- (b) 80 — To find the number of attempts needed, divide the target number of successes by the probability of success: 60 ÷ 0.75 = 80. Writing 45 is wrong because 60 × 0.75 = 45 multiplies instead of dividing — that is the number of successes expected from 60 attempts, not the number of attempts needed for 60 successes. Writing 240 is wrong because 60 ÷ 0.25 = 240 uses 0.25, the probability of MISSING, instead of 0.75, the probability of scoring. Writing 90 is wrong because it comes from misremembering 0.75 as 2/3 and dividing by that instead: 60 ÷ (2/3) = 90. She needs to attempt 80 free throws.
- (c) 0.15 — Method: for two independent events, multiply along the branches of the tree to find the probability of both outcomes happening together. Working: P(red and heads) = P(red) × P(heads) = 0.3 × 0.5 = 0.15. Answer: 0.15. Watch out: adding the two probabilities, 0.3 + 0.5 = 0.8, does not give the probability of both — probabilities along one path of a tree are multiplied, not added. Writing down 0.5 ignores the spinner altogether and gives only the coin's probability. And writing down 0.65 is the probability of red OR heads, which is 0.3 + 0.5 − 0.15 = 0.65, a different question from the one asked here.
- (d) 1/4 — Method: a product is odd only when BOTH factors are odd, so list the ordered pairs where both scores are odd and divide by 36. Working: the odd scores on a dice are 1, 3 and 5, so there are 3 × 3 = 9 ordered pairs where both scores are odd, out of the 36 equally likely pairs, cancelling down to 1/4. Answer: 1/4. Watch out: writing down 3/4 finds the probability that AT LEAST ONE score is odd, 1 minus the probability both are even, which is a different, easier condition to meet than both being odd. Considering only the first dice's score and ignoring the second gives 1/2, since 3 of the first dice's 6 scores are odd — but the product also depends on what the second dice shows. And writing down 1/12 comes from counting only the pairs where the SAME odd number appears twice, (1, 1), (3, 3) and (5, 5), missing pairs like (1, 3) and (5, 1) where the two odd scores differ.
- (a) 753 — The estimate from 2000 spins is the most reliable, since it comes from the largest sample size, so the best estimate of the probability is 0.251. Over a further 3000 spins, the expected number landing on green is 3000 × 0.251 = 753. Writing 1050 is wrong because 3000 × 0.350 = 1050 uses the estimate from only 20 spins, the LEAST reliable of the three. Writing 870 is wrong because 3000 × 0.290 = 870 uses the estimate from 200 spins rather than the more reliable 2000-spin estimate. Writing 750 is wrong because 3000 × 0.25 = 750 ignores the recorded data completely and simply assumes each of the 4 colours is equally likely. The best estimate is 753 expected green spins.
- (b) 0.225 — The relative frequency of rain is the number of rainy days out of all days recorded: 9 ÷ 40 = 0.225, which is noticeably less than the forecaster's claimed 0.3. Using the number of dry days, 40 − 9 = 31, as the denominator instead of the total of 40 gives 9 ÷ 31 = 0.29 (2 d.p.). Simply reporting the forecaster's claimed value, 0.3, without calculating anything from the data at all, ignores the recorded results completely. Misplacing the decimal point, treating 9 out of 40 as 9%, gives 0.09 instead of 0.225.
- (b) 22.8% — Relative frequency as a percentage is the faulty count divided by the total, then multiplied by 100: 33 ÷ 145 × 100 = 22.76, which rounds to 22.8%. Giving 33.0% as the answer uses the frequency, 33, directly as a percentage without dividing by the total 145 at all. Rounding 22.76 down to 22.7% instead of up applies the wrong rounding direction at the first decimal place. Finding the relative frequency of the bulbs that were NOT faulty first: 145 − 33 = 112, and 112 ÷ 145 × 100 = 77.24, answers the opposite question and rounds to 77.2%.
- (b) 100 — The sample shows a proportion of 8/60 = 2/15 faulty. Apply that proportion to the new batch of 750: 750 × 2/15 = 100. Flipping the ratio, calculating 8/750 × 60 instead of 8/60 × 750, gives 0.64, which rounds to about 1. Assuming the same number of faulty items applies to the new batch, without scaling for its larger size, just repeats the sample's count of 8. Rounding the proportion 8/60 = 0.1333... down to 0.1 before multiplying gives 750 × 0.1 = 75.
- (a) 20 — Dice A is fair, so its expected number of sixes is 150 × 1/6 = 25. Dice B has P(6) = 0.3, so its expected number of sixes is 150 × 0.3 = 45. The difference is 45 − 25 = 20. Adding the two expected values instead of subtracting them gives 25 + 45 = 70. Reporting Dice B's expected sixes on their own, without comparing to Dice A, gives 45. Using the fair probability 1/6 for Dice B as well as Dice A ignores the bias altogether, giving 150 × 1/6 = 25 for both dice and a difference of 0.
- (c) Noah — 11/32 = 0.34375, above 34%. — Converting 11/32 to a decimal gives 11 ÷ 32 = 0.34375, which is greater than 34% (0.34), so Noah has the better save rate: 'Noah — 11/32 = 0.34375, above 34%.' Comparing the raw numbers 34 and 11 directly, without converting the fraction to the same form, gives 'Elin — 34 is bigger than 11.' Treating a larger denominator as meaning a bigger value, rather than smaller equal shares, gives 'Noah — 32 is a bigger denominator.' Rounding 34.375% to 34% to the nearest whole percent hides the difference and gives 'Equal — both round to 34% to the nearest percent.'
- (b) £100 — Method: find the expected number of wins, turn that into the expected pay out, then compare it with what the games cost. Working: the expected number of wins is 200 × 0.15 = 30. Each win pays £10, so the expected pay out is 30 × 10 = 300 pounds. Playing 200 times at £2 a go costs 200 × 2 = 400 pounds. The expected loss is 400 − 300 = 100 pounds. Answer: Amir should expect to be about £100 down. The distractors: £300 is the expected winnings on their own, with the cost of playing never taken off; £400 is the total cost of playing, with the winnings never taken off; £700 comes from adding the two totals, 400 + 300 = 700, instead of subtracting one from the other.
- (a) 1200 — Method: take the estimate from the larger sample, because an unbiased relative frequency tends towards the true probability as the sample grows, then multiply by the number of bulbs made in a week. Working: Inspector B tested 500 bulbs, far more than Inspector A's 40, so use B's relative frequency: 30 ÷ 500 = 0.06. A week's production is 4000 × 5 = 20000 bulbs. The expected number of faulty bulbs is 20000 × 0.06 = 1200. Answer: about 1200 faulty bulbs a week. The distractors: 2000 uses Inspector A's estimate, 4 ÷ 40 = 0.1, giving 20000 × 0.1 = 2000, and so rests on a sample of only 40 bulbs; 1600 comes from averaging the two estimates of 0.1 and 0.06 to get 0.08, and 20000 × 0.08 = 1600, which gives the small sample equal weight with the large one; 240 uses the right estimate but stops at a single day, 4000 × 0.06 = 240.
- (c) 30 — The numbers less than 4 are 1, 2 and 3, so the probability of that event is 3/6, and the expected count in 90 rolls is 90 × 3/6 = 45. The probability of rolling a 6 is 1/6, and the expected count is 90 × 1/6 = 15. The difference between the two expected counts is 45 − 15 = 30. A candidate who answers 45 has given the expected count for 'less than 4' only, forgetting to subtract the other expected count. A candidate who answers 15 has given the expected count for '6' only. A candidate who answers 36 has used a dice with 5 possible numbers instead of 6, giving 90 × 3/5 = 54 and 90 × 1/5 = 18, a difference of 36.
- (b) 57/100 — Pooling both trials: total heads = 24 + 33 = 57, total flips = 40 + 60 = 100, so the combined relative frequency is 57/100, which is already in its simplest form since 57 and 100 share no common factor. Averaging the two separate relative frequencies instead, (24/40 + 33/60) ÷ 2 = (0.6 + 0.55) ÷ 2 = 0.575 = 23/40, treats the two trials as equally weighted even though Ben made more flips, which is not correct. Using only Leah's data gives 24/40 = 3/5. Using only Ben's data gives 33/60 = 11/20.
- (b) £0.30 profit for the stall — The stall keeps the £1.50 entry fee whatever happens, and expects to pay out prize × probability of winning = £6 × 0.2 = £1.20 on average. So its expected profit per game is £1.50 − £1.20 = £0.30. Reporting the expected pay-out of £1.20 itself as the profit forgets that the stall also keeps the entry fee. Assuming the player always wins gives an expected cost of £6 − £1.50 = £4.50, treated as a loss for the stall. Using the probability of NOT winning, 0.8, to find the expected pay-out gives £6 × 0.8 = £4.80, and £1.50 − £4.80 = −£3.30, a £3.30 loss.
- (c) 102 — Method: turn the past record into a relative frequency, then use it as an estimate of the probability of rain and multiply by the number of days being predicted for. Working: relative frequency of rain = 70 ÷ 250 = 0.28. Expected rainy days in 365 days = 365 × 0.28 = 102.2, which rounds to about 102 days. Answer: about 102 days. Watch out: writing down 48 swaps which number is the sample and which is the target, working out 70 ÷ 365 × 250 instead of 70 ÷ 250 × 365. Writing down 70 just repeats the original count of rainy days without scaling it up to the new, longer period at all. And writing down 110 comes from rounding the relative frequency to 0.3 before multiplying, 365 × 0.3 = 109.5, when 70 ÷ 250 is exactly 0.28 and needs no rounding at all.