Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) 0.150 — The six scores are exhaustive, so their probabilities sum to 1. The probability of not landing on 6 is 1 − 0.25 = 0.75, and this is shared equally between the other five scores, so each has probability 0.75 ÷ 5 = 0.150. Giving 0.750 as the answer stops after finding the probability of not landing on 6, without sharing it out between the five remaining scores. Dividing 0.75 by 6 instead of by 5 gives 0.125, wrongly including the score of 6 among the equally likely scores. Ignoring the bias completely and dividing 1 by all six scores gives 1 ÷ 6 = 0.167.
- (b) 1/20 — Method: two draws with nothing put back are combined by multiplying, with the second probability worked out from the tickets still in the bag. Working: the first draw takes the wanted ticket with probability 1/5. That ticket is kept out, so 4 tickets remain and only one of them is the ticket wanted second, giving 1/4. Multiplying gives 1/20. Answer: the probability is 1/20. The distractors: 1/10 comes from ignoring the order and treating the draw as a choice of two tickets from five, of which there are ten; 1/25 comes from keeping the total at 5 for the second draw, which is what happens only if the first ticket is put back; 2/5 comes from counting the two wanted tickets over the five in the bag, as though one draw decided the whole question.
- (d) 5/12 — The possible totals are 2 to 12. The prime totals are 2, 3, 5, 7 and 11, with 1, 2, 4, 6 and 2 ways to make them, giving 1 + 2 + 4 + 6 + 2 = 15 outcomes out of 36, so the probability is 15/36 = 5/12. Choosing 7/18 comes from forgetting that a total of 2 counts as prime, giving 14/36 = 7/18 instead. Choosing 19/36 comes from wrongly including a total of 9 as a prime number, adding its 4 ways to the correct 15 to get 19/36. Choosing 13/36 comes from forgetting the 2 ways of making a total of 11, giving 13/36 instead of 15/36.
- (b) 0.225 — The relative frequency of rain is the number of rainy days out of all days recorded: 9 ÷ 40 = 0.225, which is noticeably less than the forecaster's claimed 0.3. Using the number of dry days, 40 − 9 = 31, as the denominator instead of the total of 40 gives 9 ÷ 31 = 0.29 (2 d.p.). Simply reporting the forecaster's claimed value, 0.3, without calculating anything from the data at all, ignores the recorded results completely. Misplacing the decimal point, treating 9 out of 40 as 9%, gives 0.09 instead of 0.225.
- (d) 5/11 — Method: the pen already taken was black, so update the contents of the box before working out the second probability. Working: the box held 12 pens and one black pen has gone, so 11 pens remain. None of the blue pens has been taken, so all 5 are still there, and the probability is 5/11, which will not cancel. Answer: the probability is 5/11. The distractors: 5/12 uses the box as it was at the start, which is only correct if the first pen is put back; 4/11 takes one off the blue count as well as the total, as though the pen removed had been blue; 6/11 gives the probability that the second pen is black, carrying on with the colour of the first pen instead of the colour asked for.
- (a) 70 — Method: two linked steps. Find the expected number of billing calls first, then take the 35% of those, because the 35% is quoted for billing calls only. Working: 40% of 500 is 200 billing calls. 35% of 200 is 70 calls. Answer: you would expect 70 calls. The distractors: 200 stops after the first step and gives the billing calls, forgetting that only some of them are dealt with quickly; 175 is 35% of 500, applying the quick response rate to every call the centre takes rather than to the billing calls only; 375 comes from adding 40% and 35% to get 75% and taking 75% of 500, which treats two stages of one journey as separate outcomes to be added.
- (c) 0.15 — Method: for two independent events, multiply along the branches of the tree to find the probability of both outcomes happening together. Working: P(red and heads) = P(red) × P(heads) = 0.3 × 0.5 = 0.15. Answer: 0.15. Watch out: adding the two probabilities, 0.3 + 0.5 = 0.8, does not give the probability of both — probabilities along one path of a tree are multiplied, not added. Writing down 0.5 ignores the spinner altogether and gives only the coin's probability. And writing down 0.65 is the probability of red OR heads, which is 0.3 + 0.5 − 0.15 = 0.65, a different question from the one asked here.
- (c) 47 — Method: fill the first pair of branches of the frequency tree, then the failures on each branch, then add only the failing end branches. Working: 70% of 200 is 140, so 140 cars were more than 3 years old and 200 − 140 = 60 cars were 3 years old or less. One quarter of the older cars failed: 140 ÷ 4 = 35. The newer branch gives 12 failures. Adding the two failing branches gives 35 + 12 = 47. Answer: 47 of the cars failed the test. The distractors: 35 is the older branch on its own, with the 12 newer failures never added; 62 comes from taking 1 in 4 of all the cars, 200 ÷ 4 = 50, and then adding the 12; 153 is 200 − 47 and counts the cars that passed.
- (b) 11/36 — Method: 'at least one' is the opposite of 'none at all', so work out the probability of no 5 on either roll and take it away from 1. Working: a roll that is not a 5 has probability 5/6, and the rolls are independent, so no 5 at all has probability 5/6 × 5/6 = 25/36. Taking this from 36/36 leaves 11/36. Answer: the probability is 11/36. The distractors: 25/36 is the probability of no 5 at all, written down without the final subtraction; 12/36 comes from counting the 6 pairs with a 5 on the first roll and the 6 pairs with a 5 on the second and adding them, which counts the pair (5, 5) twice; 30/36 comes from working out 1 − 1/6 as though only one roll were made.
- (c) 15/23 — Method: find P(rough and delayed) and the overall P(delayed) using the tree, then divide. Working: P(rough and delayed) = 0.2 × 0.75 = 0.15. P(calm and delayed) = 0.8 × 0.1 = 0.08. P(delayed) = 0.15 + 0.08 = 0.23. P(rough | delayed) = 0.15 ÷ 0.23 = 15/23. Answer: 15/23. Watch out: leaving the answer as 0.15 (3/20) gives P(rough and delayed) itself, without dividing by the overall probability that a crossing is delayed. Giving 0.75 (3/4) is the probability you were told to start with — that a crossing is delayed GIVEN the sea is rough — which is the reverse of what's being asked. And 0.2 (1/5) is just the original probability that the sea is rough, before you take the fact that the crossing was delayed into account.
- (b) 57/100 — Pooling both trials: total heads = 24 + 33 = 57, total flips = 40 + 60 = 100, so the combined relative frequency is 57/100, which is already in its simplest form since 57 and 100 share no common factor. Averaging the two separate relative frequencies instead, (24/40 + 33/60) ÷ 2 = (0.6 + 0.55) ÷ 2 = 0.575 = 23/40, treats the two trials as equally weighted even though Ben made more flips, which is not correct. Using only Leah's data gives 24/40 = 3/5. Using only Ben's data gives 33/60 = 11/20.
- (d) 12/17 — Method: the person picked is known to have passed, so the sample space is everyone who passed; divide the course takers who passed by that total. Working: 120 course takers and 50 others passed, so 170 people passed. The course takers who passed give 120/170, and dividing the numerator and the denominator by 10 gives 12/17. Answer: the probability is 12/17. The distractors: 4/5 is 120/150, the probability that someone passed given that they took the course, which reverses the condition and the event; 12/25 is 120/250, dividing by everyone who sat the test rather than by the 170 who passed; 17/25 is 170/250, the probability that a person picked from everyone sitting the test passed, which answers a different question altogether.
- (b) 60 — Method: independence means the proportion of part timers among the cyclists is the same as the proportion among all the employees, so find that proportion and apply it to the cyclists. Working: 150 of the 400 employees work part time, which is a proportion of 0.375. Applying it to the 160 cyclists gives 0.375 × 160 = 60 employees. Answer: you would expect 60 employees. The distractors: 310 adds 150 and 160, treating the group who do both as everyone who does one thing or the other; 10 subtracts 150 from 160, reading 'both' as the difference between the two counts; 75 halves the 150 part timers, assuming that independence means they split evenly between cyclists and non cyclists, which would need exactly half the workforce to cycle.
- (a) 0.48 — There are two ways to score exactly one throw: scoring on the first and missing the second, 0.6 × 0.4 = 0.24, or missing the first and scoring the second, 0.4 × 0.6 = 0.24. Adding these gives 0.24 + 0.24 = 0.48. Choosing 0.24 comes from working out only one of the two paths and forgetting the other one also gives exactly one score. Choosing 0.36 comes from working out the probability of scoring BOTH throws, 0.6 × 0.6 = 0.36, instead of exactly one. Choosing 0.84 comes from working out the probability of scoring AT LEAST one throw, 1 − 0.4 × 0.4 = 0.84, instead of exactly one.
- (c) No — 7/30 is the relative frequency; theory stays 1/6. — The theoretical probability of rolling a 6 on an ordinary dice is fixed at 1/6, worked out from the number of equally likely outcomes, and does not change however the dice is actually rolled. The relative frequency from this trial is 7/30, found from what happened in these particular 30 rolls. Since 7/30 and 1/6 are different numbers, the correct statement is 'No — 7/30 is the relative frequency; theory stays 1/6.' Assuming the two values must always match because they describe the same event gives 'Yes — relative frequency always equals theory.' Believing that an observed result redefines the theoretical probability gives 'Yes — the theoretical probability has now become 7/30.' Refusing to work out either value at all gives 'Neither can be found — 30 rolls is too few to tell', which ignores that both numbers CAN be calculated from the information given.
Build your own mix at the worksheet builder.