Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) 56 — Method: count the trials over the whole period first, then multiply the number of trials by the probability. Working: 4 weeks is 4 × 7 = 28 days, and at 25 trains a day that is 25 × 28 = 700 trains. The expected number of late trains is 700 × 0.08 = 56. Answer: about 56 late trains over the 4 weeks. The distractors: 2 is the expected number for a single day, 25 × 0.08 = 2, with the 28 days never brought in; 14 uses one week instead of four, 25 × 7 × 0.08 = 14; 644 is 700 − 56 and counts the trains expected to be on time.
- (d) 1/8 — The multiples of 3 from 1 to 8 are 3 and 6, so the probability of that event is 2/8, which simplifies to 1/4. The probability of the coin landing on heads is 1/2. Since the spin and the toss are independent, multiply the two probabilities: 1/4 × 1/2 = 1/8. A candidate who answers 1/4 has considered only the spinner and forgotten to combine it with the coin toss. A candidate who answers 1/2 has considered only the coin and forgotten the spinner condition entirely. A candidate who answers 1/16 has counted only one number, 6, as a multiple of 3 instead of two, giving 1/8 × 1/2.
- (c) 0.04 — Method: 'made by machine B and faulty' is the second branch of a tree followed after the first, so multiply the probability of machine B by the probability of a fault given machine B. Working: machine B makes 0.4 of the bolts, and 0.1 of those bolts are faulty, so the probability is 0.4 × 0.1 = 0.04. Answer: the probability is 0.04. The distractors: 0.5 comes from adding 0.4 and 0.1 instead of multiplying, treating two stages of one journey as two separate outcomes; 0.1 gives the fault rate for machine B on its own, as though every bolt in the factory came from machine B, so the 40% share is never used; 0.07 is 0.6 × 0.05 added to 0.4 × 0.1, the probability that a bolt is faulty whichever machine made it, which answers a question about all the production rather than about machine B.
- (d) 0.80 — Evens is exactly halfway along the scale, at 0.5, and 3/10 written as a decimal is 0.3. A probability 3/10 higher than evens is 0.5 + 0.3 = 0.80. Giving 0.30 as the answer converts the increase but never adds it to the value of evens. Adding the increase to 1, the 'certain' end of the scale, instead of to evens gives 1 + 0.3 = 1.30, which cannot be a probability. Writing 3/10 as 0.03 instead of 0.3, a place-value slip, gives 0.5 + 0.03 = 0.53.
- (b) 1/4 — There are 4 × 4 = 16 equally likely ordered outcomes for the two dice. The pairs that total 5 are: first dice 1 with second dice 4; first dice 2 with second dice 3; first dice 3 with second dice 2; and first dice 4 with second dice 1 — which is 4 outcomes, so the probability is 4/16 = 1/4. A candidate who answers 1/8 has listed only 2 of the four pairs, forgetting that first dice 1 with second dice 4 and first dice 4 with second dice 1 are separate outcomes because the dice are different. A candidate who answers 3/16 has found 3 pairs instead of 4, missing one from the list. A candidate who answers 1/16 has counted only a single pair, such as first dice 2 with second dice 3, and treated the order of the dice as not mattering.
- (b) £100 — Method: find the expected number of wins, turn that into the expected pay out, then compare it with what the games cost. Working: the expected number of wins is 200 × 0.15 = 30. Each win pays £10, so the expected pay out is 30 × 10 = 300 pounds. Playing 200 times at £2 a go costs 200 × 2 = 400 pounds. The expected loss is 400 − 300 = 100 pounds. Answer: Amir should expect to be about £100 down. The distractors: £300 is the expected winnings on their own, with the cost of playing never taken off; £400 is the total cost of playing, with the winnings never taken off; £700 comes from adding the two totals, 400 + 300 = 700, instead of subtracting one from the other.
- (a) 5/36 — Method: list every result of the two dice as an ordered pair, first score then second score, count the pairs that give the total asked for and divide by how many pairs the list holds. Working: each dice can show 6 scores, so there are 6 × 6 = 36 equally likely ordered pairs. The pairs whose scores add to 6 are (1, 5), (2, 4), (3, 3), (4, 2) and (5, 1), which is 5 pairs out of the 36. Answer: the probability is 5/36. The distractors: 4/36 comes from listing (1, 5), (5, 1), (2, 4) and (4, 2) and leaving (3, 3) out, because a double does not look like a pair that can be turned round; 5/12 comes from finding the 5 pairs but taking the number of possible results to be 6 + 6 = 12, adding the two dice instead of multiplying them; 1/11 comes from treating the eleven possible totals 2, 3, 4 and so on up to 12 as equally likely, so that a total of 6 is one result out of eleven.
- (b) 120 — Purple's probability is its angle out of the full circle: 144° ÷ 360° = 2/5. Expected number on purple = 2/5 × 300 = 120. Assuming the three colours are equally likely, ignoring their different angles, gives 300 ÷ 3 = 100. Using orange's angle, 90°, instead of purple's 144° gives a probability of 1/4, so 300 × 1/4 = 75. Treating 144 as a percentage instead of finding its fraction of 360° gives 300 × 0.144 = 43.2, which rounds to 43.
- (b) 1/4 — Method: the person picked is known to be aged 30 or over, so the sample space is those 140 people; divide the number of them who had been to the cinema by 140. Working: 35 of the 140 people aged 30 or over had been to the cinema, giving 35/140. Dividing the numerator and the denominator by 35 gives 1/4. Answer: the probability is 1/4. The distractors: 7/20 is 35/100, taking the count from the older group but the total from the under 30s, which is reading across the wrong row; 7/48 is 35/240, dividing by everyone surveyed instead of by the age group named; 3/4 is 105/140, the probability that someone aged 30 or over had NOT been to the cinema, the opposite event inside the correct group.
- (a) 3/8 — There are 4 × 6 = 24 equally likely outcomes. The outcomes with no 3 at all have Spinner E showing 1, 2 or 4 and Spinner F showing 1, 2, 4, 5 or 6, giving 3 × 5 = 15 outcomes. So the outcomes with at least one 3 are 24 − 15 = 9, and the probability is 9/24 = 3/8. Choosing 5/12 comes from adding the two individual probabilities of a 3, 1/4 + 1/6, which counts the outcome where both spinners show 3 twice over. Choosing 1/4 comes from only counting the case where Spinner E shows 3, and forgetting the outcomes where Spinner F shows 3 instead. Choosing 5/8 comes from working out the probability of getting no 3 at all, 15/24 = 5/8, and giving that as the final answer instead of subtracting it from 1.
- (a) 3,860 — The probability a bulb works correctly is the complement of being defective: 1 − 0.035 = 0.965. Expected number working correctly = 0.965 × 4,000 = 3,860. Using the probability of being defective instead of its complement gives 4,000 × 0.035 = 140, the expected number of DEFECTIVE bulbs, not working ones. Shifting the decimal point in the complement, using 0.0965 instead of 0.965, gives 4,000 × 0.0965 = 386. Assuming every bulb works, ignoring the 0.035 probability altogether, gives the full batch of 4,000.
- (a) 0.48 — There are two ways to score exactly one throw: scoring on the first and missing the second, 0.6 × 0.4 = 0.24, or missing the first and scoring the second, 0.4 × 0.6 = 0.24. Adding these gives 0.24 + 0.24 = 0.48. Choosing 0.24 comes from working out only one of the two paths and forgetting the other one also gives exactly one score. Choosing 0.36 comes from working out the probability of scoring BOTH throws, 0.6 × 0.6 = 0.36, instead of exactly one. Choosing 0.84 comes from working out the probability of scoring AT LEAST one throw, 1 − 0.4 × 0.4 = 0.84, instead of exactly one.
- (c) 102 — Method: turn the past record into a relative frequency, then use it as an estimate of the probability of rain and multiply by the number of days being predicted for. Working: relative frequency of rain = 70 ÷ 250 = 0.28. Expected rainy days in 365 days = 365 × 0.28 = 102.2, which rounds to about 102 days. Answer: about 102 days. Watch out: writing down 48 swaps which number is the sample and which is the target, working out 70 ÷ 365 × 250 instead of 70 ÷ 250 × 365. Writing down 70 just repeats the original count of rainy days without scaling it up to the new, longer period at all. And writing down 110 comes from rounding the relative frequency to 0.3 before multiplying, 365 × 0.3 = 109.5, when 70 ÷ 250 is exactly 0.28 and needs no rounding at all.
- (b) 11/36 — Method: 'at least one' is the opposite of 'none at all', so work out the probability of no 5 on either roll and take it away from 1. Working: a roll that is not a 5 has probability 5/6, and the rolls are independent, so no 5 at all has probability 5/6 × 5/6 = 25/36. Taking this from 36/36 leaves 11/36. Answer: the probability is 11/36. The distractors: 25/36 is the probability of no 5 at all, written down without the final subtraction; 12/36 comes from counting the 6 pairs with a 5 on the first roll and the 6 pairs with a 5 on the second and adding them, which counts the pair (5, 5) twice; 30/36 comes from working out 1 − 1/6 as though only one roll were made.
- (d) 5/12 — The possible totals are 2 to 12. The prime totals are 2, 3, 5, 7 and 11, with 1, 2, 4, 6 and 2 ways to make them, giving 1 + 2 + 4 + 6 + 2 = 15 outcomes out of 36, so the probability is 15/36 = 5/12. Choosing 7/18 comes from forgetting that a total of 2 counts as prime, giving 14/36 = 7/18 instead. Choosing 19/36 comes from wrongly including a total of 9 as a prime number, adding its 4 ways to the correct 15 to get 19/36. Choosing 13/36 comes from forgetting the 2 ways of making a total of 11, giving 13/36 instead of 15/36.
Build your own mix at the worksheet builder.