Printable · GCSE Higher · ages 14-16
Statistics worksheet — GCSE Higher
Fifteen questions across the statistics statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Statistics worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.Amelia's mean mark over four tests is 29. Her first three marks are 31, 26 and 26. Work out her fourth mark.
- 2.A scatter graph shows the number of hours of sunshine, x, and the number of visitors, y, at an outdoor swimming pool in Torquay on each of 15 days. The line of best fit passes through the points (5, 150) and (15, 350). Work out the estimated number of visitors on a day with 8 hours of sunshine, using the line of best fit.
- 3.The masses, m kg, of 160 fish caught by a trawler in one day are grouped into classes of unequal width: 0 ≤ m < 10, 40 fish; 10 ≤ m < 30, 60 fish; 30 ≤ m < 45, 30 fish; 45 ≤ m < 50, 30 fish. A histogram is to be drawn from this table. Which set of frequency densities, listed in the same order as the classes above, is correct?
- 4.A council wants to find out what all residents of a town think about a new cycle lane. It posts a survey only on its website and asks people to fill it in online. Give a reason why this sample is likely to be biased.
- 5.A two-way table records whether each of the 30 pupils in a class passed maths and whether they passed science. 18 pupils passed maths, 12 pupils passed science and 8 pupils passed both. Work out how many pupils passed at least one of the two subjects.
- 6.The marks scored by 11 pupils in a test are given in order: 12, 15, 18, 21, 24, 27, 30, 33, 36, 39, 42. Work out the lower quartile of these marks.
- 7.A factory makes a batch of 4,000 circuit boards. It checks a random sample of 50 boards and finds that 4 are faulty. The factory will scrap the whole batch if the estimated number of faulty boards in the batch is more than 250. Should the factory scrap the batch?
- 8.A call centre records the length, t seconds, of 100 calls: 0 ≤ t < 20, 15 calls; 20 ≤ t < 30, 24 calls; 30 ≤ t < 50, 40 calls; 50 ≤ t < 80, 21 calls. The manager's target is for a call to be finished in under 35 seconds. Estimate the number of calls that met the target.
- 9.A recruitment agency in Manchester compares the weekly pay, in pounds, of seven employees at two branches. Branch A: £480, £495, £500, £505, £510, £515, £1,200. Branch B: £480, £490, £500, £510, £520, £530, £540. An advert for the agency claims 'Branch A pays more on average.' Decide whether this claim is fairly supported, using an appropriate average, and choose the correct conclusion.
- 10.Two classes sat the same maths test, both marked out of 100. Class A had a mean mark of 70 and a range of 30 marks. Class B had a mean mark of 70 and a range of 10 marks. Compare the marks of the two classes.
- 11.A scatter graph has 50 points. Most of them lie close to a rising line of best fit, but two of them lie a long way from that line. Write down how those two points should be treated.
- 12.The masses, m grams, of 100 apples are grouped like this: 100 ≤ m < 120, 10 apples; 120 ≤ m < 140, 30 apples; 140 ≤ m < 160, 40 apples; 160 ≤ m < 200, 20 apples. Estimate the median mass.
- 13.A histogram shows the speeds, v mph, of 100 vehicles passing a checkpoint. The bar for 0 ≤ v < 20 has a frequency density of 1 vehicle per mph, the bar for 20 ≤ v < 30 has a frequency density of 3 vehicles per mph, the bar for 30 ≤ v < 50 has a frequency density of 2 vehicles per mph, and the bar for 50 ≤ v < 70 has a frequency density of 0.5 vehicles per mph. Estimate the mean speed of the vehicles.
- 14.A charity shop in Bath holds 2,000 books. Volunteer A checks a random sample of 50 books and finds 35 paperbacks. Volunteer B checks a different random sample of 50 books and finds 31 paperbacks. Work out the estimate each sample gives for the whole stock, and write down what the shop should do next.
- 15.A factory makes 4,000 light bulbs a day. In a random sample of 80 of one day's bulbs, 3 were faulty. Work out an estimate for the number of faulty bulbs the factory makes in a day.
Build your own mix at the worksheet builder.