Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) (48/52) × (47/51) — Method: for two deals one after the other with nothing put back, multiply the probability of the first by the probability of the second worked out from the cards that are left. Working: 52 − 4 = 48 cards are not aces, so the first card is not an ace with probability 48/52. One card has now gone and it was not an ace, so 51 cards remain and 47 of them are not aces, giving 47/51. Answer: the probability is (48/52) × (47/51). The distractors: (48/52) × (48/52) comes from leaving the pack at 52 cards for the second deal, which is only true if the first card is replaced; (4/52) × (3/51) comes from working out the probability that both cards ARE aces instead of neither; (4/52) × (4/51) comes from the same misreading with the ace count left at 4 while the total is reduced, adjusting only half of the second fraction.
- (a) 12/25 — P(red then blue) = 4/10 × 6/10 = 24/100. P(blue then red) is the same, 6/10 × 4/10 = 24/100. Since either order counts as different colours, add them: 24/100 + 24/100 = 48/100 = 12/25. Working out only one order, red-then-blue, and forgetting blue-then-red, gives 24/100 = 6/25. Working out the probability that the two counters are the SAME colour instead — 4/10 × 4/10 + 6/10 × 6/10 = 16/100 + 36/100 = 52/100 = 13/25 — answers a different question. Using 6/9 for the second draw, as if the first counter were not replaced, gives 2 × (4/10 × 6/9) = 48/90 = 8/15.
- (b) 15/32 — Method: there are two ways to get one of each colour, red then blue and blue then red. Work out the probability of each path by multiplying, then add the two paths. Working: red then blue is 5/8 × 3/8 = 15/64, and blue then red is 3/8 × 5/8 = 15/64. Adding the two paths gives 30/64. Answer: the probability is 15/32. The distractors: 15/64 comes from working out red then blue only and forgetting that blue then red also gives one of each; 15/28 comes from doubling correctly but reducing the total to 7 for the second spin, which is what happens to a bag when an item is kept out, not to a spinner; 39/64 comes from working from the opposite event and subtracting only the two-red case, 1 − 25/64, leaving the two-blue case inside the answer.
- (c) 100 — There are 3 even numbers on a fair dice (2, 4 and 6), so the probability of landing on an even number is 3/6 = 1/2, and 300 × 1/2 = 150. The probability of landing on a six is 1/6, so 300 × 1/6 = 50. The dice is expected to land on an even number 150 − 50 = 100 more times than on a six. Writing 50 is wrong because that is just the expected number of sixes on its own, without comparing it to the expected number of evens. Writing 150 is wrong because that is just the expected number of evens on its own, without subtracting the sixes. Writing 200 is wrong because it adds the two expected frequencies together (150 + 50 = 200) instead of finding the difference between them. The dice is expected to land on an even number 100 more times than on a six.
- (c) 28 — Reading only is 22 − 6 = 16, and gaming only is 18 − 6 = 12, so exactly one of the two is 16 + 12 = 28. Adding 22 and 18 without removing the 6 who like both, 22 + 18 = 40, counts those 6 students twice. Giving 6 mistakes the number who like both for the number who like exactly one. Finding 22 + 18 − 6 = 34 gives the number who like at least one of reading or gaming, but stops there instead of also removing the 6 who like both to leave only those who like exactly one.
- (c) 0.15 — Method: for two independent events, multiply along the branches of the tree to find the probability of both outcomes happening together. Working: P(red and heads) = P(red) × P(heads) = 0.3 × 0.5 = 0.15. Answer: 0.15. Watch out: adding the two probabilities, 0.3 + 0.5 = 0.8, does not give the probability of both — probabilities along one path of a tree are multiplied, not added. Writing down 0.5 ignores the spinner altogether and gives only the coin's probability. And writing down 0.65 is the probability of red OR heads, which is 0.3 + 0.5 − 0.15 = 0.65, a different question from the one asked here.
- (a) 50 — To find the number of shots needed for an expected 12 hits, divide the number of hits wanted by the probability of a hit: 12 ÷ 0.24 = 50. Multiplying the number of hits by the probability instead of dividing gives 12 × 0.24 = 2.88, which rounds to 3 shots. Rounding 0.24 to 0.25 before dividing gives 12 ÷ 0.25 = 48. Using the probability of missing, 1 − 0.24 = 0.76, instead of the probability of hitting, gives 12 ÷ 0.76 = 15.79, which rounds to 16.
- (d) 1/3 — List the outcomes for the two spinners systematically in a 3 × 3 grid: 1-1, 1-2, 1-3, 2-1, 2-2, 2-3, 3-1, 3-2, 3-3, where the first number is the score on spinner A and the second is the score on spinner B — 9 equally likely outcomes in total. The pairs where the two numbers are the same are 1-1, 2-2 and 3-3, so there are 3 favourable outcomes. P(same number) = 3/9 = 1/3. 2/3 comes from working out the probability that the two numbers are different and then forgetting to take the complement the right way round, so the probability of "different" is given instead of the probability of "same". 1/2 comes from listing only the 6 unordered pairs 1-1, 2-2, 3-3, 1-2, 1-3, 2-3 instead of all 9 ordered outcomes in the grid, then taking 3 out of that 6. 1/9 comes from spotting only one of the three matching pairs, such as 1-1, and missing 2-2 and 3-3.
- (c) 15/23 — Method: find P(rough and delayed) and the overall P(delayed) using the tree, then divide. Working: P(rough and delayed) = 0.2 × 0.75 = 0.15. P(calm and delayed) = 0.8 × 0.1 = 0.08. P(delayed) = 0.15 + 0.08 = 0.23. P(rough | delayed) = 0.15 ÷ 0.23 = 15/23. Answer: 15/23. Watch out: leaving the answer as 0.15 (3/20) gives P(rough and delayed) itself, without dividing by the overall probability that a crossing is delayed. Giving 0.75 (3/4) is the probability you were told to start with — that a crossing is delayed GIVEN the sea is rough — which is the reverse of what's being asked. And 0.2 (1/5) is just the original probability that the sea is rough, before you take the fact that the crossing was delayed into account.
- (b) £13.50 — The total cost of Nadia's 25 tickets is 25 × £1.50 = £37.50. The expected number of winning tickets is 25 × 0.12 = 3, so the expected prize money is 3 × £8 = £24.00. Nadia's expected loss is the cost minus the expected prize money: £37.50 − £24.00 = £13.50. A candidate who answers £24.00 has given the expected prize money and mistaken it for the loss. A candidate who answers £37.50 has given the total cost of the tickets, forgetting to subtract the expected prize money. A candidate who answers £34.50 has subtracted the expected number of wins, 3, from the cost instead of first converting it to prize money by multiplying by £8.
- (d) 1/8 — The multiples of 3 from 1 to 8 are 3 and 6, so the probability of that event is 2/8, which simplifies to 1/4. The probability of the coin landing on heads is 1/2. Since the spin and the toss are independent, multiply the two probabilities: 1/4 × 1/2 = 1/8. A candidate who answers 1/4 has considered only the spinner and forgotten to combine it with the coin toss. A candidate who answers 1/2 has considered only the coin and forgotten the spinner condition entirely. A candidate who answers 1/16 has counted only one number, 6, as a multiple of 3 instead of two, giving 1/8 × 1/2.
- (c) 0.31 — Method: a late bus can be reached along two paths of the tree. Multiply along each path, then add the paths that end in a late bus. Working: the rain path gives 0.3 × 0.8 = 0.24. No rain has probability 1 − 0.3 = 0.7, so the second path gives 0.7 × 0.1 = 0.07. Adding the two paths gives 0.24 + 0.07. Answer: the probability is 0.31. The distractors: 0.9 comes from adding the two branch probabilities 0.8 and 0.1 without first weighting them by how often it rains; 0.24 comes from following the rain path only and ignoring that the bus can also be late when it is dry; 0.27 comes from using 0.3 at the start of both paths, so that the no-rain path is given 0.3 × 0.1 instead of 0.7 × 0.1.
- (d) 5/12 — The possible totals are 2 to 12. The prime totals are 2, 3, 5, 7 and 11, with 1, 2, 4, 6 and 2 ways to make them, giving 1 + 2 + 4 + 6 + 2 = 15 outcomes out of 36, so the probability is 15/36 = 5/12. Choosing 7/18 comes from forgetting that a total of 2 counts as prime, giving 14/36 = 7/18 instead. Choosing 19/36 comes from wrongly including a total of 9 as a prime number, adding its 4 ways to the correct 15 to get 19/36. Choosing 13/36 comes from forgetting the 2 ways of making a total of 11, giving 13/36 instead of 15/36.
- (b) 5/12 — There are 36 equally likely ordered pairs. Listing the pairs where the red score is smaller than the blue score gives 15 outcomes, so the probability is 15/36 = 5/12. Choosing 1/2 comes from assuming the 36 outcomes split evenly between 'red smaller' and 'red bigger', which ignores the 6 outcomes where the two dice show the same score. Choosing 7/12 comes from including the outcomes where the two scores are equal, 15 + 6 = 21, giving 21/36 = 7/12, instead of using 'less than' strictly. Choosing 5/36 comes from counting only the outcomes where the two scores differ by exactly 1, such as (1, 2) and (2, 3), which is 5 outcomes, and missing the pairs that differ by more than 1.
- (b) 3 pupils — Method: an expected frequency is the probability multiplied by the number of trials, so multiply the probability by the number of pupils. Working: 30 × 1/10 means finding one tenth of 30, and 30 ÷ 10 = 3. Answer: 3 pupils would be expected to have a nut allergy. The distractors: 27 pupils comes from working out how many are expected NOT to have the allergy, 30 − 3, instead of how many are; 10 pupils comes from reading the 10 in the fraction 1/10 as the number of pupils; 1 pupil comes from reading the numerator of the fraction as the expected number.
Build your own mix at the worksheet builder.