Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) 50% — The total number of customers who bought a cake is 54 + 21 = 75, combining both hot-drink and non-hot-drink customers. As a percentage of all 150 customers, this is (75 ÷ 150) × 100 = 50%. Choosing 36% comes from only counting the hot-drink customers who bought a cake, (54 ÷ 150) × 100 = 36%, and forgetting the 21 non-hot-drink customers who also bought a cake. Choosing 14% comes from only counting the non-hot-drink customers who bought a cake, (21 ÷ 150) × 100 = 14%, and forgetting the 54 hot-drink customers who also bought a cake. Choosing 60% comes from dividing by the hot-drink total of 90 instead of the grand total of 150, (54 ÷ 90) × 100 = 60%.
- (b) 70 — Saloon, estate and hatchback are exhaustive, so their probabilities sum to 1: the probability of a hatchback is 1 − 0.28 − 0.37 = 0.35. The number of hatchbacks is 0.35 × 200 = 70. Treating the SUM of the other two probabilities, 0.28 + 0.37 = 0.65, as the probability of a hatchback instead of its complement gives 0.65 × 200 = 130. Multiplying the correct probability, 0.35, by 100 instead of the 200 cars actually surveyed gives 35. Averaging the two given probabilities, (0.28 + 0.37) ÷ 2 = 0.325, instead of subtracting them from 1, and then multiplying by 200 gives 65.
- (b) 100 — The sample shows a proportion of 8/60 = 2/15 faulty. Apply that proportion to the new batch of 750: 750 × 2/15 = 100. Flipping the ratio, calculating 8/750 × 60 instead of 8/60 × 750, gives 0.64, which rounds to about 1. Assuming the same number of faulty items applies to the new batch, without scaling for its larger size, just repeats the sample's count of 8. Rounding the proportion 8/60 = 0.1333... down to 0.1 before multiplying gives 750 × 0.1 = 75.
- (c) 15/23 — Method: find P(rough and delayed) and the overall P(delayed) using the tree, then divide. Working: P(rough and delayed) = 0.2 × 0.75 = 0.15. P(calm and delayed) = 0.8 × 0.1 = 0.08. P(delayed) = 0.15 + 0.08 = 0.23. P(rough | delayed) = 0.15 ÷ 0.23 = 15/23. Answer: 15/23. Watch out: leaving the answer as 0.15 (3/20) gives P(rough and delayed) itself, without dividing by the overall probability that a crossing is delayed. Giving 0.75 (3/4) is the probability you were told to start with — that a crossing is delayed GIVEN the sea is rough — which is the reverse of what's being asked. And 0.2 (1/5) is just the original probability that the sea is rough, before you take the fact that the crossing was delayed into account.
- (b) 3/5 — The question asks about the girls only, so use the girls' total of 70 as the denominator: 42 out of 70 girls walk, giving 42/70 = 3/5. Choosing 21/65 comes from using the whole survey of 130 pupils as the denominator instead of just the 70 girls, 42/130 = 21/65. Choosing 33/70 comes from using the boys' walking count, 33, over the girls' total of 70, mixing up the two rows of the table. Choosing 2/5 comes from using the number of girls who CYCLE, 70 − 42 = 28, instead of the number who walk, giving 28/70 = 2/5.
- (b) 38% — Method: the two swimming percentages are quoted inside different age groups, so weight each one by the size of its group and add the two results. Working: the under 18s are 45% of the members and 60% of them swim, giving 0.45 × 60 = 27% of all the members. The members aged 18 or over are 55% of the members and 20% of them swim, giving 0.55 × 20 = 11% of all the members. Adding these gives 38%. Answer: 38% of the members swim each week. The distractors: 80% comes from adding 60% and 20% straight off, treating two rates quoted inside different groups as though they could be added; 40% is the mean of 60% and 20%, which would be right only if the two age groups were the same size, and they are not; 42% comes from pairing each swimming rate with the wrong age group, working out 0.45 × 20 added to 0.55 × 60.
- (c) 0.15 — Method: for two independent events, multiply along the branches of the tree to find the probability of both outcomes happening together. Working: P(red and heads) = P(red) × P(heads) = 0.3 × 0.5 = 0.15. Answer: 0.15. Watch out: adding the two probabilities, 0.3 + 0.5 = 0.8, does not give the probability of both — probabilities along one path of a tree are multiplied, not added. Writing down 0.5 ignores the spinner altogether and gives only the coin's probability. And writing down 0.65 is the probability of red OR heads, which is 0.3 + 0.5 − 0.15 = 0.65, a different question from the one asked here.
- (b) 3/10 — The number who use at least one app is 90 − 20 = 70. Since 55 + 42 double-counts the overlap, n(X ∩ Y) = 55 + 42 − 70 = 27, so P(both) = 27/90 = 3/10. Forgetting to subtract the 20 who use neither, and using the full 90 as the union, gives 55 + 42 − 90 = 7, so 7/90. Reporting the probability of using X or Y (or both), 70/90 = 7/9, answers a different question about the union, not the overlap. Reporting the probability of using neither app, 20/90 = 2/9, is the complement of the union, not the intersection.
- (a) 1200 — Method: take the estimate from the larger sample, because an unbiased relative frequency tends towards the true probability as the sample grows, then multiply by the number of bulbs made in a week. Working: Inspector B tested 500 bulbs, far more than Inspector A's 40, so use B's relative frequency: 30 ÷ 500 = 0.06. A week's production is 4000 × 5 = 20000 bulbs. The expected number of faulty bulbs is 20000 × 0.06 = 1200. Answer: about 1200 faulty bulbs a week. The distractors: 2000 uses Inspector A's estimate, 4 ÷ 40 = 0.1, giving 20000 × 0.1 = 2000, and so rests on a sample of only 40 bulbs; 1600 comes from averaging the two estimates of 0.1 and 0.06 to get 0.08, and 20000 × 0.08 = 1600, which gives the small sample equal weight with the large one; 240 uses the right estimate but stops at a single day, 4000 × 0.06 = 240.
- (c) 9/16 — There are 180 students in total and 84 are in Year 11, so Year 10 has 180 − 84 = 96 students. Of those 96, 42 travel by bus, so 96 − 42 = 54 walk. P(Year 10 student walks) = 54/96 = 9/16. Using the whole school of 180 as the denominator instead of just the 96 Year 10 students gives 54/180 = 3/10. Using the bus count, 42, as if it were the number who walk gives 42/96 = 7/16, the wrong branch of the Year 10 row. Working out the probability for Year 11 instead of Year 10 — 46 walkers out of 84 — gives 46/84 = 23/42.
- (c) 100 — There are 3 even numbers on a fair dice (2, 4 and 6), so the probability of landing on an even number is 3/6 = 1/2, and 300 × 1/2 = 150. The probability of landing on a six is 1/6, so 300 × 1/6 = 50. The dice is expected to land on an even number 150 − 50 = 100 more times than on a six. Writing 50 is wrong because that is just the expected number of sixes on its own, without comparing it to the expected number of evens. Writing 150 is wrong because that is just the expected number of evens on its own, without subtracting the sixes. Writing 200 is wrong because it adds the two expected frequencies together (150 + 50 = 200) instead of finding the difference between them. The dice is expected to land on an even number 100 more times than on a six.
- (d) 0.468 — The probability that Leo does not wake up before his alarm is 1 − 0.35 = 0.65, and the probability that his sister does not is 1 − 0.28 = 0.72. Since the two events are independent, multiply the complements: 0.65 × 0.72 = 0.468. A candidate who answers 0.63 has added the two given probabilities, 0.35 + 0.28, instead of finding and multiplying the complements. A candidate who answers 0.098 has multiplied the two given probabilities directly, 0.35 × 0.28, without taking complements first. A candidate who answers 0.532 has correctly reached 0.468 but then subtracted it from 1 again by mistake.
- (b) £0.30 profit for the stall — The stall keeps the £1.50 entry fee whatever happens, and expects to pay out prize × probability of winning = £6 × 0.2 = £1.20 on average. So its expected profit per game is £1.50 − £1.20 = £0.30. Reporting the expected pay-out of £1.20 itself as the profit forgets that the stall also keeps the entry fee. Assuming the player always wins gives an expected cost of £6 − £1.50 = £4.50, treated as a loss for the stall. Using the probability of NOT winning, 0.8, to find the expected pay-out gives £6 × 0.8 = £4.80, and £1.50 − £4.80 = −£3.30, a £3.30 loss.
- (c) 325 — Method: first find the relative frequency of NOT landing on red from the 200 spins, then scale that up to 500 spins. Working: non-red results = 50 + 80 = 130, out of 200 spins, so P(not red) = 130 ÷ 200 = 0.65. Expected non-red results in 500 spins = 500 × 0.65 = 325. Answer: 325. Watch out: writing down 175 finds the expected number of RED results instead, 70 ÷ 200 × 500 = 175, answering the opposite of what was asked. Writing down 250 assumes landing red or not landing red must be a fair 50-50 split, but the spinner is biased and the actual results do not split evenly. And writing down 130 stops after finding how many of the 200 spins were non-red and forgets to scale that figure up to the 500 spins asked for.
- (d) 136 — 15% of 160 = 0.15 × 160 = 24 patients reported side effects, so 160 − 24 = 136 did not. Stopping after finding the number who reported side effects, 24, answers the wrong question — it is not the number who did NOT report them. Misreading '15%' as a raw count of 15 patients, rather than a percentage, gives 160 − 15 = 145. Subtracting 15% of 160 twice, 160 − 24 − 24 = 112, double-counts the side-effect group.
Build your own mix at the worksheet builder.