Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (a) 952 — 68% = 0.68. The relative frequency from the survey applies to the new group of 1400 shoppers, so the expected number is 0.68 × 1400 = 952. Working out 1 − 0.68 = 0.32 and applying that instead, 0.32 × 1400 = 448, finds the number who have NOT used a self-checkout, not the number who have. Applying 68% to the original sample size of 250 instead of the new total of 1400 gives 0.68 × 250 = 170. Applying the complement percentage to the original sample size, 0.32 × 250 = 80, compounds both mistakes.
- (a) unlikely — 3/8 = 3 ÷ 8 = 0.375, which is between 0 and 0.5, so the probability is best described as unlikely. Rounding 3/8 loosely to 'about a half' without converting it properly leads to evens, which is wrong since 0.375 is noticeably below 0.5. Reading 3/8 as the complement and using 1 − 3/8 = 5/8 = 0.625 instead gives likely, but the question asks about the probability of 3/8 itself, not its complement. Flipping the fraction to 8/3 ≈ 2.67, which is impossible for a probability, and rounding it towards the top of the scale gives certain.
- (a) 0.368 — Combining both samples, the spinner landed on red 34 + 58 = 92 times out of a total of 85 + 165 = 250 spins, so the best estimate of the probability is 92/250 = 0.368. Writing 0.400 is wrong because it uses only the first sample, 34/85 = 0.400, ignoring the extra 165 spins recorded afterwards. Writing 0.352 is wrong because it uses only the second sample, 58/165 = 0.352 (to 3 decimal places), ignoring the first 85 spins. Writing 0.376 is wrong because it averages the two separate estimates, (0.400 + 0.352) ÷ 2 = 0.376, instead of combining the actual numbers of reds and spins across both samples. The best estimate of the probability that the spinner lands on red, using all 250 spins, is 0.368.
- (c) 0.31 — Method: a late bus can be reached along two paths of the tree. Multiply along each path, then add the paths that end in a late bus. Working: the rain path gives 0.3 × 0.8 = 0.24. No rain has probability 1 − 0.3 = 0.7, so the second path gives 0.7 × 0.1 = 0.07. Adding the two paths gives 0.24 + 0.07. Answer: the probability is 0.31. The distractors: 0.9 comes from adding the two branch probabilities 0.8 and 0.1 without first weighting them by how often it rains; 0.24 comes from following the rain path only and ignoring that the bus can also be late when it is dry; 0.27 comes from using 0.3 at the start of both paths, so that the no-rain path is given 0.3 × 0.1 instead of 0.7 × 0.1.
- (a) 0.09 — Method: two independent events that must both happen are combined by multiplying their probabilities. Working: the same probability 0.3 applies to each day, so the calculation is 0.3 × 0.3. Written as fractions this is 3/10 × 3/10 = 9/100. Answer: the probability is 0.09. The distractors: 0.6 comes from adding 0.3 and 0.3 instead of multiplying them; 0.3 comes from quoting the single-day probability, as though the second day added no further condition; 0.9 comes from multiplying 3 by 3 correctly but keeping only one decimal place in the product instead of two.
- (b) 4 — With 150 rolls and probability 1/6 for each number, the expected count is 150 ÷ 6 = 25. Comparing each actual count with 25: 1 is 22 (3 below), 2 is 27 (2 above), 3 is 24 (1 below), 4 is 34 (9 above), 5 is 21 (4 below) and 6 is 22 (3 below). Number 4 is furthest above its expected count, so it is the most over-represented. Number 2 is also above its expected count, but by only 2, far less than 4's 9. Number 3's count of 24 is below the expected 25, so it is under-represented, not over. Number 6's count of 22 is also below the expected 25, so it too is under-represented.
- (c) 0.37 — Method: pool the two runs into one combined set of results, then find the relative frequency of red across all of the spins together. Working: total reds = 16 + 21 = 37. Total spins = 40 + 60 = 100. Relative frequency = 37 ÷ 100 = 0.37. Answer: 0.37. Watch out: writing down 0.40 uses only the first run, 16 ÷ 40, and throws away the extra evidence from the second 60 spins. Writing down 0.35 uses only the second run, 21 ÷ 60, and throws away the first run instead. And writing down 0.375 averages the two runs' separate rates, (0.40 + 0.35) ÷ 2, which treats a run of 40 spins and a run of 60 spins as equally weighted, when pooling the actual counts gives the larger run its fair share of influence.
- (c) 1/10 — On the adult branch, 210 − 189 = 21 appointments were missed. There are 300 − 210 = 90 child appointments, and 90 − 81 = 9 of those were missed. In total, 21 + 9 = 30 appointments were missed, out of 300: 30/300 = 1/10. Writing 7/100 is wrong because 21/300 simplifies to 7/100, and 21 only counts the adult branch, leaving out the 9 missed child appointments. Writing 3/100 is wrong because 9/300 simplifies to 3/100, and 9 only counts the child branch, leaving out the 21 missed adult appointments. Writing 1/9 is wrong because it divides the 30 missed appointments by the 270 that were attended (300 − 30) instead of by the whole 300 booked. The probability is 1/10.
- (a) 1/29 — The probability that Priya's ticket wins is 6/30. Since her ticket is not returned, there are now only 5 winning tickets left out of 29 tickets in total, so the probability that Tom's ticket also wins is 5/29. Multiplying these, 6/30 × 5/29 = 30/870 = 1/29. A candidate who answers 1/25 has treated Priya's ticket as returned, using 6/30 twice. A candidate who answers 1/30 has correctly reduced the winning tickets to 5 for Tom but forgotten to reduce the total number of tickets, using 5/30 instead of 5/29. A candidate who answers 11/59 has added the numerators and added the denominators, (6+5)/(30+29), instead of multiplying.
- (a) 70 — Method: two linked steps. Find the expected number of billing calls first, then take the 35% of those, because the 35% is quoted for billing calls only. Working: 40% of 500 is 200 billing calls. 35% of 200 is 70 calls. Answer: you would expect 70 calls. The distractors: 200 stops after the first step and gives the billing calls, forgetting that only some of them are dealt with quickly; 175 is 35% of 500, applying the quick response rate to every call the centre takes rather than to the billing calls only; 375 comes from adding 40% and 35% to get 75% and taking 75% of 500, which treats two stages of one journey as separate outcomes to be added.
- (c) 102 — Method: turn the past record into a relative frequency, then use it as an estimate of the probability of rain and multiply by the number of days being predicted for. Working: relative frequency of rain = 70 ÷ 250 = 0.28. Expected rainy days in 365 days = 365 × 0.28 = 102.2, which rounds to about 102 days. Answer: about 102 days. Watch out: writing down 48 swaps which number is the sample and which is the target, working out 70 ÷ 365 × 250 instead of 70 ÷ 250 × 365. Writing down 70 just repeats the original count of rainy days without scaling it up to the new, longer period at all. And writing down 110 comes from rounding the relative frequency to 0.3 before multiplying, 365 × 0.3 = 109.5, when 70 ÷ 250 is exactly 0.28 and needs no rounding at all.
- (b) 3/10 — Method: on a tree diagram, follow the path that matches the description and multiply the probabilities written along it; with nothing put back, the second set of branches is worked out from the counters that are left. Working: 3 of the 5 counters are yellow, so the first branch of the path is 3/5. A yellow counter has been kept out, so 4 counters remain and both green counters are still there, making the second branch 2/4. Multiplying along the path gives 6/20. Answer: the probability is 3/10. The distractors: 6/25 comes from using 2/5 on the second branch, which is the tree for a counter that is put back; 3/20 comes from taking one off the green count as well as off the total, using 1/4 on the second branch; 3/5 comes from reading the first branch only and never multiplying along the path.
- (c) 100 — There are 3 even numbers on a fair dice (2, 4 and 6), so the probability of landing on an even number is 3/6 = 1/2, and 300 × 1/2 = 150. The probability of landing on a six is 1/6, so 300 × 1/6 = 50. The dice is expected to land on an even number 150 − 50 = 100 more times than on a six. Writing 50 is wrong because that is just the expected number of sixes on its own, without comparing it to the expected number of evens. Writing 150 is wrong because that is just the expected number of evens on its own, without subtracting the sixes. Writing 200 is wrong because it adds the two expected frequencies together (150 + 50 = 200) instead of finding the difference between them. The dice is expected to land on an even number 100 more times than on a six.
- (c) 15/23 — Method: find P(rough and delayed) and the overall P(delayed) using the tree, then divide. Working: P(rough and delayed) = 0.2 × 0.75 = 0.15. P(calm and delayed) = 0.8 × 0.1 = 0.08. P(delayed) = 0.15 + 0.08 = 0.23. P(rough | delayed) = 0.15 ÷ 0.23 = 15/23. Answer: 15/23. Watch out: leaving the answer as 0.15 (3/20) gives P(rough and delayed) itself, without dividing by the overall probability that a crossing is delayed. Giving 0.75 (3/4) is the probability you were told to start with — that a crossing is delayed GIVEN the sea is rough — which is the reverse of what's being asked. And 0.2 (1/5) is just the original probability that the sea is rough, before you take the fact that the crossing was delayed into account.
- (a) 0.54 — The four colours are exhaustive, so all four probabilities sum to 1: the probability of damson is 1 − 0.18 − 0.22 − 0.24 = 0.36. Amber and damson cannot both happen on one spin, so the probability of amber or damson is 0.18 + 0.36 = 0.54. Stopping after finding the probability of damson alone, without adding the probability of amber, gives 0.36. Adding the three given probabilities together, 0.18 + 0.22 + 0.24 = 0.64, and treating that total as the answer never finds the probability of damson at all. Subtracting only the probability of amber from 1, 1 − 0.18 = 0.82, ignores black, cyan and damson completely.
Build your own mix at the worksheet builder.