Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) 3/10 — Method: list the full possibility space as pairs of coin and spinner results, then count how many pairs satisfy both conditions and divide by the size of the whole space. Working: the coin gives 2 outcomes and the spinner gives 5, so the full space has 2 × 5 = 10 equally likely pairs. The pairs with a tail and an odd number are (T,1), (T,3) and (T,5), which is 3 out of 10. Answer: 3/10. Watch out: writing down 1/2 uses only the coin's own chance of a tail and ignores that the spinner also has to land on an odd number. Writing down 3/5 uses only the spinner's chance of landing on an odd number and ignores the coin altogether. And writing down 1/10 counts just one matching outcome, such as (T,1), instead of all three pairs that satisfy both conditions.
- (d) 1/3 — List the outcomes for the two spinners systematically in a 3 × 3 grid: 1-1, 1-2, 1-3, 2-1, 2-2, 2-3, 3-1, 3-2, 3-3, where the first number is the score on spinner A and the second is the score on spinner B — 9 equally likely outcomes in total. The pairs where the two numbers are the same are 1-1, 2-2 and 3-3, so there are 3 favourable outcomes. P(same number) = 3/9 = 1/3. 2/3 comes from working out the probability that the two numbers are different and then forgetting to take the complement the right way round, so the probability of "different" is given instead of the probability of "same". 1/2 comes from listing only the 6 unordered pairs 1-1, 2-2, 3-3, 1-2, 1-3, 2-3 instead of all 9 ordered outcomes in the grid, then taking 3 out of that 6. 1/9 comes from spotting only one of the three matching pairs, such as 1-1, and missing 2-2 and 3-3.
- (c) 0.31 — Method: a late bus can be reached along two paths of the tree. Multiply along each path, then add the paths that end in a late bus. Working: the rain path gives 0.3 × 0.8 = 0.24. No rain has probability 1 − 0.3 = 0.7, so the second path gives 0.7 × 0.1 = 0.07. Adding the two paths gives 0.24 + 0.07. Answer: the probability is 0.31. The distractors: 0.9 comes from adding the two branch probabilities 0.8 and 0.1 without first weighting them by how often it rains; 0.24 comes from following the rain path only and ignoring that the bus can also be late when it is dry; 0.27 comes from using 0.3 at the start of both paths, so that the no-rain path is given 0.3 × 0.1 instead of 0.7 × 0.1.
- (b) 1/12 — Method: the coin does not affect the dice, so the two events are independent and the probability that both happen is the product of their probabilities. Working: heads has probability 1/2 and a 6 on an ordinary dice has probability 1/6. Multiplying gives 1 on the top and 2 × 6 = 12 on the bottom. Answer: the probability is 1/12. The distractors: 2/3 comes from adding 1/2 and 1/6 instead of multiplying them; 1/6 comes from using the dice alone and ignoring the condition on the coin; 1/8 comes from counting the possible results as 6 + 2 = 8 and treating the winning result as one of those eight.
- (d) 1/20 — Method: add the counts on the faulty end branches, divide by the total number of items in the experiment, then cancel. Working: the faulty items number 15 + 5 = 20, and 400 items were checked, so the probability is 20/400. Dividing the top and the bottom by 20 gives 1/20. Answer: the probability is 1/20. The distractors: 3/50 is 15/250 and comes from dividing machine A's faults by machine A's output, which is that machine's own fault rate rather than the probability for the whole batch; 1/30 is 5/150 and does the same on machine B's branch; 19/20 is 380/400 and gives the probability that the item picked is not faulty.
- (a) Game B, by £8 — Game A's expected total is 40 × 0.2 × £5 = £40. Game B's expected total is 40 × 0.1 × £12 = £48. Game B is higher, by £48 − £40 = £8. Writing 'Game A, by £8' is wrong because it has the right difference but the wrong game — Game A's total (£40) is actually LOWER than Game B's, not higher. Writing 'Game B, by £48' is wrong because £48 is Game B's whole expected total, not the DIFFERENCE between the two games. Writing 'Game A, by £40' is wrong in the same way, using Game A's whole total as if it were the margin, and naming the wrong game as the winner. Game B gives the higher expected total, by £8.
- (a) 4/15 — Method: first find how many pupils travel only by car, then write that as a fraction of the 60 pupils surveyed. Working: pupils who walk or cycle or both = 32 + 24 − 12 = 44. Only by car = 60 − 44 = 16. P(only by car) = 16/60 = 4/15. Answer: 4/15. Watch out: writing down 1/5 takes the overlap of 12 pupils on its own, 12/60, mistaking the group who do both for the group who travel only by car. Writing down 4/5 comes from 60 − 12 = 48, subtracting only the overlap from the total instead of the whole walk-or-cycle count, so cyclists and walkers who are not in the overlap are wrongly swept into the only-car group. And writing down 7/15 comes from 60 − 32 = 28, subtracting the walkers alone and forgetting the cyclists altogether.
- (b) 100 — The sample shows a proportion of 8/60 = 2/15 faulty. Apply that proportion to the new batch of 750: 750 × 2/15 = 100. Flipping the ratio, calculating 8/750 × 60 instead of 8/60 × 750, gives 0.64, which rounds to about 1. Assuming the same number of faulty items applies to the new batch, without scaling for its larger size, just repeats the sample's count of 8. Rounding the proportion 8/60 = 0.1333... down to 0.1 before multiplying gives 750 × 0.1 = 75.
- (b) 0.355 — Method: use the law of total probability across the two Monday branches: P(rain Tue) = P(rain Mon) × P(rain Tue | rain Mon) + P(no rain Mon) × P(rain Tue | no rain Mon). Working: P(no rain Mon) = 1 − 0.3 = 0.7. P(rain Tue) = (0.3 × 0.6) + (0.7 × 0.25) = 0.18 + 0.175 = 0.355. Answer: 0.355. Watch out: using only the rain-Monday branch (0.3 × 0.6) or only the no-rain-Monday branch (0.7 × 0.25) accounts for just one of the two ways Tuesday can turn out rainy — both branches must be added. And swapping which weekday-probability multiplies which branch (0.7 with the rain branch, 0.3 with the no-rain branch) uses the right numbers on the wrong branches.
- (b) 4 — With 150 rolls and probability 1/6 for each number, the expected count is 150 ÷ 6 = 25. Comparing each actual count with 25: 1 is 22 (3 below), 2 is 27 (2 above), 3 is 24 (1 below), 4 is 34 (9 above), 5 is 21 (4 below) and 6 is 22 (3 below). Number 4 is furthest above its expected count, so it is the most over-represented. Number 2 is also above its expected count, but by only 2, far less than 4's 9. Number 3's count of 24 is below the expected 25, so it is under-represented, not over. Number 6's count of 22 is also below the expected 25, so it too is under-represented.
- (d) 1/8 — The multiples of 3 from 1 to 8 are 3 and 6, so the probability of that event is 2/8, which simplifies to 1/4. The probability of the coin landing on heads is 1/2. Since the spin and the toss are independent, multiply the two probabilities: 1/4 × 1/2 = 1/8. A candidate who answers 1/4 has considered only the spinner and forgotten to combine it with the coin toss. A candidate who answers 1/2 has considered only the coin and forgotten the spinner condition entirely. A candidate who answers 1/16 has counted only one number, 6, as a multiple of 3 instead of two, giving 1/8 × 1/2.
- (a) 0.48 — There are two ways to score exactly one throw: scoring on the first and missing the second, 0.6 × 0.4 = 0.24, or missing the first and scoring the second, 0.4 × 0.6 = 0.24. Adding these gives 0.24 + 0.24 = 0.48. Choosing 0.24 comes from working out only one of the two paths and forgetting the other one also gives exactly one score. Choosing 0.36 comes from working out the probability of scoring BOTH throws, 0.6 × 0.6 = 0.36, instead of exactly one. Choosing 0.84 comes from working out the probability of scoring AT LEAST one throw, 1 − 0.4 × 0.4 = 0.84, instead of exactly one.
- (c) 0.512 — Method: independent events that must all happen are combined by multiplying their probabilities. Working: the first two questions give 0.8 × 0.8 = 0.64. Bringing in the third gives 0.64 × 0.8, and since 64 × 8 = 512 with three decimal places in the product, this is 0.512. Answer: the probability is 0.512. The distractors: 0.64 comes from multiplying only two of the three probabilities and stopping; 0.8 comes from reading 'independent' as meaning the probability never changes and writing down the single-question figure; 0.0512 comes from a place-value slip in the last multiplication, counting four decimal places instead of three.
- (c) 26 — The number who play football or basketball is 27 + 21 − 9 = 39, subtracting the 9 who play both so they are not counted twice. The number who play neither is then 65 − 39 = 26. Giving 39 stops after finding the number who play football or basketball, without taking the complement within the 65 members. Subtracting all three given numbers from 65, 65 − 27 − 21 − 9 = 8, treats the 9 who play both as a separate group rather than a correction for double-counting. Adding 27 and 21 without removing the double-counted 9, then subtracting that total from 65, gives 65 − (27 + 21) = 17.
- (a) 75% — 'Percentage of the women' restricts the group to the 80 women, of whom 60 attend yoga: 60/80 = 0.75 = 75%. Dividing by the number of men (200 − 80 = 120) instead of the number of women gives 60/120 = 0.5 = 50%. Dividing by all 200 members instead of just the 80 women gives 60/200 = 0.3 = 30%. Using the 20 women who do NOT attend yoga (80 − 60) as the numerator instead of the 60 who do gives 20/80 = 0.25 = 25%.
Build your own mix at the worksheet builder.