Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (a) 1276 — Method: an unbiased relative frequency tends towards the theoretical probability as the number of trials increases, so use the record resting on the most trials, then multiply by the number of new trials. Working: the three records rest on 50, 200 and 1000 drops, so the most reliable is the one after 1000 drops, namely 0.638, and the run is indeed settling as the trials increase. The expected number of point up landings in 2000 further drops is 2000 × 0.638 = 1276. Answer: about 1276 times. The distractors: 1440 uses the earliest record, which rests on only 50 drops, giving 2000 × 0.720 = 1440; 1330 uses the middle record, treating 200 drops as a safe compromise when 1000 drops is better still, giving 2000 × 0.665 = 1330; 1348 comes from averaging the three records, since 0.720 + 0.665 + 0.638 = 2.023 and 2.023 ÷ 3 = 0.674, then 2000 × 0.674 = 1348, which gives the 50 drop record the same weight as the 1000 drop record.
- (c) 500 — Method: the expected number of successes is the number of trials multiplied by the probability, so to find the number of trials, divide the expected number by the probability. Working: let n be the number of seeds planted. Then n multiplied by 0.6 must come to 300, so n = 300 ÷ 0.6 = 500. Answer: the grower should plant 500 seeds. The distractors: 180 comes from multiplying instead of dividing, 300 × 0.6 = 180, which answers how many of 300 seeds would germinate; 750 comes from dividing by the probability of not germinating, 300 ÷ 0.4 = 750; 120 comes from multiplying by that same 0.4, 300 × 0.4 = 120.
- (b) 50 — There are 180 − 100 = 80 south-plot gardeners. 30 of them do not grow organically, so the rest do: 80 − 30 = 50. Writing 64 is wrong because that is the number of NORTH-plot gardeners who grow organically, not south. Writing 30 again is wrong because that is the number of south-plot gardeners who do NOT grow organically — the question asks for those who do. Writing 80 is wrong because that is the whole south-plot total, without subtracting the 30 who do not grow organically. The answer is 50.
- (b) 1/4 — There are 4 × 4 = 16 equally likely ordered outcomes for the two dice. The pairs that total 5 are: first dice 1 with second dice 4; first dice 2 with second dice 3; first dice 3 with second dice 2; and first dice 4 with second dice 1 — which is 4 outcomes, so the probability is 4/16 = 1/4. A candidate who answers 1/8 has listed only 2 of the four pairs, forgetting that first dice 1 with second dice 4 and first dice 4 with second dice 1 are separate outcomes because the dice are different. A candidate who answers 3/16 has found 3 pairs instead of 4, missing one from the list. A candidate who answers 1/16 has counted only a single pair, such as first dice 2 with second dice 3, and treated the order of the dice as not mattering.
- (c) 30 — The numbers less than 4 are 1, 2 and 3, so the probability of that event is 3/6, and the expected count in 90 rolls is 90 × 3/6 = 45. The probability of rolling a 6 is 1/6, and the expected count is 90 × 1/6 = 15. The difference between the two expected counts is 45 − 15 = 30. A candidate who answers 45 has given the expected count for 'less than 4' only, forgetting to subtract the other expected count. A candidate who answers 15 has given the expected count for '6' only. A candidate who answers 36 has used a dice with 5 possible numbers instead of 6, giving 90 × 3/5 = 54 and 90 × 1/5 = 18, a difference of 36.
- (c) 7/8 — Method: 'at least one head' is the opposite of 'no heads at all', so work out the probability of three tails and take it away from 1. Working: a flip that is not a head has probability 1/2, and the flips are independent, so three tails in a row has probability 1/2 × 1/2 × 1/2 = 1/8. Taking this from 8/8 leaves 7/8. Answer: the probability is 7/8. The distractors: 1/8 is the probability of three tails, written down without the final subtraction; 3/8 is the probability of exactly one head, which comes from reading 'at least one' as 'exactly one'; 1/2 comes from giving the probability of a head on a single flip and ignoring that three flips are made.
- (a) 0.2 — Method: for independent events, the probability that both happen is the product of the two probabilities. Working: the first set is green with probability 0.4 and the second with probability 0.5, so the calculation is 0.4 × 0.5. Since 4 × 5 = 20 and the two factors carry one decimal place each, the product carries two. Answer: the probability is 0.2. The distractors: 0.9 comes from adding 0.4 and 0.5 instead of multiplying them; 0.45 comes from averaging the two probabilities; 0.1 comes from subtracting 0.4 from 0.5, treating the question as a difference.
- (c) 325 — Method: first find the relative frequency of NOT landing on red from the 200 spins, then scale that up to 500 spins. Working: non-red results = 50 + 80 = 130, out of 200 spins, so P(not red) = 130 ÷ 200 = 0.65. Expected non-red results in 500 spins = 500 × 0.65 = 325. Answer: 325. Watch out: writing down 175 finds the expected number of RED results instead, 70 ÷ 200 × 500 = 175, answering the opposite of what was asked. Writing down 250 assumes landing red or not landing red must be a fair 50-50 split, but the spinner is biased and the actual results do not split evenly. And writing down 130 stops after finding how many of the 200 spins were non-red and forgets to scale that figure up to the 500 spins asked for.
- (b) 60 — Method: independence means the proportion of part timers among the cyclists is the same as the proportion among all the employees, so find that proportion and apply it to the cyclists. Working: 150 of the 400 employees work part time, which is a proportion of 0.375. Applying it to the 160 cyclists gives 0.375 × 160 = 60 employees. Answer: you would expect 60 employees. The distractors: 310 adds 150 and 160, treating the group who do both as everyone who does one thing or the other; 10 subtracts 150 from 160, reading 'both' as the difference between the two counts; 75 halves the 150 part timers, assuming that independence means they split evenly between cyclists and non cyclists, which would need exactly half the workforce to cycle.
- (c) 100 — There are 3 even numbers on a fair dice (2, 4 and 6), so the probability of landing on an even number is 3/6 = 1/2, and 300 × 1/2 = 150. The probability of landing on a six is 1/6, so 300 × 1/6 = 50. The dice is expected to land on an even number 150 − 50 = 100 more times than on a six. Writing 50 is wrong because that is just the expected number of sixes on its own, without comparing it to the expected number of evens. Writing 150 is wrong because that is just the expected number of evens on its own, without subtracting the sixes. Writing 200 is wrong because it adds the two expected frequencies together (150 + 50 = 200) instead of finding the difference between them. The dice is expected to land on an even number 100 more times than on a six.
- (a) 12/25 — P(red then blue) = 4/10 × 6/10 = 24/100. P(blue then red) is the same, 6/10 × 4/10 = 24/100. Since either order counts as different colours, add them: 24/100 + 24/100 = 48/100 = 12/25. Working out only one order, red-then-blue, and forgetting blue-then-red, gives 24/100 = 6/25. Working out the probability that the two counters are the SAME colour instead — 4/10 × 4/10 + 6/10 × 6/10 = 16/100 + 36/100 = 52/100 = 13/25 — answers a different question. Using 6/9 for the second draw, as if the first counter were not replaced, gives 2 × (4/10 × 6/9) = 48/90 = 8/15.
- (a) unlikely — 3/8 = 3 ÷ 8 = 0.375, which is between 0 and 0.5, so the probability is best described as unlikely. Rounding 3/8 loosely to 'about a half' without converting it properly leads to evens, which is wrong since 0.375 is noticeably below 0.5. Reading 3/8 as the complement and using 1 − 3/8 = 5/8 = 0.625 instead gives likely, but the question asks about the probability of 3/8 itself, not its complement. Flipping the fraction to 8/3 ≈ 2.67, which is impossible for a probability, and rounding it towards the top of the scale gives certain.
- (c) 7/19 — Method: 'at least two black' covers two cases — all three black, and exactly two black. Work out the probability of each along a tree, add them, then use P(all three black | at least two black) = P(all three black) ÷ P(at least two black). Working: P(all three black) = 9/13 × 8/12 × 7/11 = 504/1716 = 42/143. For exactly two black, one order is black, black, white = 9/13 × 8/12 × 4/11 = 288/1716; the white sock could be drawn first, second or third, so there are 3 such orders, giving 3 × 288/1716 = 864/1716 = 72/143. P(at least two black) = 42/143 + 72/143 = 114/143. P(all three black | at least two black) = (42/143) ÷ (114/143) = 42/114 = 7/19. Answer: 7/19. Watch out: stopping at 42/143 gives the unconditioned probability that all three are black — it ignores that you already know at least two of them are. Dividing by the 'exactly two black' probability on its own gives 7/12, and forgets that the all-black outcomes are themselves part of the 'at least two black' group, so they must be inside the denominator, not left out of it. And 7/11 answers a different, easier question — the probability the THIRD sock is black given the FIRST TWO specifically are black — not 'at least two of the three, in any order, are black'.
- (a) 0.09 — Method: two independent events that must both happen are combined by multiplying their probabilities. Working: the same probability 0.3 applies to each day, so the calculation is 0.3 × 0.3. Written as fractions this is 3/10 × 3/10 = 9/100. Answer: the probability is 0.09. The distractors: 0.6 comes from adding 0.3 and 0.3 instead of multiplying them; 0.3 comes from quoting the single-day probability, as though the second day added no further condition; 0.9 comes from multiplying 3 by 3 correctly but keeping only one decimal place in the product instead of two.
- (d) 56 — Method: count the trials over the whole period first, then multiply the number of trials by the probability. Working: 4 weeks is 4 × 7 = 28 days, and at 25 trains a day that is 25 × 28 = 700 trains. The expected number of late trains is 700 × 0.08 = 56. Answer: about 56 late trains over the 4 weeks. The distractors: 2 is the expected number for a single day, 25 × 0.08 = 2, with the 28 days never brought in; 14 uses one week instead of four, 25 × 7 × 0.08 = 14; 644 is 700 − 56 and counts the trains expected to be on time.
Build your own mix at the worksheet builder.