Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (a) £150 — Each game, the expected payout is 0.1 × £20 = £2, so the fête's expected profit per game is the £3 charged minus the £2 expected payout, £1. Over 150 games, that is 150 × £1 = £150. Writing £300 is wrong because 150 × £2 = £300 is the total expected PAYOUT, not the profit — it has not been subtracted from the entry fees. Writing £450 is wrong because 150 × £3 = £450 is the total money taken in entry fees, without accounting for what is expected to be paid out in prizes. Writing £1 is wrong because that is only the expected profit for ONE game — it has not been scaled up to all 150 games. The fête's expected profit is £150.
- (a) 0.45, different from 0.4 for all the households — Method: work out the probability inside the restricted group of garden owners, then work out the probability across the whole survey, and compare the two. Working: 54 of the 120 households with a garden own a dog, so the conditional probability is 54 divided by 120, which is 0.45. Across the whole survey 80 of the 200 households own a dog, which is 0.4. Since 0.45 is not 0.4, having a garden changes the chance of owning a dog and the two events are not independent. Answer: 0.45, different from 0.4 for all the households. The distractors: 0.27 is 54/200, dividing the households with both by the whole survey instead of by the 120 with a garden; 0.675 is 54/80, the probability that a household has a garden given that it owns a dog, which is the condition and the event the wrong way round; 0.4 is 80/200, the probability of owning a dog with the garden information never used, which is why that route also reports no difference.
- (c) 100 — There are 3 even numbers on a fair dice (2, 4 and 6), so the probability of landing on an even number is 3/6 = 1/2, and 300 × 1/2 = 150. The probability of landing on a six is 1/6, so 300 × 1/6 = 50. The dice is expected to land on an even number 150 − 50 = 100 more times than on a six. Writing 50 is wrong because that is just the expected number of sixes on its own, without comparing it to the expected number of evens. Writing 150 is wrong because that is just the expected number of evens on its own, without subtracting the sixes. Writing 200 is wrong because it adds the two expected frequencies together (150 + 50 = 200) instead of finding the difference between them. The dice is expected to land on an even number 100 more times than on a six.
- (a) 50 — To find the number of shots needed for an expected 12 hits, divide the number of hits wanted by the probability of a hit: 12 ÷ 0.24 = 50. Multiplying the number of hits by the probability instead of dividing gives 12 × 0.24 = 2.88, which rounds to 3 shots. Rounding 0.24 to 0.25 before dividing gives 12 ÷ 0.25 = 48. Using the probability of missing, 1 − 0.24 = 0.76, instead of the probability of hitting, gives 12 ÷ 0.76 = 15.79, which rounds to 16.
- (d) No, because 3/8 + 5/12 + 1/6 = 23/24 — Using a common denominator of 24: 3/8 = 9/24, 5/12 = 10/24 and 1/6 = 4/24. Adding these numerators gives 9 + 10 + 4 = 23, so the three probabilities sum to 23/24, which is less than 1 — Zara is not correct. Adding the original numerators (3 + 5 + 1 = 9) over a denominator of 12 instead of converting each fraction properly gives 9/12 = 3/4, still less than 1 but the wrong fraction. Converting 1/6 to 5/24 instead of 4/24 (using the wrong scaling) makes the total 9/24 + 10/24 + 5/24 = 24/24 = 1, wrongly suggesting the probabilities are valid. Judging validity from the fact that each individual fraction lies between 0 and 1 ignores that an exhaustive set must sum to exactly 1, not merely contain valid individual values.
- (c) Noah — 11/32 = 0.34375, above 34%. — Converting 11/32 to a decimal gives 11 ÷ 32 = 0.34375, which is greater than 34% (0.34), so Noah has the better save rate: 'Noah — 11/32 = 0.34375, above 34%.' Comparing the raw numbers 34 and 11 directly, without converting the fraction to the same form, gives 'Elin — 34 is bigger than 11.' Treating a larger denominator as meaning a bigger value, rather than smaller equal shares, gives 'Noah — 32 is a bigger denominator.' Rounding 34.375% to 34% to the nearest whole percent hides the difference and gives 'Equal — both round to 34% to the nearest percent.'
- (a) 3,860 — The probability a bulb works correctly is the complement of being defective: 1 − 0.035 = 0.965. Expected number working correctly = 0.965 × 4,000 = 3,860. Using the probability of being defective instead of its complement gives 4,000 × 0.035 = 140, the expected number of DEFECTIVE bulbs, not working ones. Shifting the decimal point in the complement, using 0.0965 instead of 0.965, gives 4,000 × 0.0965 = 386. Assuming every bulb works, ignoring the 0.035 probability altogether, gives the full batch of 4,000.
- (c) 102 — Method: turn the past record into a relative frequency, then use it as an estimate of the probability of rain and multiply by the number of days being predicted for. Working: relative frequency of rain = 70 ÷ 250 = 0.28. Expected rainy days in 365 days = 365 × 0.28 = 102.2, which rounds to about 102 days. Answer: about 102 days. Watch out: writing down 48 swaps which number is the sample and which is the target, working out 70 ÷ 365 × 250 instead of 70 ÷ 250 × 365. Writing down 70 just repeats the original count of rainy days without scaling it up to the new, longer period at all. And writing down 110 comes from rounding the relative frequency to 0.3 before multiplying, 365 × 0.3 = 109.5, when 70 ÷ 250 is exactly 0.28 and needs no rounding at all.
- (d) 0.80 — Evens is exactly halfway along the scale, at 0.5, and 3/10 written as a decimal is 0.3. A probability 3/10 higher than evens is 0.5 + 0.3 = 0.80. Giving 0.30 as the answer converts the increase but never adds it to the value of evens. Adding the increase to 1, the 'certain' end of the scale, instead of to evens gives 1 + 0.3 = 1.30, which cannot be a probability. Writing 3/10 as 0.03 instead of 0.3, a place-value slip, gives 0.5 + 0.03 = 0.53.
- (b) 24/125 — On the fiction branch, 160 − 112 = 48 books were returned late. None of the non-fiction books were late, so the total number of late books is 48, out of 250 books altogether: 48/250 = 24/125. Writing 3/10 is wrong because it divides the 48 late fiction books by the fiction total (160) instead of the whole library total (250). Writing 56/125 is wrong because 112/250 simplifies to 56/125, and 112 is the number of fiction books returned ON TIME, not late. Writing 9/25 is wrong because 90/250 simplifies to 9/25, and 90 is simply the number of non-fiction books, which has nothing to do with late returns. The probability is 24/125.
- (a) 70 — Method: two linked steps. Find the expected number of billing calls first, then take the 35% of those, because the 35% is quoted for billing calls only. Working: 40% of 500 is 200 billing calls. 35% of 200 is 70 calls. Answer: you would expect 70 calls. The distractors: 200 stops after the first step and gives the billing calls, forgetting that only some of them are dealt with quickly; 175 is 35% of 500, applying the quick response rate to every call the centre takes rather than to the billing calls only; 375 comes from adding 40% and 35% to get 75% and taking 75% of 500, which treats two stages of one journey as separate outcomes to be added.
- (c) 80 — Since 180 calls are 0.75 of all the technical support calls, the technical support total is 180 ÷ 0.75 = 240. The billing calls make up the rest of the 320 calls, so 320 − 240 = 80. Choosing 240 comes from stopping after finding the technical support total and forgetting the question asks for the billing calls, which are the rest. Choosing 185 comes from multiplying 180 × 0.75 = 135 instead of dividing, then working out 320 − 135 = 185. Choosing 140 comes from using 180 directly as the whole technical support total, ignoring the probability altogether, then working out 320 − 180 = 140.
- (b) 8,100 — First find the total number of alerts sent in the month: 1,500 × 30 = 45,000. Then apply the probability of a 'STOP' reply: 45,000 × 0.18 = 8,100. Stopping after finding only one day's expected replies, 1,500 × 0.18 = 270, forgets to scale up to the whole month. Multiplying the number of days by the probability instead of by the daily total of alerts gives 30 × 0.18 = 5.4, which rounds to 5. Shifting the decimal point in the probability, using 0.018 instead of 0.18, gives 45,000 × 0.018 = 810.
- (c) 500 — Method: the expected number of successes is the number of trials multiplied by the probability, so to find the number of trials, divide the expected number by the probability. Working: let n be the number of seeds planted. Then n multiplied by 0.6 must come to 300, so n = 300 ÷ 0.6 = 500. Answer: the grower should plant 500 seeds. The distractors: 180 comes from multiplying instead of dividing, 300 × 0.6 = 180, which answers how many of 300 seeds would germinate; 750 comes from dividing by the probability of not germinating, 300 ÷ 0.4 = 750; 120 comes from multiplying by that same 0.4, 300 × 0.4 = 120.
- (c) £3.10 — Aisha's tickets cost 8 × 50p = £4.00. Her expected winnings are (8/400) × £45 = £0.90, since she holds 8 of the 400 tickets. Her expected loss is the cost minus the expected winnings: £4.00 − £0.90 = £3.10. Writing £4.00 is wrong because it is only the cost of her tickets, with no account taken of the expected winnings she might get back. Writing £0.90 is wrong because that is her expected WINNINGS, not her loss — the cost has not been subtracted. Writing £3.89 is wrong because it uses 1 ticket instead of her actual 8 tickets when working out the expected winnings: (1/400) × £45 = £0.1125, giving £4.00 − £0.11 = £3.89. Aisha should expect to lose £3.10.
Build your own mix at the worksheet builder.