- (d) 3400 — Combining all three greenhouses gives 200 + 150 + 250 = 600 seeds planted in total, and 172 + 126 + 212 = 510 germinated, so the combined estimate of the germination probability is 510/600 = 0.85. Out of a new batch of 4000 seeds, the expected number to germinate is 4000 × 0.85 = 3400. Writing 3440 is wrong because it uses only Greenhouse 1's rate, 172/200 = 0.86, instead of the combined rate from all three: 4000 × 0.86 = 3440. Writing 3360 is wrong because it uses only Greenhouse 2's rate, 126/150 = 0.84: 4000 × 0.84 = 3360. Writing 510 is wrong because that is the total number that germinated in the ORIGINAL trial, not scaled up to the new batch of 4000 seeds at all. The best estimate is 3400 seeds.
- (d) 56 — Method: count the trials over the whole period first, then multiply the number of trials by the probability. Working: 4 weeks is 4 × 7 = 28 days, and at 25 trains a day that is 25 × 28 = 700 trains. The expected number of late trains is 700 × 0.08 = 56. Answer: about 56 late trains over the 4 weeks. The distractors: 2 is the expected number for a single day, 25 × 0.08 = 2, with the 28 days never brought in; 14 uses one week instead of four, 25 × 7 × 0.08 = 14; 644 is 700 − 56 and counts the trains expected to be on time.
- (a) 3,860 — The probability a bulb works correctly is the complement of being defective: 1 − 0.035 = 0.965. Expected number working correctly = 0.965 × 4,000 = 3,860. Using the probability of being defective instead of its complement gives 4,000 × 0.035 = 140, the expected number of DEFECTIVE bulbs, not working ones. Shifting the decimal point in the complement, using 0.0965 instead of 0.965, gives 4,000 × 0.0965 = 386. Assuming every bulb works, ignoring the 0.035 probability altogether, gives the full batch of 4,000.
- (b) The relative frequency is settling near 0.5 — Method: turn each result into a relative frequency before comparing them, because it is the relative frequency, and not the difference between the two counts, that tends towards the theoretical probability. Working: after 10 flips the relative frequency of a head is 7 ÷ 10 = 0.7, which is a long way from 0.5. After 1000 flips it is 528 ÷ 1000 = 0.528, which is much closer to 0.5. Meanwhile the gap between the two counts has grown rather than shrunk: it was 7 − 3 = 4 after 10 flips and is 528 − 472 = 56 after 1000 flips. Answer: the relative frequency is settling near 0.5, which is what an unbiased experiment does as the sample grows. The distractors: saying the counts are levelling out is the usual form of this idea and the figures contradict it, since the gap went from 4 to 56; saying the coin is biased treats 28 extra heads in 1000 flips as proof, when 0.528 sits close to 0.5 and a fair coin gives results like this often; saying the next flip is more likely to be a tail is the gambler's fallacy, since each flip stays at 1/2 whatever came before.
- (d) 36/91 — Method: P(both red | same colour) = P(both red) ÷ P(same colour), where P(same colour) = P(both red) + P(both green). Working: P(both red) = 9/20 × 8/19 = 72/380 = 18/95. P(both green) = 11/20 × 10/19 = 110/380 = 11/38. P(same colour) = 18/95 + 11/38 = 36/190 + 55/190 = 91/190. P(both red | same colour) = (36/190) ÷ (91/190) = 36/91. Answer: 36/91. Watch out: stopping at 18/95 gives P(both red) itself, without dividing by the probability that the colours matched at all. Working out 55/91 finds the same-colour probability for green instead of red — check which colour's count you are putting on top. And 9/20 is just the chance the first ball drawn is red, which ignores the second draw and the without-replacement condition completely.
- (c) 500 — Method: the expected number of successes is the number of trials multiplied by the probability, so to find the number of trials, divide the expected number by the probability. Working: let n be the number of seeds planted. Then n multiplied by 0.6 must come to 300, so n = 300 ÷ 0.6 = 500. Answer: the grower should plant 500 seeds. The distractors: 180 comes from multiplying instead of dividing, 300 × 0.6 = 180, which answers how many of 300 seeds would germinate; 750 comes from dividing by the probability of not germinating, 300 ÷ 0.4 = 750; 120 comes from multiplying by that same 0.4, 300 × 0.4 = 120.
- (b) 100 — The sample shows a proportion of 8/60 = 2/15 faulty. Apply that proportion to the new batch of 750: 750 × 2/15 = 100. Flipping the ratio, calculating 8/750 × 60 instead of 8/60 × 750, gives 0.64, which rounds to about 1. Assuming the same number of faulty items applies to the new batch, without scaling for its larger size, just repeats the sample's count of 8. Rounding the proportion 8/60 = 0.1333... down to 0.1 before multiplying gives 750 × 0.1 = 75.
- (c) 0.37 — Method: pool the two runs into one combined set of results, then find the relative frequency of red across all of the spins together. Working: total reds = 16 + 21 = 37. Total spins = 40 + 60 = 100. Relative frequency = 37 ÷ 100 = 0.37. Answer: 0.37. Watch out: writing down 0.40 uses only the first run, 16 ÷ 40, and throws away the extra evidence from the second 60 spins. Writing down 0.35 uses only the second run, 21 ÷ 60, and throws away the first run instead. And writing down 0.375 averages the two runs' separate rates, (0.40 + 0.35) ÷ 2, which treats a run of 40 spins and a run of 60 spins as equally weighted, when pooling the actual counts gives the larger run its fair share of influence.
- (a) 50 — To find the number of shots needed for an expected 12 hits, divide the number of hits wanted by the probability of a hit: 12 ÷ 0.24 = 50. Multiplying the number of hits by the probability instead of dividing gives 12 × 0.24 = 2.88, which rounds to 3 shots. Rounding 0.24 to 0.25 before dividing gives 12 ÷ 0.25 = 48. Using the probability of missing, 1 − 0.24 = 0.76, instead of the probability of hitting, gives 12 ÷ 0.76 = 15.79, which rounds to 16.
- (b) 500 — Method: when a dice is known to be fair, the theoretical probability is the best thing to work from, and the more trials there are the closer the results tend to it. Working: for a fair dice the probability of a six is 1/6, so the expected number of sixes in 3000 rolls is 3000 × 1 ÷ 6 = 500. The class experiment gave a relative frequency of 14/60, but 60 trials is far too few to overturn a known theoretical value, and the school's 3000 rolls will tend towards 1/6 in any case. Answer: about 500 sixes. The distractors: 700 comes from using the class relative frequency instead of the theory, 3000 × 14 ÷ 60 = 700; 600 comes from splitting the difference between the two, since 1/6 is about 0.167 and 14/60 is about 0.233, whose mean is 0.2, and 3000 × 0.2 = 600; 2500 uses 5/6 instead of 1/6 and counts the rolls expected not to be a six.
- (a) 70 — Method: two linked steps. Find the expected number of billing calls first, then take the 35% of those, because the 35% is quoted for billing calls only. Working: 40% of 500 is 200 billing calls. 35% of 200 is 70 calls. Answer: you would expect 70 calls. The distractors: 200 stops after the first step and gives the billing calls, forgetting that only some of them are dealt with quickly; 175 is 35% of 500, applying the quick response rate to every call the centre takes rather than to the billing calls only; 375 comes from adding 40% and 35% to get 75% and taking 75% of 500, which treats two stages of one journey as separate outcomes to be added.
- (b) 50% — The total number of customers who bought a cake is 54 + 21 = 75, combining both hot-drink and non-hot-drink customers. As a percentage of all 150 customers, this is (75 ÷ 150) × 100 = 50%. Choosing 36% comes from only counting the hot-drink customers who bought a cake, (54 ÷ 150) × 100 = 36%, and forgetting the 21 non-hot-drink customers who also bought a cake. Choosing 14% comes from only counting the non-hot-drink customers who bought a cake, (21 ÷ 150) × 100 = 14%, and forgetting the 54 hot-drink customers who also bought a cake. Choosing 60% comes from dividing by the hot-drink total of 90 instead of the grand total of 150, (54 ÷ 90) × 100 = 60%.
- (c) Noah — 11/32 = 0.34375, above 34%. — Converting 11/32 to a decimal gives 11 ÷ 32 = 0.34375, which is greater than 34% (0.34), so Noah has the better save rate: 'Noah — 11/32 = 0.34375, above 34%.' Comparing the raw numbers 34 and 11 directly, without converting the fraction to the same form, gives 'Elin — 34 is bigger than 11.' Treating a larger denominator as meaning a bigger value, rather than smaller equal shares, gives 'Noah — 32 is a bigger denominator.' Rounding 34.375% to 34% to the nearest whole percent hides the difference and gives 'Equal — both round to 34% to the nearest percent.'
- (a) 1276 — Method: an unbiased relative frequency tends towards the theoretical probability as the number of trials increases, so use the record resting on the most trials, then multiply by the number of new trials. Working: the three records rest on 50, 200 and 1000 drops, so the most reliable is the one after 1000 drops, namely 0.638, and the run is indeed settling as the trials increase. The expected number of point up landings in 2000 further drops is 2000 × 0.638 = 1276. Answer: about 1276 times. The distractors: 1440 uses the earliest record, which rests on only 50 drops, giving 2000 × 0.720 = 1440; 1330 uses the middle record, treating 200 drops as a safe compromise when 1000 drops is better still, giving 2000 × 0.665 = 1330; 1348 comes from averaging the three records, since 0.720 + 0.665 + 0.638 = 2.023 and 2.023 ÷ 3 = 0.674, then 2000 × 0.674 = 1348, which gives the 50 drop record the same weight as the 1000 drop record.
- (c) 15/23 — Method: find P(rough and delayed) and the overall P(delayed) using the tree, then divide. Working: P(rough and delayed) = 0.2 × 0.75 = 0.15. P(calm and delayed) = 0.8 × 0.1 = 0.08. P(delayed) = 0.15 + 0.08 = 0.23. P(rough | delayed) = 0.15 ÷ 0.23 = 15/23. Answer: 15/23. Watch out: leaving the answer as 0.15 (3/20) gives P(rough and delayed) itself, without dividing by the overall probability that a crossing is delayed. Giving 0.75 (3/4) is the probability you were told to start with — that a crossing is delayed GIVEN the sea is rough — which is the reverse of what's being asked. And 0.2 (1/5) is just the original probability that the sea is rough, before you take the fact that the crossing was delayed into account.
Build your own mix at the worksheet builder.