Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) 0.225 — The relative frequency of rain is the number of rainy days out of all days recorded: 9 ÷ 40 = 0.225, which is noticeably less than the forecaster's claimed 0.3. Using the number of dry days, 40 − 9 = 31, as the denominator instead of the total of 40 gives 9 ÷ 31 = 0.29 (2 d.p.). Simply reporting the forecaster's claimed value, 0.3, without calculating anything from the data at all, ignores the recorded results completely. Misplacing the decimal point, treating 9 out of 40 as 9%, gives 0.09 instead of 0.225.
- (d) 1/12 — Method: list the full possibility space of sandwich-and-drink pairs, then divide the one matching pair by the size of the whole space. Working: there are 3 × 4 = 12 equally likely sandwich-and-drink pairs, and exactly one of them is egg and water. Answer: 1/12. Watch out: writing down 1/7 comes from adding the two counts, 3 + 4 = 7, instead of multiplying them to build the possibility space. Writing down 1/3 uses only the chance of choosing egg out of 3 sandwiches and ignores the drink altogether. And writing down 1/4 uses only the chance of choosing water out of 4 drinks and ignores the sandwich altogether.
- (b) 1/10 — Method: list every possible pair of subjects systematically, so that no pair is missed and no pair is counted twice, then compare the number of successful pairs with the size of the list. Working: pairing maths with each of the other four gives 4 pairs, physics with each subject after it gives 3, biology gives 2 and chemistry gives 1, so there are 4 + 3 + 2 + 1 = 10 pairs. Exactly one of them is maths with biology. Answer: the probability is 1/10. The distractors: 1/5 comes from counting maths-then-biology and biology-then-maths as two separate successes while still dividing by the 10 unordered pairs; 1/15 comes from a list that also pairs each subject with itself, giving 15 entries instead of 10; 1/4 comes from working out the second step alone, that 1 of the 4 subjects left after maths is biology, without allowing for the chance that maths is picked at all.
- (b) 0.0309 — Method: P(both defective | at least one defective) = P(both defective) ÷ P(at least one defective). Find each using independence: P(both) = 0.06², P(at least one) = 1 − P(neither) = 1 − 0.94². Working: P(both) = 0.06² = 0.0036. P(neither) = 0.94² = 0.8836, so P(at least one) = 1 − 0.8836 = 0.1164. P(both | at least one) = 0.0036 ÷ 0.1164 = 0.0309 (3 s.f.). Answer: 0.0309. Watch out: leaving the answer as 0.0036 gives P(both defective) itself, not the probability once you already know at least one is defective — you still need to divide by P(at least one defective). Giving 0.0600 answers with the single-component defect rate, ignoring the condition altogether. And 0.5000 assumes that 'at least one' makes the outcomes 'exactly one defective' and 'both defective' equally likely, which is not how these probabilities combine.
- (d) 3/10 — Method: list the full possibility space as pairs of coin and spinner results, then count how many pairs satisfy both conditions and divide by the size of the whole space. Working: the coin gives 2 outcomes and the spinner gives 5, so the full space has 2 × 5 = 10 equally likely pairs. The pairs with a tail and an odd number are (T,1), (T,3) and (T,5), which is 3 out of 10. Answer: 3/10. Watch out: writing down 1/2 uses only the coin's own chance of a tail and ignores that the spinner also has to land on an odd number. Writing down 3/5 uses only the spinner's chance of landing on an odd number and ignores the coin altogether. And writing down 1/10 counts just one matching outcome, such as (T,1), instead of all three pairs that satisfy both conditions.
- (b) 60 — Method: independence means the proportion of part timers among the cyclists is the same as the proportion among all the employees, so find that proportion and apply it to the cyclists. Working: 150 of the 400 employees work part time, which is a proportion of 0.375. Applying it to the 160 cyclists gives 0.375 × 160 = 60 employees. Answer: you would expect 60 employees. The distractors: 310 adds 150 and 160, treating the group who do both as everyone who does one thing or the other; 10 subtracts 150 from 160, reading 'both' as the difference between the two counts; 75 halves the 150 part timers, assuming that independence means they split evenly between cyclists and non cyclists, which would need exactly half the workforce to cycle.
- (d) 1/4 — Method: a product is odd only when BOTH factors are odd, so list the ordered pairs where both scores are odd and divide by 36. Working: the odd scores on a dice are 1, 3 and 5, so there are 3 × 3 = 9 ordered pairs where both scores are odd, out of the 36 equally likely pairs, cancelling down to 1/4. Answer: 1/4. Watch out: writing down 3/4 finds the probability that AT LEAST ONE score is odd, 1 minus the probability both are even, which is a different, easier condition to meet than both being odd. Considering only the first dice's score and ignoring the second gives 1/2, since 3 of the first dice's 6 scores are odd — but the product also depends on what the second dice shows. And writing down 1/12 comes from counting only the pairs where the SAME odd number appears twice, (1, 1), (3, 3) and (5, 5), missing pairs like (1, 3) and (5, 1) where the two odd scores differ.
- (a) 5/8 — Winning, near-miss and losing are exhaustive, so the three probabilities sum to 1. Writing 1/4 as 2/8 so every fraction has the same denominator, 1 − 1/8 − 2/8 = 8/8 − 1/8 − 2/8 = 5/8. Subtracting only the winning probability and forgetting the near-miss probability gives 1 − 1/8 = 7/8. Subtracting only the near-miss probability and forgetting the winning probability gives 1 − 1/4 = 3/4. Adding the two given probabilities and stopping there gives 1/8 + 2/8 = 3/8, the probability that a ticket is winning or a near-miss, not the probability that it is losing.
- (c) 0.04 — Method: 'made by machine B and faulty' is the second branch of a tree followed after the first, so multiply the probability of machine B by the probability of a fault given machine B. Working: machine B makes 0.4 of the bolts, and 0.1 of those bolts are faulty, so the probability is 0.4 × 0.1 = 0.04. Answer: the probability is 0.04. The distractors: 0.5 comes from adding 0.4 and 0.1 instead of multiplying, treating two stages of one journey as two separate outcomes; 0.1 gives the fault rate for machine B on its own, as though every bolt in the factory came from machine B, so the 40% share is never used; 0.07 is 0.6 × 0.05 added to 0.4 × 0.1, the probability that a bolt is faulty whichever machine made it, which answers a question about all the production rather than about machine B.
- (d) 1/5 — Method: list the pairs systematically, work out each total, then count the pairs that meet the condition and compare that count with the length of the list. Working: the pairs and their totals are 1 and 2 giving 3, 1 and 3 giving 4, 1 and 4 giving 5, 1 and 5 giving 6, 2 and 3 giving 5, 2 and 4 giving 6, 2 and 5 giving 7, 3 and 4 giving 7, 3 and 5 giving 8, and 4 and 5 giving 9. That is 10 pairs, of which 2 have a total of more than 7. Answer: the probability is 1/5. The distractors: 2/5 comes from counting the totals of exactly 7 as well, reading 'more than 7' as '7 or more'; 1/10 comes from finding only the pair 4 and 5 and missing that 3 and 5 also beat 7; 4/5 comes from counting the pairs on the wrong side of the condition, the 8 pairs whose total is 7 or less.
- (b) (48/52) × (47/51) — Method: for two deals one after the other with nothing put back, multiply the probability of the first by the probability of the second worked out from the cards that are left. Working: 52 − 4 = 48 cards are not aces, so the first card is not an ace with probability 48/52. One card has now gone and it was not an ace, so 51 cards remain and 47 of them are not aces, giving 47/51. Answer: the probability is (48/52) × (47/51). The distractors: (48/52) × (48/52) comes from leaving the pack at 52 cards for the second deal, which is only true if the first card is replaced; (4/52) × (3/51) comes from working out the probability that both cards ARE aces instead of neither; (4/52) × (4/51) comes from the same misreading with the ace count left at 4 while the total is reduced, adjusting only half of the second fraction.
- (a) 1/10 — There are 4 × 5 = 20 equally likely outcomes in total. The pairs whose product is 12 are Spinner A showing 3 with Spinner B showing 4, and Spinner A showing 4 with Spinner B showing 3, which is 2 outcomes, giving a probability of 2/20 = 1/10. Choosing 1/20 comes from finding only one of the two pairs, (3, 4), and missing (4, 3) as a separate outcome. Choosing 1/8 comes from using 16 as the total number of outcomes, 4 × 4, forgetting that Spinner B has 5 sections rather than 4. Choosing 1/5 comes from listing the factor pairs of 12 as 2 × 6 and 3 × 4 and counting each one in both orders, (2, 6), (6, 2), (3, 4) and (4, 3), giving 4 outcomes out of 20 without checking that neither spinner has a 6 on it.
- (c) 7/19 — Method: 'at least two black' covers two cases — all three black, and exactly two black. Work out the probability of each along a tree, add them, then use P(all three black | at least two black) = P(all three black) ÷ P(at least two black). Working: P(all three black) = 9/13 × 8/12 × 7/11 = 504/1716 = 42/143. For exactly two black, one order is black, black, white = 9/13 × 8/12 × 4/11 = 288/1716; the white sock could be drawn first, second or third, so there are 3 such orders, giving 3 × 288/1716 = 864/1716 = 72/143. P(at least two black) = 42/143 + 72/143 = 114/143. P(all three black | at least two black) = (42/143) ÷ (114/143) = 42/114 = 7/19. Answer: 7/19. Watch out: stopping at 42/143 gives the unconditioned probability that all three are black — it ignores that you already know at least two of them are. Dividing by the 'exactly two black' probability on its own gives 7/12, and forgets that the all-black outcomes are themselves part of the 'at least two black' group, so they must be inside the denominator, not left out of it. And 7/11 answers a different, easier question — the probability the THIRD sock is black given the FIRST TWO specifically are black — not 'at least two of the three, in any order, are black'.
- (c) 500 — Method: the expected number of successes is the number of trials multiplied by the probability, so to find the number of trials, divide the expected number by the probability. Working: let n be the number of seeds planted. Then n multiplied by 0.6 must come to 300, so n = 300 ÷ 0.6 = 500. Answer: the grower should plant 500 seeds. The distractors: 180 comes from multiplying instead of dividing, 300 × 0.6 = 180, which answers how many of 300 seeds would germinate; 750 comes from dividing by the probability of not germinating, 300 ÷ 0.4 = 750; 120 comes from multiplying by that same 0.4, 300 × 0.4 = 120.
- (a) 0.45, different from 0.4 for all the households — Method: work out the probability inside the restricted group of garden owners, then work out the probability across the whole survey, and compare the two. Working: 54 of the 120 households with a garden own a dog, so the conditional probability is 54 divided by 120, which is 0.45. Across the whole survey 80 of the 200 households own a dog, which is 0.4. Since 0.45 is not 0.4, having a garden changes the chance of owning a dog and the two events are not independent. Answer: 0.45, different from 0.4 for all the households. The distractors: 0.27 is 54/200, dividing the households with both by the whole survey instead of by the 120 with a garden; 0.675 is 54/80, the probability that a household has a garden given that it owns a dog, which is the condition and the event the wrong way round; 0.4 is 80/200, the probability of owning a dog with the garden information never used, which is why that route also reports no difference.
Build your own mix at the worksheet builder.