Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (a) 3,860 — The probability a bulb works correctly is the complement of being defective: 1 − 0.035 = 0.965. Expected number working correctly = 0.965 × 4,000 = 3,860. Using the probability of being defective instead of its complement gives 4,000 × 0.035 = 140, the expected number of DEFECTIVE bulbs, not working ones. Shifting the decimal point in the complement, using 0.0965 instead of 0.965, gives 4,000 × 0.0965 = 386. Assuming every bulb works, ignoring the 0.035 probability altogether, gives the full batch of 4,000.
- (c) 0.37 — Method: pool the two runs into one combined set of results, then find the relative frequency of red across all of the spins together. Working: total reds = 16 + 21 = 37. Total spins = 40 + 60 = 100. Relative frequency = 37 ÷ 100 = 0.37. Answer: 0.37. Watch out: writing down 0.40 uses only the first run, 16 ÷ 40, and throws away the extra evidence from the second 60 spins. Writing down 0.35 uses only the second run, 21 ÷ 60, and throws away the first run instead. And writing down 0.375 averages the two runs' separate rates, (0.40 + 0.35) ÷ 2, which treats a run of 40 spins and a run of 60 spins as equally weighted, when pooling the actual counts gives the larger run its fair share of influence.
- (b) 8,100 — First find the total number of alerts sent in the month: 1,500 × 30 = 45,000. Then apply the probability of a 'STOP' reply: 45,000 × 0.18 = 8,100. Stopping after finding only one day's expected replies, 1,500 × 0.18 = 270, forgets to scale up to the whole month. Multiplying the number of days by the probability instead of by the daily total of alerts gives 30 × 0.18 = 5.4, which rounds to 5. Shifting the decimal point in the probability, using 0.018 instead of 0.18, gives 45,000 × 0.018 = 810.
- (b) 57/100 — Pooling both trials: total heads = 24 + 33 = 57, total flips = 40 + 60 = 100, so the combined relative frequency is 57/100, which is already in its simplest form since 57 and 100 share no common factor. Averaging the two separate relative frequencies instead, (24/40 + 33/60) ÷ 2 = (0.6 + 0.55) ÷ 2 = 0.575 = 23/40, treats the two trials as equally weighted even though Ben made more flips, which is not correct. Using only Leah's data gives 24/40 = 3/5. Using only Ben's data gives 33/60 = 11/20.
- (c) 9/28 — Method: two linked steps. Total everyone whose test is positive, since the person picked is known to be one of them, then divide the positive tests that belong to people with the condition by that total. Working: 45 positive tests come from people who have the condition and 95 come from people who do not, so 140 tests are positive. The people with the condition give 45/140, and dividing the numerator and the denominator by 5 gives 9/28. Answer: the probability is 9/28. The distractors: 9/10 is 45/50, the probability of a positive test given that the person has the condition, which is the condition and the event the wrong way round and is the figure a candidate quotes when the two are confused; 9/200 is 45/1000, dividing by everyone tested rather than by the 140 who tested positive; 1/20 is 50/1000, the probability that a person has the condition before the test result is used at all.
- (c) 15/23 — Method: find P(rough and delayed) and the overall P(delayed) using the tree, then divide. Working: P(rough and delayed) = 0.2 × 0.75 = 0.15. P(calm and delayed) = 0.8 × 0.1 = 0.08. P(delayed) = 0.15 + 0.08 = 0.23. P(rough | delayed) = 0.15 ÷ 0.23 = 15/23. Answer: 15/23. Watch out: leaving the answer as 0.15 (3/20) gives P(rough and delayed) itself, without dividing by the overall probability that a crossing is delayed. Giving 0.75 (3/4) is the probability you were told to start with — that a crossing is delayed GIVEN the sea is rough — which is the reverse of what's being asked. And 0.2 (1/5) is just the original probability that the sea is rough, before you take the fact that the crossing was delayed into account.
- (a) 952 — 68% = 0.68. The relative frequency from the survey applies to the new group of 1400 shoppers, so the expected number is 0.68 × 1400 = 952. Working out 1 − 0.68 = 0.32 and applying that instead, 0.32 × 1400 = 448, finds the number who have NOT used a self-checkout, not the number who have. Applying 68% to the original sample size of 250 instead of the new total of 1400 gives 0.68 × 250 = 170. Applying the complement percentage to the original sample size, 0.32 × 250 = 80, compounds both mistakes.
- (b) £0.30 profit for the stall — The stall keeps the £1.50 entry fee whatever happens, and expects to pay out prize × probability of winning = £6 × 0.2 = £1.20 on average. So its expected profit per game is £1.50 − £1.20 = £0.30. Reporting the expected pay-out of £1.20 itself as the profit forgets that the stall also keeps the entry fee. Assuming the player always wins gives an expected cost of £6 − £1.50 = £4.50, treated as a loss for the stall. Using the probability of NOT winning, 0.8, to find the expected pay-out gives £6 × 0.8 = £4.80, and £1.50 − £4.80 = −£3.30, a £3.30 loss.
- (c) 100 — There are 3 even numbers on a fair dice (2, 4 and 6), so the probability of landing on an even number is 3/6 = 1/2, and 300 × 1/2 = 150. The probability of landing on a six is 1/6, so 300 × 1/6 = 50. The dice is expected to land on an even number 150 − 50 = 100 more times than on a six. Writing 50 is wrong because that is just the expected number of sixes on its own, without comparing it to the expected number of evens. Writing 150 is wrong because that is just the expected number of evens on its own, without subtracting the sixes. Writing 200 is wrong because it adds the two expected frequencies together (150 + 50 = 200) instead of finding the difference between them. The dice is expected to land on an even number 100 more times than on a six.
- (b) 80 — To find the number of attempts needed, divide the target number of successes by the probability of success: 60 ÷ 0.75 = 80. Writing 45 is wrong because 60 × 0.75 = 45 multiplies instead of dividing — that is the number of successes expected from 60 attempts, not the number of attempts needed for 60 successes. Writing 240 is wrong because 60 ÷ 0.25 = 240 uses 0.25, the probability of MISSING, instead of 0.75, the probability of scoring. Writing 90 is wrong because it comes from misremembering 0.75 as 2/3 and dividing by that instead: 60 ÷ (2/3) = 90. She needs to attempt 80 free throws.
- (c) 1/10 — On the adult branch, 210 − 189 = 21 appointments were missed. There are 300 − 210 = 90 child appointments, and 90 − 81 = 9 of those were missed. In total, 21 + 9 = 30 appointments were missed, out of 300: 30/300 = 1/10. Writing 7/100 is wrong because 21/300 simplifies to 7/100, and 21 only counts the adult branch, leaving out the 9 missed child appointments. Writing 3/100 is wrong because 9/300 simplifies to 3/100, and 9 only counts the child branch, leaving out the 21 missed adult appointments. Writing 1/9 is wrong because it divides the 30 missed appointments by the 270 that were attended (300 − 30) instead of by the whole 300 booked. The probability is 1/10.
- (b) 38% — Method: the two swimming percentages are quoted inside different age groups, so weight each one by the size of its group and add the two results. Working: the under 18s are 45% of the members and 60% of them swim, giving 0.45 × 60 = 27% of all the members. The members aged 18 or over are 55% of the members and 20% of them swim, giving 0.55 × 20 = 11% of all the members. Adding these gives 38%. Answer: 38% of the members swim each week. The distractors: 80% comes from adding 60% and 20% straight off, treating two rates quoted inside different groups as though they could be added; 40% is the mean of 60% and 20%, which would be right only if the two age groups were the same size, and they are not; 42% comes from pairing each swimming rate with the wrong age group, working out 0.45 × 20 added to 0.55 × 60.
- (c) Red — Theoretical probability is 1/3 ≈ 0.333 for each colour. Red's relative frequency is 38/90 ≈ 0.422, above 1/3, so red is over-represented. Blue's relative frequency is 26/90 ≈ 0.289, below 1/3, so blue is under-represented, not over. Green's relative frequency is also 26/90 ≈ 0.289, below 1/3 for the same reason. Since red's relative frequency clearly exceeds 1/3, it is not true that none of the colours are over-represented.
- (b) 70 — Saloon, estate and hatchback are exhaustive, so their probabilities sum to 1: the probability of a hatchback is 1 − 0.28 − 0.37 = 0.35. The number of hatchbacks is 0.35 × 200 = 70. Treating the SUM of the other two probabilities, 0.28 + 0.37 = 0.65, as the probability of a hatchback instead of its complement gives 0.65 × 200 = 130. Multiplying the correct probability, 0.35, by 100 instead of the 200 cars actually surveyed gives 35. Averaging the two given probabilities, (0.28 + 0.37) ÷ 2 = 0.325, instead of subtracting them from 1, and then multiplying by 200 gives 65.
- (b) 0.225 — The relative frequency of rain is the number of rainy days out of all days recorded: 9 ÷ 40 = 0.225, which is noticeably less than the forecaster's claimed 0.3. Using the number of dry days, 40 − 9 = 31, as the denominator instead of the total of 40 gives 9 ÷ 31 = 0.29 (2 d.p.). Simply reporting the forecaster's claimed value, 0.3, without calculating anything from the data at all, ignores the recorded results completely. Misplacing the decimal point, treating 9 out of 40 as 9%, gives 0.09 instead of 0.225.
Build your own mix at the worksheet builder.