45/1000, dividing by everyone tested rather than by the 140 who tested positive; 1/20 is 50/1000, the probability that a person has the condition before the test result is used at all.
Build your own mix at the worksheet builder.