Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (c) 102 — Method: turn the past record into a relative frequency, then use it as an estimate of the probability of rain and multiply by the number of days being predicted for. Working: relative frequency of rain = 70 ÷ 250 = 0.28. Expected rainy days in 365 days = 365 × 0.28 = 102.2, which rounds to about 102 days. Answer: about 102 days. Watch out: writing down 48 swaps which number is the sample and which is the target, working out 70 ÷ 365 × 250 instead of 70 ÷ 250 × 365. Writing down 70 just repeats the original count of rainy days without scaling it up to the new, longer period at all. And writing down 110 comes from rounding the relative frequency to 0.3 before multiplying, 365 × 0.3 = 109.5, when 70 ÷ 250 is exactly 0.28 and needs no rounding at all.
- (a) Game B, by £8 — Game A's expected total is 40 × 0.2 × £5 = £40. Game B's expected total is 40 × 0.1 × £12 = £48. Game B is higher, by £48 − £40 = £8. Writing 'Game A, by £8' is wrong because it has the right difference but the wrong game — Game A's total (£40) is actually LOWER than Game B's, not higher. Writing 'Game B, by £48' is wrong because £48 is Game B's whole expected total, not the DIFFERENCE between the two games. Writing 'Game A, by £40' is wrong in the same way, using Game A's whole total as if it were the margin, and naming the wrong game as the winner. Game B gives the higher expected total, by £8.
- (b) 39 — Method: put the counts into a two-way table and fill each missing cell by subtracting along a row or down a column. Working: the number of female members is 150 − 80 = 70. The pool column holds 66 members and 35 of them are male, so the number of female pool users is 66 − 35 = 31. Subtracting along the female row, 70 − 31 = 39 female members use the gym. Answer: 39 female members use the gym. The distractors: 45 comes from subtracting along the male row instead, 80 − 35 = 45, which counts male gym users; 31 is the female pool cell, written down one step before the gym cell; 84 is 150 − 66 and counts every gym user, male and female together.
- (a) 753 — The estimate from 2000 spins is the most reliable, since it comes from the largest sample size, so the best estimate of the probability is 0.251. Over a further 3000 spins, the expected number landing on green is 3000 × 0.251 = 753. Writing 1050 is wrong because 3000 × 0.350 = 1050 uses the estimate from only 20 spins, the LEAST reliable of the three. Writing 870 is wrong because 3000 × 0.290 = 870 uses the estimate from 200 spins rather than the more reliable 2000-spin estimate. Writing 750 is wrong because 3000 × 0.25 = 750 ignores the recorded data completely and simply assumes each of the 4 colours is equally likely. The best estimate is 753 expected green spins.
- (b) 40 — n(P ∪ Q) = n(P) + n(Q) − n(P ∩ Q) = 34 + 27 − 11 = 50. The complement is everyone outside both sets: n((P ∪ Q)′) = 90 − 50 = 40. Adding P and Q without subtracting the overlap gives 34 + 27 = 61, so 90 − 61 = 29 double-subtracts the 11 who are in both. Reporting n(P ∪ Q) itself, 50, forgets to take the complement at all. Subtracting only n(P) from the universal set, 90 − 34 = 56, ignores set Q altogether.
- (b) 100 — The sample shows a proportion of 8/60 = 2/15 faulty. Apply that proportion to the new batch of 750: 750 × 2/15 = 100. Flipping the ratio, calculating 8/750 × 60 instead of 8/60 × 750, gives 0.64, which rounds to about 1. Assuming the same number of faulty items applies to the new batch, without scaling for its larger size, just repeats the sample's count of 8. Rounding the proportion 8/60 = 0.1333... down to 0.1 before multiplying gives 750 × 0.1 = 75.
- (b) 41/160 — In total, 27 + 14 = 41 of the 160 employees cycle to work, so the probability is 41/160 (41 and 160 share no common factor, so this is already in its simplest form). Writing 27/160 is wrong because it only counts the full-time cyclists and leaves out the 14 part-time cyclists. Writing 41/90 is wrong because it uses the full-time total (90) as the denominator instead of the whole survey (160). Writing 1/5 is wrong because it only uses the part-time branch, simplifying 14/70 to 1/5 and ignoring the full-time cyclists completely. The probability is 41/160.
- (a) 1276 — Method: an unbiased relative frequency tends towards the theoretical probability as the number of trials increases, so use the record resting on the most trials, then multiply by the number of new trials. Working: the three records rest on 50, 200 and 1000 drops, so the most reliable is the one after 1000 drops, namely 0.638, and the run is indeed settling as the trials increase. The expected number of point up landings in 2000 further drops is 2000 × 0.638 = 1276. Answer: about 1276 times. The distractors: 1440 uses the earliest record, which rests on only 50 drops, giving 2000 × 0.720 = 1440; 1330 uses the middle record, treating 200 drops as a safe compromise when 1000 drops is better still, giving 2000 × 0.665 = 1330; 1348 comes from averaging the three records, since 0.720 + 0.665 + 0.638 = 2.023 and 2.023 ÷ 3 = 0.674, then 2000 × 0.674 = 1348, which gives the 50 drop record the same weight as the 1000 drop record.
- (b) 8,100 — First find the total number of alerts sent in the month: 1,500 × 30 = 45,000. Then apply the probability of a 'STOP' reply: 45,000 × 0.18 = 8,100. Stopping after finding only one day's expected replies, 1,500 × 0.18 = 270, forgets to scale up to the whole month. Multiplying the number of days by the probability instead of by the daily total of alerts gives 30 × 0.18 = 5.4, which rounds to 5. Shifting the decimal point in the probability, using 0.018 instead of 0.18, gives 45,000 × 0.018 = 810.
- (a) 0.30 — Red, blue, green and yellow are exhaustive, so all four probabilities sum to 1: 0.24 + 0.16 + x + x = 1, so 2x + 0.40 = 1, giving 2x = 0.60 and x = 0.30. Stopping at 2x = 0.60 without dividing by 2 leaves 0.60, the combined probability of both blue and green together, not the value of x on its own. Sharing the 0.60 across all four colours instead of just the two unknown ones gives 0.60 ÷ 4 = 0.15. Leaving out the 0.16 for yellow gives 2x + 0.24 = 1, so 2x = 0.76 and x = 0.38.
- (b) £100 — Method: find the expected number of wins, turn that into the expected pay out, then compare it with what the games cost. Working: the expected number of wins is 200 × 0.15 = 30. Each win pays £10, so the expected pay out is 30 × 10 = 300 pounds. Playing 200 times at £2 a go costs 200 × 2 = 400 pounds. The expected loss is 400 − 300 = 100 pounds. Answer: Amir should expect to be about £100 down. The distractors: £300 is the expected winnings on their own, with the cost of playing never taken off; £400 is the total cost of playing, with the winnings never taken off; £700 comes from adding the two totals, 400 + 300 = 700, instead of subtracting one from the other.
- (d) 0.468 — The probability that Leo does not wake up before his alarm is 1 − 0.35 = 0.65, and the probability that his sister does not is 1 − 0.28 = 0.72. Since the two events are independent, multiply the complements: 0.65 × 0.72 = 0.468. A candidate who answers 0.63 has added the two given probabilities, 0.35 + 0.28, instead of finding and multiplying the complements. A candidate who answers 0.098 has multiplied the two given probabilities directly, 0.35 × 0.28, without taking complements first. A candidate who answers 0.532 has correctly reached 0.468 but then subtracted it from 1 again by mistake.
- (a) 20 — Dice A is fair, so its expected number of sixes is 150 × 1/6 = 25. Dice B has P(6) = 0.3, so its expected number of sixes is 150 × 0.3 = 45. The difference is 45 − 25 = 20. Adding the two expected values instead of subtracting them gives 25 + 45 = 70. Reporting Dice B's expected sixes on their own, without comparing to Dice A, gives 45. Using the fair probability 1/6 for Dice B as well as Dice A ignores the bias altogether, giving 150 × 1/6 = 25 for both dice and a difference of 0.
- (c) 325 — Method: first find the relative frequency of NOT landing on red from the 200 spins, then scale that up to 500 spins. Working: non-red results = 50 + 80 = 130, out of 200 spins, so P(not red) = 130 ÷ 200 = 0.65. Expected non-red results in 500 spins = 500 × 0.65 = 325. Answer: 325. Watch out: writing down 175 finds the expected number of RED results instead, 70 ÷ 200 × 500 = 175, answering the opposite of what was asked. Writing down 250 assumes landing red or not landing red must be a fair 50-50 split, but the spinner is biased and the actual results do not split evenly. And writing down 130 stops after finding how many of the 200 spins were non-red and forgets to scale that figure up to the 500 spins asked for.
- (c) 500 — Method: the expected number of successes is the number of trials multiplied by the probability, so to find the number of trials, divide the expected number by the probability. Working: let n be the number of seeds planted. Then n multiplied by 0.6 must come to 300, so n = 300 ÷ 0.6 = 500. Answer: the grower should plant 500 seeds. The distractors: 180 comes from multiplying instead of dividing, 300 × 0.6 = 180, which answers how many of 300 seeds would germinate; 750 comes from dividing by the probability of not germinating, 300 ÷ 0.4 = 750; 120 comes from multiplying by that same 0.4, 300 × 0.4 = 120.
Build your own mix at the worksheet builder.