Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) 56 — Method: count the trials over the whole period first, then multiply the number of trials by the probability. Working: 4 weeks is 4 × 7 = 28 days, and at 25 trains a day that is 25 × 28 = 700 trains. The expected number of late trains is 700 × 0.08 = 56. Answer: about 56 late trains over the 4 weeks. The distractors: 2 is the expected number for a single day, 25 × 0.08 = 2, with the 28 days never brought in; 14 uses one week instead of four, 25 × 7 × 0.08 = 14; 644 is 700 − 56 and counts the trains expected to be on time.
- (c) 28 — Reading only is 22 − 6 = 16, and gaming only is 18 − 6 = 12, so exactly one of the two is 16 + 12 = 28. Adding 22 and 18 without removing the 6 who like both, 22 + 18 = 40, counts those 6 students twice. Giving 6 mistakes the number who like both for the number who like exactly one. Finding 22 + 18 − 6 = 34 gives the number who like at least one of reading or gaming, but stops there instead of also removing the 6 who like both to leave only those who like exactly one.
- (c) 0.25 — Method: P(B | A) = P(A and B) ÷ P(A). Working: P(B | A) = 0.15 ÷ 0.6 = 0.25. Answer: 0.25. Watch out: multiplying 0.6 by 0.15 instead of dividing gives 0.09, and subtracting 0.15 from 0.6 gives 0.45 — neither uses the conditional probability formula. Leaving the answer as 0.15 mistakes the probability of A and B happening together for the probability of B once you already know A has happened — those are different quantities.
- (b) 10 — Method: A′ means everything in the universal set that is NOT in A, so n(A′) = n(universal set) − n(A). Working: the universal set has 15 elements. A = {3, 6, 9, 12, 15}, so n(A) = 5. n(A′) = 15 − 5 = 10. Answer: 10. Watch out: writing down 5 gives n(A) itself, the size of the multiples-of-3 set, which is the opposite of its complement. Writing down 11 comes from missing 15 off the list of multiples of 3, treating A as only {3, 6, 9, 12}, so A is undercounted as 4 and A′ is overstated as 15 − 4. And writing down 12 comes from only listing the multiples of 3 up to 9 — 3, 6 and 9 — and missing that 12 and 15 also belong to A, undercounting A as 3 rather than 5.
- (d) 12/17 — Method: the person picked is known to have passed, so the sample space is everyone who passed; divide the course takers who passed by that total. Working: 120 course takers and 50 others passed, so 170 people passed. The course takers who passed give 120/170, and dividing the numerator and the denominator by 10 gives 12/17. Answer: the probability is 12/17. The distractors: 4/5 is 120/150, the probability that someone passed given that they took the course, which reverses the condition and the event; 12/25 is 120/250, dividing by everyone who sat the test rather than by the 170 who passed; 17/25 is 170/250, the probability that a person picked from everyone sitting the test passed, which answers a different question altogether.
- (d) 1/4 — Method: a product is odd only when BOTH factors are odd, so list the ordered pairs where both scores are odd and divide by 36. Working: the odd scores on a dice are 1, 3 and 5, so there are 3 × 3 = 9 ordered pairs where both scores are odd, out of the 36 equally likely pairs, cancelling down to 1/4. Answer: 1/4. Watch out: writing down 3/4 finds the probability that AT LEAST ONE score is odd, 1 minus the probability both are even, which is a different, easier condition to meet than both being odd. Considering only the first dice's score and ignoring the second gives 1/2, since 3 of the first dice's 6 scores are odd — but the product also depends on what the second dice shows. And writing down 1/12 comes from counting only the pairs where the SAME odd number appears twice, (1, 1), (3, 3) and (5, 5), missing pairs like (1, 3) and (5, 1) where the two odd scores differ.
- (b) 0.225 — The relative frequency of rain is the number of rainy days out of all days recorded: 9 ÷ 40 = 0.225, which is noticeably less than the forecaster's claimed 0.3. Using the number of dry days, 40 − 9 = 31, as the denominator instead of the total of 40 gives 9 ÷ 31 = 0.29 (2 d.p.). Simply reporting the forecaster's claimed value, 0.3, without calculating anything from the data at all, ignores the recorded results completely. Misplacing the decimal point, treating 9 out of 40 as 9%, gives 0.09 instead of 0.225.
- (d) 3/36 — Method: list the results as ordered pairs, decide which totals satisfy the condition, count the pairs that give those totals and divide by the number of pairs there are. Working: there are 6 × 6 = 36 equally likely ordered pairs. Greater than 10 means a total of 11 or a total of 12. A total of 11 comes from (5, 6) and (6, 5); a total of 12 comes from (6, 6) alone, because both dice must show a 6. That is 2 + 1 = 3 pairs out of the 36. Answer: the probability is 3/36. The distractors: 2/36 comes from counting the two ways of making 11 and forgetting that 12 is greater than 10 as well; 4/36 comes from writing (6, 6) down twice, applying the rule that a pair can be turned round to a double that can only happen one way; 33/36 comes from reading the condition the wrong way round and giving the probability that the total is 10 or less.
- (c) 15/23 — Method: find P(rough and delayed) and the overall P(delayed) using the tree, then divide. Working: P(rough and delayed) = 0.2 × 0.75 = 0.15. P(calm and delayed) = 0.8 × 0.1 = 0.08. P(delayed) = 0.15 + 0.08 = 0.23. P(rough | delayed) = 0.15 ÷ 0.23 = 15/23. Answer: 15/23. Watch out: leaving the answer as 0.15 (3/20) gives P(rough and delayed) itself, without dividing by the overall probability that a crossing is delayed. Giving 0.75 (3/4) is the probability you were told to start with — that a crossing is delayed GIVEN the sea is rough — which is the reverse of what's being asked. And 0.2 (1/5) is just the original probability that the sea is rough, before you take the fact that the crossing was delayed into account.
- (b) 8/35 — Method: the pupil picked is known to play at least one of the two sports, so first count how many pupils that is, then divide the number who play both by it. Working: 25 play football and 18 play tennis, but the 8 who play both have been counted in each figure, so the number who play at least one sport is 25 + 18 minus 8, which is 35. The pupils who play both give 8/35, which will not cancel. Answer: the probability is 8/35. The distractors: 2/15 is 8/60, dividing by the whole year group instead of by the 35 pupils who play at least one sport; 8/43 uses 25 + 18 as the denominator, forgetting that the 8 pupils who play both have been counted twice; 8/25 conditions on the footballers alone, answering the probability that a footballer also plays tennis rather than using every pupil who plays a sport.
- (a) 3,860 — The probability a bulb works correctly is the complement of being defective: 1 − 0.035 = 0.965. Expected number working correctly = 0.965 × 4,000 = 3,860. Using the probability of being defective instead of its complement gives 4,000 × 0.035 = 140, the expected number of DEFECTIVE bulbs, not working ones. Shifting the decimal point in the complement, using 0.0965 instead of 0.965, gives 4,000 × 0.0965 = 386. Assuming every bulb works, ignoring the 0.035 probability altogether, gives the full batch of 4,000.
- (d) 36/91 — Method: P(both red | same colour) = P(both red) ÷ P(same colour), where P(same colour) = P(both red) + P(both green). Working: P(both red) = 9/20 × 8/19 = 72/380 = 18/95. P(both green) = 11/20 × 10/19 = 110/380 = 11/38. P(same colour) = 18/95 + 11/38 = 36/190 + 55/190 = 91/190. P(both red | same colour) = (36/190) ÷ (91/190) = 36/91. Answer: 36/91. Watch out: stopping at 18/95 gives P(both red) itself, without dividing by the probability that the colours matched at all. Working out 55/91 finds the same-colour probability for green instead of red — check which colour's count you are putting on top. And 9/20 is just the chance the first ball drawn is red, which ignores the second draw and the without-replacement condition completely.
- (a) 20 — Dice A is fair, so its expected number of sixes is 150 × 1/6 = 25. Dice B has P(6) = 0.3, so its expected number of sixes is 150 × 0.3 = 45. The difference is 45 − 25 = 20. Adding the two expected values instead of subtracting them gives 25 + 45 = 70. Reporting Dice B's expected sixes on their own, without comparing to Dice A, gives 45. Using the fair probability 1/6 for Dice B as well as Dice A ignores the bias altogether, giving 150 × 1/6 = 25 for both dice and a difference of 0.
- (c) 11/20 — 'Red or white' combines two mutually exclusive events, so add their probabilities: 3/10 = 6/20 and 1/4 = 5/20, giving 6/20 + 5/20 = 11/20. Multiplying the two probabilities instead of adding them, 3/10 × 1/4, gives 3/40, which would be the probability of red and white together, not red or white — and a bead can't be both colours. Subtracting the sum from 1, 1 − 11/20 = 9/20, gives the probability of the bead being black instead of red or white. Converting 1/4 as 4/20 instead of 5/20 (dividing 20 by 4 but forgetting to scale the numerator) gives 6/20 + 4/20 = 1/2.
- (b) Organiser favoured — expected pay-out is under £1 — The expected pay-out per game is the prize times the probability of winning: £4 × 1/5 = £0.80. The expected income per game is the £1 entry fee, which the organiser collects regardless of the result. Since £0.80 is less than £1, the game favours the organiser, because the expected pay-out is under £1. The claim that the game favours the player, because the pay-out is over £1, is wrong on both counts — the pay-out is not over £1, and it is the organiser who benefits. The claim that the organiser is favoured because the pay-out is over £1 reaches the right side but the wrong reason: £0.80 is under £1, not over it. The claim that the two expected amounts are equal is also wrong: £0.80 and £1 are different amounts, so the game is not fair to both sides.
Build your own mix at the worksheet builder.