Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) 56 — Method: count the trials over the whole period first, then multiply the number of trials by the probability. Working: 4 weeks is 4 × 7 = 28 days, and at 25 trains a day that is 25 × 28 = 700 trains. The expected number of late trains is 700 × 0.08 = 56. Answer: about 56 late trains over the 4 weeks. The distractors: 2 is the expected number for a single day, 25 × 0.08 = 2, with the 28 days never brought in; 14 uses one week instead of four, 25 × 7 × 0.08 = 14; 644 is 700 − 56 and counts the trains expected to be on time.
- (d) No, because 3/8 + 5/12 + 1/6 = 23/24 — Using a common denominator of 24: 3/8 = 9/24, 5/12 = 10/24 and 1/6 = 4/24. Adding these numerators gives 9 + 10 + 4 = 23, so the three probabilities sum to 23/24, which is less than 1 — Zara is not correct. Adding the original numerators (3 + 5 + 1 = 9) over a denominator of 12 instead of converting each fraction properly gives 9/12 = 3/4, still less than 1 but the wrong fraction. Converting 1/6 to 5/24 instead of 4/24 (using the wrong scaling) makes the total 9/24 + 10/24 + 5/24 = 24/24 = 1, wrongly suggesting the probabilities are valid. Judging validity from the fact that each individual fraction lies between 0 and 1 ignores that an exhaustive set must sum to exactly 1, not merely contain valid individual values.
- (c) 0.37 — Method: pool the two runs into one combined set of results, then find the relative frequency of red across all of the spins together. Working: total reds = 16 + 21 = 37. Total spins = 40 + 60 = 100. Relative frequency = 37 ÷ 100 = 0.37. Answer: 0.37. Watch out: writing down 0.40 uses only the first run, 16 ÷ 40, and throws away the extra evidence from the second 60 spins. Writing down 0.35 uses only the second run, 21 ÷ 60, and throws away the first run instead. And writing down 0.375 averages the two runs' separate rates, (0.40 + 0.35) ÷ 2, which treats a run of 40 spins and a run of 60 spins as equally weighted, when pooling the actual counts gives the larger run its fair share of influence.
- (b) 37/75 — There are 150 − 84 = 66 men. 84 − 50 = 34 women prefer weight training, and 40 men prefer weight training, so 34 + 40 = 74 people in total prefer weight training, out of 150: 74/150 = 37/75. Writing 4/15 is wrong because it only counts the men who prefer weight training (40/150, simplified), leaving out the 34 women. Writing 17/75 is wrong because it only counts the women who prefer weight training (34/150, simplified), leaving out the 40 men. Writing 37/42 is wrong because it uses the number of women (84) as the denominator instead of the whole gym (150) — 74/84 simplifies to 37/42, but that is not a probability out of the whole group. The probability is 37/75.
- (b) 0.0309 — Method: P(both defective | at least one defective) = P(both defective) ÷ P(at least one defective). Find each using independence: P(both) = 0.06², P(at least one) = 1 − P(neither) = 1 − 0.94². Working: P(both) = 0.06² = 0.0036. P(neither) = 0.94² = 0.8836, so P(at least one) = 1 − 0.8836 = 0.1164. P(both | at least one) = 0.0036 ÷ 0.1164 = 0.0309 (3 s.f.). Answer: 0.0309. Watch out: leaving the answer as 0.0036 gives P(both defective) itself, not the probability once you already know at least one is defective — you still need to divide by P(at least one defective). Giving 0.0600 answers with the single-component defect rate, ignoring the condition altogether. And 0.5000 assumes that 'at least one' makes the outcomes 'exactly one defective' and 'both defective' equally likely, which is not how these probabilities combine.
- (d) 12/25 — The group holds 40 of the 250 tickets, so for any one prize the probability the group wins it is 40/250 = 4/25. There are 3 prizes and the group has the same chance at each one, so the expected number won is 3 × 4/25 = 12/25. Writing 4/25 is wrong because it is the chance of winning just ONE prize, without multiplying by the 3 prizes available. Writing 4/75 is wrong because it divides by the 3 prizes instead of multiplying (4/25 ÷ 3 = 4/75), which would mean the group did worse the more prizes were on offer. Writing 64/15625 is wrong because it multiplies the single-prize probability by itself three times, (4/25)³, as though all three prizes had to be won together, instead of adding up the expected number across the three separate prizes. The expected number of prizes won by the group is 12/25.
- (b) 57/100 — Pooling both trials: total heads = 24 + 33 = 57, total flips = 40 + 60 = 100, so the combined relative frequency is 57/100, which is already in its simplest form since 57 and 100 share no common factor. Averaging the two separate relative frequencies instead, (24/40 + 33/60) ÷ 2 = (0.6 + 0.55) ÷ 2 = 0.575 = 23/40, treats the two trials as equally weighted even though Ben made more flips, which is not correct. Using only Leah's data gives 24/40 = 3/5. Using only Ben's data gives 33/60 = 11/20.
- (b) Organiser favoured — expected pay-out is under £1 — The expected pay-out per game is the prize times the probability of winning: £4 × 1/5 = £0.80. The expected income per game is the £1 entry fee, which the organiser collects regardless of the result. Since £0.80 is less than £1, the game favours the organiser, because the expected pay-out is under £1. The claim that the game favours the player, because the pay-out is over £1, is wrong on both counts — the pay-out is not over £1, and it is the organiser who benefits. The claim that the organiser is favoured because the pay-out is over £1 reaches the right side but the wrong reason: £0.80 is under £1, not over it. The claim that the two expected amounts are equal is also wrong: £0.80 and £1 are different amounts, so the game is not fair to both sides.
- (a) 70 — Method: two linked steps. Find the expected number of billing calls first, then take the 35% of those, because the 35% is quoted for billing calls only. Working: 40% of 500 is 200 billing calls. 35% of 200 is 70 calls. Answer: you would expect 70 calls. The distractors: 200 stops after the first step and gives the billing calls, forgetting that only some of them are dealt with quickly; 175 is 35% of 500, applying the quick response rate to every call the centre takes rather than to the billing calls only; 375 comes from adding 40% and 35% to get 75% and taking 75% of 500, which treats two stages of one journey as separate outcomes to be added.
- (b) 0.55 — Method: it is easier to find the probability that Ffion wins NEITHER stage, then subtract that from 1. Working: P(lose stage 1) = 1 − 0.4 = 0.6, and P(lose stage 2) = 1 − 0.25 = 0.75. P(neither) = 0.6 × 0.75 = 0.45. P(at least one) = 1 − 0.45 = 0.55. Answer: 0.55. Watch out: adding the two win probabilities, 0.4 + 0.25 = 0.65, treats winning both as impossible and overcounts — that is not how independent probabilities combine. Multiplying the two win probabilities, 0.4 × 0.25 = 0.1, gives the probability of winning BOTH stages, not at least one. And stopping at 0.45, the probability of winning neither stage, forgets the final step of subtracting from 1.
- (c) 102 — Method: turn the past record into a relative frequency, then use it as an estimate of the probability of rain and multiply by the number of days being predicted for. Working: relative frequency of rain = 70 ÷ 250 = 0.28. Expected rainy days in 365 days = 365 × 0.28 = 102.2, which rounds to about 102 days. Answer: about 102 days. Watch out: writing down 48 swaps which number is the sample and which is the target, working out 70 ÷ 365 × 250 instead of 70 ÷ 250 × 365. Writing down 70 just repeats the original count of rainy days without scaling it up to the new, longer period at all. And writing down 110 comes from rounding the relative frequency to 0.3 before multiplying, 365 × 0.3 = 109.5, when 70 ÷ 250 is exactly 0.28 and needs no rounding at all.
- (d) 1/4 — Method: a product is odd only when BOTH factors are odd, so list the ordered pairs where both scores are odd and divide by 36. Working: the odd scores on a dice are 1, 3 and 5, so there are 3 × 3 = 9 ordered pairs where both scores are odd, out of the 36 equally likely pairs, cancelling down to 1/4. Answer: 1/4. Watch out: writing down 3/4 finds the probability that AT LEAST ONE score is odd, 1 minus the probability both are even, which is a different, easier condition to meet than both being odd. Considering only the first dice's score and ignoring the second gives 1/2, since 3 of the first dice's 6 scores are odd — but the product also depends on what the second dice shows. And writing down 1/12 comes from counting only the pairs where the SAME odd number appears twice, (1, 1), (3, 3) and (5, 5), missing pairs like (1, 3) and (5, 1) where the two odd scores differ.
- (d) 1/20 — Method: add the counts on the faulty end branches, divide by the total number of items in the experiment, then cancel. Working: the faulty items number 15 + 5 = 20, and 400 items were checked, so the probability is 20/400. Dividing the top and the bottom by 20 gives 1/20. Answer: the probability is 1/20. The distractors: 3/50 is 15/250 and comes from dividing machine A's faults by machine A's output, which is that machine's own fault rate rather than the probability for the whole batch; 1/30 is 5/150 and does the same on machine B's branch; 19/20 is 380/400 and gives the probability that the item picked is not faulty.
- (c) 15/23 — Method: find P(rough and delayed) and the overall P(delayed) using the tree, then divide. Working: P(rough and delayed) = 0.2 × 0.75 = 0.15. P(calm and delayed) = 0.8 × 0.1 = 0.08. P(delayed) = 0.15 + 0.08 = 0.23. P(rough | delayed) = 0.15 ÷ 0.23 = 15/23. Answer: 15/23. Watch out: leaving the answer as 0.15 (3/20) gives P(rough and delayed) itself, without dividing by the overall probability that a crossing is delayed. Giving 0.75 (3/4) is the probability you were told to start with — that a crossing is delayed GIVEN the sea is rough — which is the reverse of what's being asked. And 0.2 (1/5) is just the original probability that the sea is rough, before you take the fact that the crossing was delayed into account.
- (b) 22.8% — Relative frequency as a percentage is the faulty count divided by the total, then multiplied by 100: 33 ÷ 145 × 100 = 22.76, which rounds to 22.8%. Giving 33.0% as the answer uses the frequency, 33, directly as a percentage without dividing by the total 145 at all. Rounding 22.76 down to 22.7% instead of up applies the wrong rounding direction at the first decimal place. Finding the relative frequency of the bulbs that were NOT faulty first: 145 − 33 = 112, and 112 ÷ 145 × 100 = 77.24, answers the opposite question and rounds to 77.2%.
Build your own mix at the worksheet builder.