Printable · GCSE Higher · ages 14-16
Probability worksheet — GCSE Higher
Fifteen questions across the probability statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (a) 4/9 — There are 3 × 6 = 18 equally likely outcomes. The product is a multiple of 5 whenever Spinner C shows 5, whatever Spinner D shows, which is 6 outcomes, or whenever Spinner D shows 5 and Spinner C shows 2 or 3, which is 2 more outcomes. This gives 6 + 2 = 8 outcomes, so the probability is 8/18 = 4/9. Choosing 1/3 comes from only counting the 6 outcomes where Spinner C shows 5 and forgetting the 2 outcomes where Spinner D shows 5 instead. Choosing 1/9 comes from only counting the 2 outcomes where Spinner D shows 5 and forgetting the 6 outcomes where Spinner C shows 5. Choosing 1/2 comes from counting 9 outcomes instead of 8, by listing the case where Spinner C shows 5 and Spinner D shows 5 twice over.
- (a) 17/32 — Because the counter is replaced, each pick is independent with P(red) = 5/8 and P(blue) = 3/8 every time. Both red has probability 5/8 × 5/8 = 25/64, and both blue has probability 3/8 × 3/8 = 9/64. 'Same colour' means either of these, so add them: 25/64 + 9/64 = 34/64 = 17/32. Giving 25/64 finds only the probability of both counters being red, leaving out both counters being blue, which also counts as the same colour. Giving 15/64 finds the probability of one red and one blue counter in just one of the two possible orders — the opposite of what was asked, and only half of it. Giving 13/28 works out the probabilities as if the counter had NOT been replaced, using 5/8 × 4/7 and 3/8 × 2/7, even though the question states it was put back.
- (a) 1200 — Method: take the estimate from the larger sample, because an unbiased relative frequency tends towards the true probability as the sample grows, then multiply by the number of bulbs made in a week. Working: Inspector B tested 500 bulbs, far more than Inspector A's 40, so use B's relative frequency: 30 ÷ 500 = 0.06. A week's production is 4000 × 5 = 20000 bulbs. The expected number of faulty bulbs is 20000 × 0.06 = 1200. Answer: about 1200 faulty bulbs a week. The distractors: 2000 uses Inspector A's estimate, 4 ÷ 40 = 0.1, giving 20000 × 0.1 = 2000, and so rests on a sample of only 40 bulbs; 1600 comes from averaging the two estimates of 0.1 and 0.06 to get 0.08, and 20000 × 0.08 = 1600, which gives the small sample equal weight with the large one; 240 uses the right estimate but stops at a single day, 4000 × 0.06 = 240.
- (a) 70 — Method: two linked steps. Find the expected number of billing calls first, then take the 35% of those, because the 35% is quoted for billing calls only. Working: 40% of 500 is 200 billing calls. 35% of 200 is 70 calls. Answer: you would expect 70 calls. The distractors: 200 stops after the first step and gives the billing calls, forgetting that only some of them are dealt with quickly; 175 is 35% of 500, applying the quick response rate to every call the centre takes rather than to the billing calls only; 375 comes from adding 40% and 35% to get 75% and taking 75% of 500, which treats two stages of one journey as separate outcomes to be added.
- (b) 37/75 — There are 150 − 84 = 66 men. 84 − 50 = 34 women prefer weight training, and 40 men prefer weight training, so 34 + 40 = 74 people in total prefer weight training, out of 150: 74/150 = 37/75. Writing 4/15 is wrong because it only counts the men who prefer weight training (40/150, simplified), leaving out the 34 women. Writing 17/75 is wrong because it only counts the women who prefer weight training (34/150, simplified), leaving out the 40 men. Writing 37/42 is wrong because it uses the number of women (84) as the denominator instead of the whole gym (150) — 74/84 simplifies to 37/42, but that is not a probability out of the whole group. The probability is 37/75.
- (b) 120 — Purple's probability is its angle out of the full circle: 144° ÷ 360° = 2/5. Expected number on purple = 2/5 × 300 = 120. Assuming the three colours are equally likely, ignoring their different angles, gives 300 ÷ 3 = 100. Using orange's angle, 90°, instead of purple's 144° gives a probability of 1/4, so 300 × 1/4 = 75. Treating 144 as a percentage instead of finding its fraction of 360° gives 300 × 0.144 = 43.2, which rounds to 43.
- (b) 3/10 — Method: on a tree diagram, follow the path that matches the description and multiply the probabilities written along it; with nothing put back, the second set of branches is worked out from the counters that are left. Working: 3 of the 5 counters are yellow, so the first branch of the path is 3/5. A yellow counter has been kept out, so 4 counters remain and both green counters are still there, making the second branch 2/4. Multiplying along the path gives 6/20. Answer: the probability is 3/10. The distractors: 6/25 comes from using 2/5 on the second branch, which is the tree for a counter that is put back; 3/20 comes from taking one off the green count as well as off the total, using 1/4 on the second branch; 3/5 comes from reading the first branch only and never multiplying along the path.
- (a) 1/6 — Method: write the results of the two dice as ordered pairs, count the pairs whose scores add to the total asked for, divide by the number of ordered pairs there are, then cancel the fraction down. Working: there are 6 × 6 = 36 equally likely ordered pairs. The pairs whose scores add to 7 are (1, 6), (2, 5), (3, 4), (4, 3), (5, 2) and (6, 1), which is 6 pairs, so the probability is 6/36. Dividing the top and the bottom by 6 gives 1/6. Answer: the probability is 1/6. The distractors: 7/36 comes from taking the number of favourable pairs to be 7 because 7 is the total asked for, confusing the size of a total with the number of ways of making it; 1/7 comes from using the 21 different combinations of two scores as the equally likely results, finding the 3 combinations 1 and 6, 2 and 5, 3 and 4, and cancelling 3/21; 6/11 comes from counting the 6 favourable pairs correctly but dividing by the 11 possible totals from 2 to 12 rather than by the 36 pairs.
- (b) £0.30 profit for the stall — The stall keeps the £1.50 entry fee whatever happens, and expects to pay out prize × probability of winning = £6 × 0.2 = £1.20 on average. So its expected profit per game is £1.50 − £1.20 = £0.30. Reporting the expected pay-out of £1.20 itself as the profit forgets that the stall also keeps the entry fee. Assuming the player always wins gives an expected cost of £6 − £1.50 = £4.50, treated as a loss for the stall. Using the probability of NOT winning, 0.8, to find the expected pay-out gives £6 × 0.8 = £4.80, and £1.50 − £4.80 = −£3.30, a £3.30 loss.
- (b) The relative frequency is settling near 0.5 — Method: turn each result into a relative frequency before comparing them, because it is the relative frequency, and not the difference between the two counts, that tends towards the theoretical probability. Working: after 10 flips the relative frequency of a head is 7 ÷ 10 = 0.7, which is a long way from 0.5. After 1000 flips it is 528 ÷ 1000 = 0.528, which is much closer to 0.5. Meanwhile the gap between the two counts has grown rather than shrunk: it was 7 − 3 = 4 after 10 flips and is 528 − 472 = 56 after 1000 flips. Answer: the relative frequency is settling near 0.5, which is what an unbiased experiment does as the sample grows. The distractors: saying the counts are levelling out is the usual form of this idea and the figures contradict it, since the gap went from 4 to 56; saying the coin is biased treats 28 extra heads in 1000 flips as proof, when 0.528 sits close to 0.5 and a fair coin gives results like this often; saying the next flip is more likely to be a tail is the gambler's fallacy, since each flip stays at 1/2 whatever came before.
- (c) 0.04 — Method: 'made by machine B and faulty' is the second branch of a tree followed after the first, so multiply the probability of machine B by the probability of a fault given machine B. Working: machine B makes 0.4 of the bolts, and 0.1 of those bolts are faulty, so the probability is 0.4 × 0.1 = 0.04. Answer: the probability is 0.04. The distractors: 0.5 comes from adding 0.4 and 0.1 instead of multiplying, treating two stages of one journey as two separate outcomes; 0.1 gives the fault rate for machine B on its own, as though every bolt in the factory came from machine B, so the 40% share is never used; 0.07 is 0.6 × 0.05 added to 0.4 × 0.1, the probability that a bolt is faulty whichever machine made it, which answers a question about all the production rather than about machine B.
- (b) 12/25 — List every outcome as an ordered pair (first dice, second dice) out of the 25 equally likely outcomes. The pairs with a difference of exactly 2 are (1, 3), (3, 1), (2, 4), (4, 2), (3, 5) and (5, 3), the pairs with a difference of 3 are (1, 4), (4, 1), (2, 5) and (5, 2), and the pairs with a difference of 4 are (1, 5) and (5, 1), giving 6 + 4 + 2 = 12 outcomes with a difference of at least 2, so the probability is 12/25. Choosing 13/25 comes from finding the probability that the two scores differ by LESS than 2 instead, using the remaining 13 outcomes, the opposite of what was asked. Choosing 10/25 comes from forgetting the two outcomes where the difference is 4, (1, 5) and (5, 1), and adding only the difference-2 and difference-3 outcomes, 6 + 4 = 10 out of 25. Choosing 6/25 comes from counting only the pairs with a difference of exactly 2, forgetting that differences of 3 and 4 also count as at least 2.
- (d) 0.80 — Evens is exactly halfway along the scale, at 0.5, and 3/10 written as a decimal is 0.3. A probability 3/10 higher than evens is 0.5 + 0.3 = 0.80. Giving 0.30 as the answer converts the increase but never adds it to the value of evens. Adding the increase to 1, the 'certain' end of the scale, instead of to evens gives 1 + 0.3 = 1.30, which cannot be a probability. Writing 3/10 as 0.03 instead of 0.3, a place-value slip, gives 0.5 + 0.03 = 0.53.
- (b) 12/19 — Method: turn the percentages into expected frequencies out of 1000, total the faulty pens, then divide supplier Y's faulty pens by that total, because the pen picked is known to be faulty. Working: supplier X provided 700 pens and 2% of them are faulty, which is 14 pens. Supplier Y provided 300 pens and 8% of them are faulty, which is 24 pens. Altogether 38 pens are faulty, so the probability is 24/38, and dividing the numerator and the denominator by 2 gives 12/19. Answer: the probability is 12/19. The distractors: 3/10 is supplier Y's share of the stock, the answer before the faulty information is used at all; 3/125 is 24/1000, the probability that a pen is from supplier Y and faulty, which stops at the joint probability and never divides by the probability of a fault; 4/5 is 8 divided by 2 + 8, comparing the two fault rates as though the suppliers provided equal numbers of pens, so the 70 to 30 split is thrown away.
- (c) 0.37 — Method: pool the two runs into one combined set of results, then find the relative frequency of red across all of the spins together. Working: total reds = 16 + 21 = 37. Total spins = 40 + 60 = 100. Relative frequency = 37 ÷ 100 = 0.37. Answer: 0.37. Watch out: writing down 0.40 uses only the first run, 16 ÷ 40, and throws away the extra evidence from the second 60 spins. Writing down 0.35 uses only the second run, 21 ÷ 60, and throws away the first run instead. And writing down 0.375 averages the two runs' separate rates, (0.40 + 0.35) ÷ 2, which treats a run of 40 spins and a run of 60 spins as equally weighted, when pooling the actual counts gives the larger run its fair share of influence.
Build your own mix at the worksheet builder.