Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (c) 3/20 — Method: the second fraction is quoted for the perennials only, so it is a conditional probability and the two fractions multiply. Working: the probability that a plant is a perennial is 3/5, and given that it is a perennial the probability that it is in flower is 1/4. Multiplying gives 3 × 1 over 5 × 4, which is 3/20. Answer: the probability is 3/20. The distractors: 17/20 comes from adding the fractions, 12/20 plus 5/20, instead of multiplying, which would be right only for two outcomes that cannot both happen; 4/9 comes from adding the numerators and the denominators separately, the classic 3 + 1 over 5 + 4; 1/4 quotes the flowering fraction on its own, as though every plant in the garden centre were a perennial, so the 3/5 is never used.
- (d) 5 — Being red and not being red are exhaustive, so their probabilities sum to 1: the probability of red is 1 − 0.8 = 0.2. The number of red counters is 0.2 × 25 = 5. Using 0.8 directly as the probability of red, without taking the complement, gives 0.8 × 25 = 20 — the number of counters that are NOT red. Sharing the 25 counters equally between the three colours, ignoring the given probability altogether, gives 25 ÷ 3 ≈ 8. Misreading the total as 20 counters instead of 25 gives 0.2 × 20 = 4.
- (a) 0.30 — Red, blue, green and yellow are exhaustive, so all four probabilities sum to 1: 0.24 + 0.16 + x + x = 1, so 2x + 0.40 = 1, giving 2x = 0.60 and x = 0.30. Stopping at 2x = 0.60 without dividing by 2 leaves 0.60, the combined probability of both blue and green together, not the value of x on its own. Sharing the 0.60 across all four colours instead of just the two unknown ones gives 0.60 ÷ 4 = 0.15. Leaving out the 0.16 for yellow gives 2x + 0.24 = 1, so 2x = 0.76 and x = 0.38.
- (b) £0.30 profit for the stall — The stall keeps the £1.50 entry fee whatever happens, and expects to pay out prize × probability of winning = £6 × 0.2 = £1.20 on average. So its expected profit per game is £1.50 − £1.20 = £0.30. Reporting the expected pay-out of £1.20 itself as the profit forgets that the stall also keeps the entry fee. Assuming the player always wins gives an expected cost of £6 − £1.50 = £4.50, treated as a loss for the stall. Using the probability of NOT winning, 0.8, to find the expected pay-out gives £6 × 0.8 = £4.80, and £1.50 − £4.80 = −£3.30, a £3.30 loss.
- (b) 0.355 — Method: use the law of total probability across the two Monday branches: P(rain Tue) = P(rain Mon) × P(rain Tue | rain Mon) + P(no rain Mon) × P(rain Tue | no rain Mon). Working: P(no rain Mon) = 1 − 0.3 = 0.7. P(rain Tue) = (0.3 × 0.6) + (0.7 × 0.25) = 0.18 + 0.175 = 0.355. Answer: 0.355. Watch out: using only the rain-Monday branch (0.3 × 0.6) or only the no-rain-Monday branch (0.7 × 0.25) accounts for just one of the two ways Tuesday can turn out rainy — both branches must be added. And swapping which weekday-probability multiplies which branch (0.7 with the rain branch, 0.3 with the no-rain branch) uses the right numbers on the wrong branches.
- (b) 3/10 — Method: on a tree diagram, follow the path that matches the description and multiply the probabilities written along it; with nothing put back, the second set of branches is worked out from the counters that are left. Working: 3 of the 5 counters are yellow, so the first branch of the path is 3/5. A yellow counter has been kept out, so 4 counters remain and both green counters are still there, making the second branch 2/4. Multiplying along the path gives 6/20. Answer: the probability is 3/10. The distractors: 6/25 comes from using 2/5 on the second branch, which is the tree for a counter that is put back; 3/20 comes from taking one off the green count as well as off the total, using 1/4 on the second branch; 3/5 comes from reading the first branch only and never multiplying along the path.
- (c) No — 7/30 is the relative frequency; theory stays 1/6. — The theoretical probability of rolling a 6 on an ordinary dice is fixed at 1/6, worked out from the number of equally likely outcomes, and does not change however the dice is actually rolled. The relative frequency from this trial is 7/30, found from what happened in these particular 30 rolls. Since 7/30 and 1/6 are different numbers, the correct statement is 'No — 7/30 is the relative frequency; theory stays 1/6.' Assuming the two values must always match because they describe the same event gives 'Yes — relative frequency always equals theory.' Believing that an observed result redefines the theoretical probability gives 'Yes — the theoretical probability has now become 7/30.' Refusing to work out either value at all gives 'Neither can be found — 30 rolls is too few to tell', which ignores that both numbers CAN be calculated from the information given.
- (c) The green bag (7/24) — Method: fractions can only be ordered once they share a denominator, so rewrite all four over the lowest common denominator and compare the numerators. Working: the lowest common denominator of 12, 8, 24 and 3 is 24, and scaling gives 5/12 = 10/24, 3/8 = 9/24, 7/24 stays as it is, and 1/3 = 8/24; the numerators are then 10, 9, 7 and 8. Answer: the smallest numerator is 7, so the green bag, with 7/24, is the least likely and sits furthest to the left on the 0 to 1 scale. The distractors: the red bag (5/12) comes from finding the largest of the four probabilities instead of the smallest; the blue bag (3/8) comes from scaling 3/8 by changing only the denominator to 24, which turns it into 3/24 and makes it look the smallest; the yellow bag (1/3) comes from comparing numerators alone and assuming the fraction with the numerator 1 must be the smallest.
- (a) 70 — Method: two linked steps. Find the expected number of billing calls first, then take the 35% of those, because the 35% is quoted for billing calls only. Working: 40% of 500 is 200 billing calls. 35% of 200 is 70 calls. Answer: you would expect 70 calls. The distractors: 200 stops after the first step and gives the billing calls, forgetting that only some of them are dealt with quickly; 175 is 35% of 500, applying the quick response rate to every call the centre takes rather than to the billing calls only; 375 comes from adding 40% and 35% to get 75% and taking 75% of 500, which treats two stages of one journey as separate outcomes to be added.
- (d) 0.80 — Evens is exactly halfway along the scale, at 0.5, and 3/10 written as a decimal is 0.3. A probability 3/10 higher than evens is 0.5 + 0.3 = 0.80. Giving 0.30 as the answer converts the increase but never adds it to the value of evens. Adding the increase to 1, the 'certain' end of the scale, instead of to evens gives 1 + 0.3 = 1.30, which cannot be a probability. Writing 3/10 as 0.03 instead of 0.3, a place-value slip, gives 0.5 + 0.03 = 0.53.
- (a) 4/9 — Method: two steps. Find how many cars failed altogether, because the car picked is known to be one of them, then divide the diesel failures by that total. Working: 30 petrol cars and 24 diesel cars failed, so 54 cars failed. The diesel failures give 24/54, and dividing the numerator and the denominator by 6 gives 4/9. Answer: the probability is 4/9. The distractors: 3/10 is 24/80, the probability that a car fails given that it is a diesel car, which is the condition and the event swapped; 3/25 is 24/200, dividing by every car serviced that week rather than by the 54 that failed; 2/5 is 80/200, the probability that a car chosen from the whole week is a diesel car, which ignores the fact that the car picked failed.
- (c) 47 — Method: fill the first pair of branches of the frequency tree, then the failures on each branch, then add only the failing end branches. Working: 70% of 200 is 140, so 140 cars were more than 3 years old and 200 − 140 = 60 cars were 3 years old or less. One quarter of the older cars failed: 140 ÷ 4 = 35. The newer branch gives 12 failures. Adding the two failing branches gives 35 + 12 = 47. Answer: 47 of the cars failed the test. The distractors: 35 is the older branch on its own, with the 12 newer failures never added; 62 comes from taking 1 in 4 of all the cars, 200 ÷ 4 = 50, and then adding the 12; 153 is 200 − 47 and counts the cars that passed.
- (d) 5/12 — The possible totals are 2 to 12. The prime totals are 2, 3, 5, 7 and 11, with 1, 2, 4, 6 and 2 ways to make them, giving 1 + 2 + 4 + 6 + 2 = 15 outcomes out of 36, so the probability is 15/36 = 5/12. Choosing 7/18 comes from forgetting that a total of 2 counts as prime, giving 14/36 = 7/18 instead. Choosing 19/36 comes from wrongly including a total of 9 as a prime number, adding its 4 ways to the correct 15 to get 19/36. Choosing 13/36 comes from forgetting the 2 ways of making a total of 11, giving 13/36 instead of 15/36.
- (b) 12/19 — Method: turn the percentages into expected frequencies out of 1000, total the faulty pens, then divide supplier Y's faulty pens by that total, because the pen picked is known to be faulty. Working: supplier X provided 700 pens and 2% of them are faulty, which is 14 pens. Supplier Y provided 300 pens and 8% of them are faulty, which is 24 pens. Altogether 38 pens are faulty, so the probability is 24/38, and dividing the numerator and the denominator by 2 gives 12/19. Answer: the probability is 12/19. The distractors: 3/10 is supplier Y's share of the stock, the answer before the faulty information is used at all; 3/125 is 24/1000, the probability that a pen is from supplier Y and faulty, which stops at the joint probability and never divides by the probability of a fault; 4/5 is 8 divided by 2 + 8, comparing the two fault rates as though the suppliers provided equal numbers of pens, so the 70 to 30 split is thrown away.
- (b) 0.225 — The relative frequency of rain is the number of rainy days out of all days recorded: 9 ÷ 40 = 0.225, which is noticeably less than the forecaster's claimed 0.3. Using the number of dry days, 40 − 9 = 31, as the denominator instead of the total of 40 gives 9 ÷ 31 = 0.29 (2 d.p.). Simply reporting the forecaster's claimed value, 0.3, without calculating anything from the data at all, ignores the recorded results completely. Misplacing the decimal point, treating 9 out of 40 as 9%, gives 0.09 instead of 0.225.
Build your own mix at the worksheet builder.