Printable · GCSE Higher · ages 14-16
Statistics worksheet — GCSE Higher
Fifteen questions across the statistics statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Statistics worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A cumulative frequency graph for the diameters, d mm, of 320 ball bearings is plotted from these points (upper class boundary, cumulative frequency): (10, 30), (20, 90), (30, 190), (40, 280), (50, 320). Estimate the diameter below which 90% of the ball bearings measure.
- 2.A composite (stacked) bar for a charity bake sale in Durham shows the number of cakes sold, split into three types. The bar has a total height of 80 cakes: 34 were sponge cakes, 26 were chocolate cakes and the rest were fruit cakes. Work out the percentage of the cakes sold that were fruit cakes.
- 3.The times, t minutes, of 80 journeys are summarised by these cumulative frequencies: t < 10, 8 journeys; t < 20, 28 journeys; t < 30, 52 journeys; t < 40, 72 journeys; t < 50, 80 journeys. Estimate the interquartile range.
- 4.The times, t minutes, taken by 120 runners to finish a fun run are summarised by these cumulative frequencies: t < 20, 8 runners; t < 30, 26 runners; t < 40, 74 runners; t < 50, 110 runners; t < 60, 120 runners. Work out the number of runners who took 40 minutes or longer to finish.
- 5.A scatter graph shows the height, x cm, and the mass, y kg, of 20 pupils in Year 10. The heights on the graph run from 150 cm to 180 cm, and the line of best fit is y = 0.9x − 85. Nadia puts x = 90 into this equation to estimate the mass of a two-year-old child who is 90 cm tall. Is her estimate reliable? Give a reason for your answer.y = 0.9x − 85
- 6.The times, in seconds, taken by 11 runners to finish a race are given in order: 40, 42, 45, 47, 50, 52, 55, 58, 60, 63, 65. Work out the upper quartile of these times.
- 7.The numbers 2, 4, 6, 8, 10 and 12 have a mean of 7 and a median of 7. The value 100 is now added to the list. Which measure is changed more by adding 100, and why?
- 8.The midday temperature in Leeds was recorded on each day of one week: 22 °C, 24 °C, 23 °C, 25 °C, 26 °C, 21 °C, 24 °C. Work out the mean midday temperature, giving your answer to 2 decimal places.
- 9.Box plots summarise house prices, in thousands of pounds, in two towns. Town A: minimum 120, lower quartile 180, median 220, upper quartile 310, maximum 520. Town B: minimum 95, lower quartile 175, median 235, upper quartile 260, maximum 340. A buyer wants the town where house prices are typically higher but more consistent. Which statement is correct?
- 10.A charity shop in Bath holds 2,000 books. Volunteer A checks a random sample of 50 books and finds 35 paperbacks. Volunteer B checks a different random sample of 50 books and finds 31 paperbacks. Work out the estimate each sample gives for the whole stock, and write down what the shop should do next.
- 11.Two classes at a school in Coventry sit the same maths test, out of 20 marks. Class A has a mean mark of 14 and a range of 6. Class B has a mean mark of 14 and a range of 14. Write a sentence comparing the two classes, using the mean and the range.
- 12.For each of 30 fires in one county, the number of fire engines sent and the cost of the damage were recorded. The scatter graph of the data shows strong positive correlation. A newspaper prints the headline "Sending more fire engines causes more damage". Is the newspaper right? Give a reason for your answer.
- 13.Two classes sat the same maths test, both marked out of 100. Class A had a mean mark of 70 and a range of 30 marks. Class B had a mean mark of 70 and a range of 10 marks. Compare the marks of the two classes.
- 14.A pie chart shows how 180 shoppers at a supermarket paid for their shopping. The sector for card payments has an angle of 90° at the centre. Work out how many of the 180 shoppers paid by card.
- 15.A factory makes a batch of 4,000 circuit boards. It checks a random sample of 50 boards and finds that 4 are faulty. The factory will scrap the whole batch if the estimated number of faulty boards in the batch is more than 250. Should the factory scrap the batch?
Build your own mix at the worksheet builder.